Clients:
1. LUKOIL: EPC for produced water treatment and water injection facilities expansion at West Qurna 2 project for LUKOIL in Iraq. The project includes the construction of a new water treatment and distribution plant for water injection, in addition to the expansion of the existing system.
2. BGC Shell (Iraq): BNGL project involves gathering the currently flared gas and developing a greater processing capacity for increasing volumes of gas and Natural Gas Liquids (NGLs). Some of this capacity expansion will be achieved via the rehabilitation of existing facilities at the North Rumaila and Khor Al Zubair NGL Plants (NR NGL and KAZ) and some via new developments. The design of the Basrah NGL project facilities and infrastructures have been split into four work packages: ISBL, OSBL, Pipelines and Tie-in facilities, and IBC Brownfield Upgrade.
3. ENI: The redevelopment project primarily involves drilling more than 200 wells, construction of treatment and storage facilities, and refurbishing the existing facilities.
The new oil and gas processing plant are capable of treating 80, 000 barrels of crude oil a day. Six crude oil storage tanks with a capacity of 58, 000m³ each were installed at the site.

HSE Manager Saudi Arabia في Sicim Italy
  • المملكة العربية السعودية - ينبع
  • يونيو 2021 إلى يناير 2022

Requested by Sicim HSE Director to assist in HSE structures on the project.
The project objective is to build a new sales gas delivery system for its new desalination plant at Yanbu 3 in Al Madinah Province. SALINE WATER CONVERSION CORPORATION (SWCC) and Saudi Arabian Oil Company (Saudi Aramco) have agreed to the development of a Design Basis Scoping Paper (DBSP) in connection with the development, construction, and operation of the SWCC gas supply facilities associated with the new Power plant and Desalination plant. The new sales gas delivery system will tie in into the existing SAUDI ARAMCO gas network.
The Scope of Supply generally includes all required facilities from the interface with the Saudi Aramco main pipeline at KP-19 to the existing boiler gas inlet flanges within the Yanbu 3 Power Plant.
The objective of the SWCC Project is for a new Fuel Gas Regulation Station shall be installed at Yanbu 3 location, downstream of S.A. dedicated facilities.

HSE Director في JJ Civils
  • جنوب أفريقيا - كيب تاون
  • يونيو 2020 إلى مايو 2021

Company JJ Civils, I am a silent investor in the company, I decided to join my business partner in the company while in between projects to assist in auditing and implementation of all HSE management systems to achieve ISO 45001 certification. During this period the COVID - 19 Global Pandemic began, and I continued to assist the company. The company is involved in project management of new installations of fibre optical design and installation on Solar PV, off-grid, and grid-tied systems and HSE consultancy for Solar and wind farm projects throughout South Africa.

HSE Manager في WorleyParsons (Tanap)
  • تركيا - أنقرة
  • فبراير 2017 إلى نوفمبر 2019

Budget: US$11 Billion

Spearhead and control all activities associated with the on-site health and safety department. Steer deliberate effort in early works construction, contractor document review, and approval process. Oversee TEKFEN Construction Company and report directly to the organisation’s top management. Executed all the WorleyParsons/TANAP health and safety standards on the project; introduced and implemented a highly effective management system.
Key Projects: Sasol Technologies Pipeline & plant upgrade, Petosa Plant upgrade, Tanap pipeline & operation phase.
1850km, 48” Lot 4-512 KM Trans Anatolian Natural Gas Pipeline Turkey Tanap Project, 2018-2019
Budget: US$11 Billion • Team Size: 34 • Methodology/Tools: World Bank requested my management system to be used throughout the project.
 Followed HSE management systems and KPIs implementation by TANAP and the project contractors.
 Delivered verification and assurance on HSE performance in line with the TANAP policies and procedures.

HSE Manager في WorleyParsons
  • تركيا - أنقرة
  • فبراير 2015 إلى ديسمبر 2017

Project Value US$11 Billion

I manage LOT 3 Spread 5 & 6 Health & Safety department on site. Involved in early works of camp construction, Contractors' Document review and approval process. Manage the construction of LOT 3 Spread 5 & 6 - 509km of the 56” Trans-Anatolian Natural Gas Pipeline (TANAP). My roles and responsibilities were to manage TEKFEN construction company and report directly to TANAP, I implemented all the WorleyParsons health and safety standards on the project as well as implemented my own management systems which later was adopted by the other LOTs on the project. To date 30 March 2017, we have achieved over 12 000 000 man-hours LTI free which has been a great milestone for the Entire TANAP project over all 3 lots including the Limak Port.

Spearhead and control all activities associated with the on-site health and safety department. Steer deliberate effort in early works construction, contractor document review, and approval process. Oversee TEKFEN Construction Company and report directly to the organisation’s top management. Executed all the WorleyParsons/TANAP health and safety standards on the project; introduced and implemented a highly effective management system.


