Working as Freelancer for Environmental & Ecological Consultant.
INSTITUTION
NEERI is a distinguished CSIR Institute which, while fulfilling its
commitment towards the National and social missions. NEERI offers
technical advice for Research and consultancy services in field of
Environment and Development.
CONFERENCE
ACCREDITATION
▪ International Conference On Environmental Impact And Risk
Assessment (NEERI -EIRA 2007)
▪ Presentations in MoEF For Environmental Clearances for various EIA
Projects.
- Accredited as Ecologist from Quality Council of India/NABET.
M. Theses :- “National Parks and Wildlife Sanctuaries in India”.
WORLEY
PARSONS
LLC
PROJECTS
CONDUCTED EIA FOR OIL & GAS, OTHER INDUSTRIAL PROJECT
▪ Environmental Impact Assessment for Proposed Duqum Bunker
Terminal conducted Ecological assessment, Ecological Report writing
and Air, Noise monitoring for proposed project. Sponsored by
OOMCO Oman.
▪ Environmental Impact Assessment for Proposed Duqum liquid bulk
Terminal Conducted Ecological assessment, Ecological Report
writing and Air, Noise Monitoring for proposed project. Sponsored by
OOTCO, Oman.
▪ Operation and maintenance of Solar Power Project at Adam and
Manah, (Data Downloading & Preparing in Excel format as per the
client requirement) Sponsored by Oman Power & Water Procurement
Co. (SAOC) Oman
▪ Integrated Impact Assessment for Upper Shoiuba Oil & Gas Project.
Conducted Ecological assessment, Report writing and Air, Monitoring
for proposed project. Sponsored by PDO, Oman.
▪ Integrated Impact Assessment for Mabrook Deep Gas, Oil & Gas
Project. Conducted Ecological assessment, Report writing and Air,
Monitoring for proposed project. Sponsored by PDO, Oman.
▪ Ecological Assessment for Nahada to Raz markhaz Crude oil pipeline
(450 Km ) Sponsored by OGC, Oman
▪ Environmental Impact Assessment for DAP/ NPK fertilizer project.
Conducted Ecological assessment, Ecological Report writing and Air,
Monitoring for proposed project Sponsored by Nagarjuna Fertilizers
Ltd Salalah, Oman.
▪ Ecological Assessment and Ecological Report writing for Six
Fisheries Harbour at Musandam, Dibba, Mahout, Shuwyamiyah,
Sadah and Rakhute, Sponsored by Ministry of Agricultural and
Fisheries, Oman.
▪ Conducts IEE & EIA baseline study & prepare IEE & EIA reports
▪ Environmental site assessment, Ground Water Monitoring
(GME), EMS ISO14001: 2004.
▪ Loss Prevention Program Implementation, oil filling stations and
depot's HSE plans development, environmental impact assessments
(EIA), remedial investigation
SAUDI
ARCHIRODON
LTD
▪ Commissioning of 8 x 80 MW Combine Cycle Gas based power plant
in Shoaiba Saudi Arabia sponsored by M/S, Saudi Electricity
Company.
▪ Working on Commissioning of Marine Facility Project sponsored by
MARAFIQ Saudi Arabia.
▪ HSE, Environmental Aspects
▪ Development and implementation of Environmental Management
Systems (EMS) based on the requirements of ISO 14001, at Project
and Company level.
▪ On day to day basis, Sampling, analyze, monitor and report
environmental discharges from the dredging activities
▪ Interact with supervisors and managers for data reconciliation and
advice changes to fulfill the procedures and regulatory norms.
▪ To coordinate with environmental consultants for conducting EIA
study, Field data assessment, stack emissions and ambient air quality
monitoring, etc. This includes preparation of work scope, tender
evaluation and monitoring the work progress and evaluation of final
report.
▪ Understand the Royal Commission (KSA) and PME Presidency of
Meteorology and Environment and Governments Environmental
requirements and assist in complying with all requirements
▪ Hazardous Waste Management, Chemicals handling, Spill and
contingency
▪ Implementation of Environmental protection standards and regulation
(on emissions in soil and water, acoustic and waste management.
▪ Development and implementation of Environmental Plans and
Procedures for activities
▪ Participates in Groundwater monitoring well installations and
sampling events
▪ Prepare quarterly groundwater monitoring reports
▪ Develop, implement and update environment procedures to minimize
risks and meet environment statutory requirements.
▪ Evaluate and improve environmental awareness program and
conduct environment awareness training for company employees &
Contractors.
▪ Participation in environmental related incident investigation and make
recommendation to ensure that appropriate lesson are learned and
practices changed to prevent reoccurrence.
▪ Performs groundwater sampling, gauging and product bailing, and
surveying
KIRLODSKAR
- Company industry:
- Oil & Gas
- Job role:
-
Engineering