MAINTENANCE TECHNICIAN HVAC AND ELECTRICAL
MUSAED EL-SEIF & SONS COMPANY LTD
Total years of experience :14 years, 4 Months
❖ COMPANY: MUSAED EL-SEIF & SONS COMPANY LTD.
ADDRESS: PO.BOX 2774, RIYADH 11461 KINGDOM OF SAUDI ARABIA
INCLUSIVE DATES: JULY, 09 2012 TILL PRESENT
POSITION: MAINTENANCE TECHNICIAN HVAC AND ELECTRICAL
DUTIES AND REPONSIBILITIES: • TROUBLE SHOOTING ELECTRICAL WIRING AND CONNECTIONS
• INSTALLING NEW ELECTRICAL WIRING AND CONNECTIONS
• CHECKING PANEL BOARD ELECTRICAL LOAD
• RETIGHTENING ALL BREAKER SCREW AND CONNECTION
• REPLACING BUSTED BULB, FLUORESCENT, SOCKET, SWICTH AND OTHER ELECTRICAL
• MAINTAINING ALL PANEL BOARD IN MY AREA AND SAFETY
• CHECKING (AHU) AIR HANDLING UNITS
• CHECKING ROOM TEMPERATURED AND CLEANING DISPENSER
• REPLACING THE FILTER OF AIR HANDLING UNIT (AHU) AND CHILLER UNIT
• REPLACING THE BELT OF AHU UNIT AND (FCU) FILTER COIL UNIT
• TROUBLED SHOOTING THE AHU WIRING CONNECTIONS
• CHECKING CONDENSING UNIT OF THE CHILLER MACHINE
• MONITOR CHILLER MACHINE IN MY AREA
• REPAIRED AND TROUBLESHOOTING AIRCON UNIT AHU UNIT
• INSTALLING NEW AC UNIT REPLACING COMPRESSOR REPAIRING CONTROL
• CONDUCTING PPM FOR ALL THE UNIT CHECKING ALL AC FREON FAN MOTOR AND OTHER PARTS
• MAKING DAILY REPORT AND ACCOMPLISHMENT
❖ COMPANY: ORIENT SEMICONDUCTOR ELECTRONICS PHILIPPINES
ADDRESS: SCIENCE PARK 2 CALAMBA CITY, LAGUNA, PHILIPPINES
INCLUSIVE DATES: JAN 20, 2007 TO APRIL 25, 2012
POSITION: MAINTENANCE TECHNICIAN (RM FRONT OF LINE)
DUTIES AND REPONSIBILITIES: • MACHINES SET UP AND CONVERTION
• REPAIRING AND TROUBLED SHOOTING OF MACHINES
• SETUP NEWLY DEVICES AND ENGENEERING DEVICES
• CONDUCT MACHINES CALIBRATION AND ALIGNMENT
• MAINTAINING MACHINES IN RUNNING CONDITION
• TO ENSURE OF PRODUCT QUALITY AND PRODUCTION OUT PUT
• SET UP KNS MACHINE 8028, MAXUM, KNS 1488 TURBO, PLUS MACHINES AND ASM EAGLE MACHINE
• SET UP IN DIE COAT MACHINES ASSIST OPERATOR IN PRODUCTION
❖ COMPANY: I - MAN COMPANY / KING FAHAD MEDICAL CITY
ADDRESS: RAWDAHI KHURAIS ROAD RIYADH 11471, K.S.A
INCLUSIVE DATES: NOVEMBER 21, 2009 TO JANUARY 25, 2012
POSITION: MAINTENANCE TECHNICIAN (PANEL BOARD AND HVAC)
DUTIES AND REPONSIBILITIES: • TROUBLE SHOOTING ELECTRICAL WIRING AND CONNECTIONS
• INSTALLING NEW ELECTRICAL WIRING AND CONNECTIONS
• CHECKING PANEL BOARD ELECTRICAL LOAD
• RETIGHTENING ALL BREAKER SCREW AND CONNECTION
• REPLACING BUSTED BULB, FLUORESCENT, SOCKET, SWICTH AND OTHER ELECTRICAL
• MAINTAINING ALL PANEL BOARD IN MY AREA AND SAFETY
• CHECKING (AHU) AIR HANDLING UNITS
• CHECKING ROOM TEMPERATURED AND CLEANING DISPENSER
• REPLACING THE FILTER OF AIR HANDLING UNIT (AHU) AND CHILLER UNIT
• REPLACING THE BELT OF AHU UNIT AND (FCU) FILTER COIL UNIT
• TROUBLED SHOOTING THE AHU WIRING CONNECTIONS
• CHECKING CONDENSING UNIT OF THE CHILLER MACHINE
• MONITOR CHILLER MACHINE IN MY AREA
• REPAIRED AND TROUBLESHOOTING AIRCON UNIT AHU UNIT
• INSTALLING NEW AC UNIT REPLACING COMPRESSOR REPAIRING CONTROL
• CONDUCTING PPM FOR ALL THE UNIT CHECKING ALL AC FREON FAN MOTOR AND OTHER PARTS
❖ COMPANY: INFINITI SOLUTIONS PHILIPPINES
ADDRESS: SCIENCE PARK 1 CABUYAO, LAGUNA, PHILIPPINES
INCLUSIVE DATES: NOVEMBER 2O, 2005 TO JAN 7, 2007
POSITION: PROCESS TECHNICIAN (TDE DEPT.)