1850km, 56” LOT 3-513 KM Trans Anatolian Natural Gas Pipeline (TANAP), 2015-2017
Budget: US$11 Billion • Team Size: 37 • Methodology/Tools: Tanap & personal management systems
 Headed the construction of approximately 509 km 56” of pipelines, starting from Yıldızeli to Eskişehir, including 14 Block valve stations, 2 pig stations, and other required facilities.
 Achieved over 12 000 000-man hours LTI free which has been a great milestone for the Entire TANAP project overall 4 Lots, Stations, Compressor Stations, offshore & the Limak Port.

HSE Manager في WorleyParsons
  • جنوب أفريقيا
  • يناير 2013 إلى ديسمبر 2014

Budget: US$200 Million • Team Size: 25 • Methodology/Tools: Safety Observation Behaviour & Training systems
 Successfully managed the expansion project that increased ROMPCO’s gas transmission capacity.
 Built Loop Line 1 to transport gas to customers at the energy hub of Ressano Garcia in Mozambique.
 Led expansion in a capacity that enabled the generation of over 400 MW of power at Ressano Garcia.
 Integrated energy and chemicals company Sasol Technology upgrade in Mozambique Temane Vilanculos. A Compression project at the working CPF plant as well as a 127 KM pipeline from the CPF. All work was completed during brownfields. Completed December 2014 before my company pulled me over to Turkey to complete the Tanap pipeline. We have been in brownfield on the Tanap job for the past 8 months. The entire area of the Tanap metering and compressor stations are brownfields and pigging and Block valve stations.

HSE Manager في Brison Group Of Companies
  • جنوب أفريقيا
  • يونيو 2009 إلى نوفمبر 2013

Implemented and monitored organisational health, safety, and environmental policies. Charged with the system developments and monitoring for the company, including the manufacturing facilities, actual construction sites, and construction of processing plants.
Key Accomplishments:
 Worked within the group involved in activities ranging from manufacturing concrete products, selling reinforcing steel, selling Architectural Aluminium Windows, procurement of materials for companies in the oil & gas industry, and provision of professional engineering, and financial management services.
 From 2002 many years after all the expansion work on PETROSA, I was the HSSE manager for a company that was one of their main vendors to this plant.

Director في Plumbing Company
  • جنوب أفريقيا
  • يونيو 2007 إلى يونيو 2009

As part of the SAICE program for developing new skilled professionals for the shortage of engineers deployed at councils throughout South Africa, my duties included the mentoring of an EPWP (Expanded Public Works Program) official in his duties and core functions as contracts manager on various EPWP labour intensive projects. Mentoring responsibilities included compilation of contract documentation, management of projects from inception to completion as well as identifying potential projects and forecasting of associated budgets for a 3-year budget plan.

HSE Project Manager في Brison Group of Companies
  • جنوب أفريقيا - كيب تاون
  • يوليو 2002 إلى يناير 2007

Worked proactively within a group accomplishing various activities ranging from manufacturing concrete products, selling reinforcing steel, procurement of Materials for Companies in the oil & gas industry, and provision of professional engineering and financial management services. The director of the company assigned me to implement all Health, Safety & Environmental Management Systems, Policies, system developments & procedures and monitoring systems for the company as a whole in the factory and on all the site locations new developments & working gas plants. This included the Manufacturing facilities as well as the actual construction sites & construction of Processing Plants and the oil and gas industry

HSE Representative في Bomfords
  • المملكة المتحدة - برمنجهام
  • يناير 1999 إلى أبريل 2001

Health & Safety Representative, Bomford Ltd., United Kingdom

Assistant Radiography في CBI
  • جنوب أفريقيا - Saldanha
  • مارس 1998 إلى يناير 1999

CBI - Chicago Bridge and Iron Company Saldanha Bay Steel Mill, South Africa

الخلفية التعليمية

دبلوم, Health and Safety
  • في Shields
  • يونيو 2011

Business Management, Project Management, Health and Safety & Environment degree, Hazard ID Risk assessment & SHE system tools, CSS training on estimating & Valuations. 2017 - Currently Studying NEBOSH International Diploma. Durban Technikon NOSA Training Institution ASTUTIS UK Matric Business Management Project Management Advanced SAMTRAC Incident Investigation Level 3 Hazard Identification and Risk Assessment (HIRA) Root Cause Analysis Emergency Evacuation Procedures Strategic Risk Planning Confined Spaces Working at Height Fall Arrest & Rescue NEBOSH Diploma

Specialties & Skills

Project Management
Risk Control
Hazard Analysis
Root Cause Analysis
Incident Analysis
Hazard ID
, Health and Safety & Environment
Risk assessment & SHE system tools

الهوايات

  • Surfing
    I have been surfing since I was 11 Years old and still love to surf when I have free time.