DUTIES AND REPONSIBILITIES:
• ANALYSING OF NEWLY DEVICES AND MATERIALS
• CONDUCT EVALUATION AND TEST RUNNING FOR NEW DEVICES AND PRODUCT
• SET UP AND CONVERTION MACHINES FOR NEW DEVICES QUALIFICATION TEST
• CONDUTING RELIABILITY TEST FOR NEW DEVICES
• GATHERING OF DATA FOR THE NEW DEVICES TEST MAKING REPORT
• ASSISTING IN PRODUCTION PROBLEM IN PRODUCT RELEVANT PROBLEM
• CONDUCT STUDIES IN THE NEW DEVICE
• KNOW STOCK DIE BONDING AND MULTI DIE BONDING
❖ COMPANY: AMKOR TECHNOLOGY PHILIPPINES
ADDRESS: CUPANG, MUNTINLUPA, CITY PHILIPPINES
INCLUSIVE DATES: MARCH 21, 2002 TO OCTOBER 25, 2005
POSITION: MAINTENANCE TECHNICIAN
DUTIES AND REPONSIBILITIES: • MACHINES SET UP AND CONVERTION
• PROGRAMMING SET UP NEWLY DEVICES
• REPAIRING AND TROUBLED SHOOTING OF MACHINES
• SETUP NEWLY DEVICES AND ENGENEERING DEVICES
• CONDUCT MACHINES CALIBRATION AND ALIGNMENT
• MAINTAINING MACHINES IN RUNNING CONDITION
• TO ENSURE OF PRODUCT QUALITY AND PRODUCTION OUT PUT
• SET UP KNS MACHINE 8028, MAXUM, KNS 1488 TURBO, PLUS MACHINES AND ASM 339, ASM EAGLE 6O MACHINE
• SET UP IN DIE COAT MACHINES ASSIST OPERATOR IN PRODUCTION
❖ SPECIAL SKILLS
REPEARING APPLIANCES, ELCTRONICS EQUEPMENT, READING DIAGRAM, KNOWLEGED IN ELECTRICAL AND AIRCON AND COMPUTER LITERATE.
PRIMARY: SCHOOL NAME / ADDRESS: LAGUNA STATE POLYTECHNIC COLLEGE, STA.CRUZ LAGUNA PHILIPPINES
CAMPUS STA.CRUZ, LAGUNA COURSE: (BSIT) BACHELOR SCIENCE INDUTRIAL TECHNOLOGY MAJOR: ELECTRONICS YEARS: JUNE 1999 TO MARCH 2003 SECONDARY:LAGUNA COLLEGE OF ART AND TRADES HIGH SCHOOLL FROM JUNE 1995 TO MARCH 1999
SCHOOL NAME / ADDRESS: LAGUNA COLLEGE OF ARTS AND STA.CRUZ, LAGUNA PHIIPPIPNES COURSE: HIGH SCHOOL YEARS: JUNE 1995 TO MARCH 1999