مجموع سنوات الخبرة :33 years, 10 أشهر

Electrical Engineer في metito
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مايو 2021

• Supervised and directed the execution of electrical and instrumentation works in a sewage treatment plant project.
• Prepared inspection requests for the completed work while adhering to safety regulations and industry standards.
• Reviewed electrical wiring, P&ID, Loop wiring diagram, Schematic Diagram, Engineering data sheet, material submittal, method statement & Technical specification for submission.
• Provide cable & instrument estimation and bill of quantity.
• Coordination of on-site activities with subcontractors and consultants to ensure smooth project execution and timely completion of work.
• Carried out shop drawing revision and as built drawing for consultants’ submission.

ELECTRICAL ENGINEER في Metito Overseas Qatar
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مايو 2021

• Supervised and directed the execution of electrical and instrumentation works in a sewage treatment plant project.
• Prepared inspection requests for the completed work while adhering to safety regulations and industry standards.
• Reviewed electrical wiring, P&ID, Loop wiring diagram, Schematic Diagram, Engineering data sheet, material submittal, method statement & Technical specification for submission.
• Provide cable & instrument estimation and bill of quantity.
• Coordination of on-site activities with subcontractors and consultants to ensure smooth project execution and timely completion of work.
• Carried out shop drawing revision and as built drawing for consultants submission.

Electrical Inspector في SENER
  • قطر - الدوحة
  • أغسطس 2017 إلى يونيو 2020

 Conduct daily site inspection thru ITR (Inspection and Testing Request)
 Review and validate the contractor’s procurement, construction, installation and commissioning plans, procedures and construction/installation methods.
 Review, monitor and report on the contractor’s activities in order to validate that the works are carried out in accordance with the contract.
 Review the contractor’s approach/methodology to install, operate, maintain and remove all temporary facilities and utility services.
 Carry out sufficient level of independent supervision of the construction, fit-out and installation activities to be able to verify that is carried out in accordance with the issued for construction (IFC) working/installation drawings, project technical specification, approved method statements, approved inspection and test plan and the local regulations.
 Advise of any short comings with the contractor’s site supervision and recommends corrective action to be taken.
 Review and validate hazard analysis and job safety management procedures.
 Participate in the review of the completed works, monitoring the close out of any non-conformances or outstanding items.
 Review and monitor the implementation of the quality, safety and environmental management plans in accordance with the contract requirement.
 Validate that the installation of materials which are subject to Employer’s approval are installed in accordance with the manufacturer’s recommendations and relevant fire testing reports and certification.
 Certify that the completed works have been carried out in accordance with the design drawings approved by the statutory authorities, the IFC drawings, the material specifications and good practice was followed in terms of workmanship.


 Certify the as built drawing and package quality documentation as being true and accurate record of what has been constructed.
 Witness and certify that testing and commissioning is adequate for the statutory authorities to carry out their site inspections prior to issue of the occupation permits.

Electrical Engineer في SENER
  • قطر - الدوحة
  • أغسطس 2017 إلى يونيو 2020

• Conduct & performed electrical inspections for the completed works to ensure compliance with approved drawing, design project specifications, standard codes, and regulations.
• Supervised and monitored the electrical works of contractors and provided guidance to guarantee seamless execution at site.
• Review and approve shop drawing for all electrical works, material submittal, method statement and other project documents to identify any discrepancies or potential issues during implementation.
• Perform testing and commissioning of electrical systems, including conducting insulation resistance tests, continuity tests, earthing test, lux level test and hi-pot.

Project Support في Acoulite Trading L.L.C
  • قطر - الدوحة
  • أغسطس 2015 إلى أغسطس 2017

 Overall technical support for lighting and controls projects in Qatar
 Responsible in coordinating with suppliers and contractors for smooth execution of projects
 Preparation and estimation of lighting and controls material bill of quantities
 Meeting clients, consultants and contractors to ensure project is satisfactory delivered.
 Provide technical guidance to the electrical contractors for the proper installation of lighting and controls products.
 In charge of Lighting controls/dimming system programming - Philips Dynalite & Lutron.
 Conducts site surveys, inspections and preparation of material for delivery.
 Ensures that the project is technically and contractually complaint.
 Ensures the quality and profitability of the project.
 Make commercial and technical decisions while at site.
 Report solution and potential technical issues of specific light fixtures, lamps, ballast, drivers & controls to the Management for future projects.
 Design support to the Country Manager including lighting design, Dialux calculations, schematics, specification sheets, and CAD works.

Duty Manager في Thyssenkrupp Airport Service System
  • قطر - الدوحة
  • مارس 2013 إلى يوليو 2015

• Manage and supervise the maintenance team on maintaining the Passenger Loading Bridge (PLB), Ground Power unit(GPU) and Pre-Conditioned Air unit (PC AIR) inside Hamad International Airport
• Acting as Maintenance Team Leader in general.
• Schedule the Preventive Maintenance on each unit including shutdown request daily.
• Prepare daily maintenance report to the client including corrective works & bridge breakdown/shutdown
• Arrange and ensure approved permit are available during the corrective maintenance
• Prepare all the materials needed for the corrective maintenance
• Prepare monthly & annual report of all the completion & pending works
• Attend weekly meeting with the client

DUTY MANAGER في THYSSENKRUPP AIRPORT SERVICE SYSTEM
  • قطر - الدوحة
  • مارس 2013 إلى يوليو 2015

• Implemented regular preventive maintenance on airport equipment, including the Passenger Loading Bridge (PLB), Ground Power Unit (GPU), and Pre-Conditioned Air Unit (PC AIR), to ensure good condition and proper operation.
• Ensure daily coordination with airport management regarding bridge breakdowns and shutdowns to plan preventive and corrective maintenance.
• Kept maintenance team ready for daily demands of shutdown, corrective repair and troubleshooting with effective knowledge, level of tools, equipment, and replacement parts.

MEP Team Leader في Kinnarps Project Solutions (KPS)
  • قطر - الدوحة
  • أكتوبر 2011 إلى مارس 2013

• In charge of designing Electrical & Fire Alarm services.
• Supervised the final MEP design package including coordination of each service as per final architectural layout and make sure to meet the deadline.
• Checked & reviewed the accuracy of design based on client’s specification, Landlord/Tenancy design criteria & standard codes.
• Conduct MEP survey as per existing services.
• Prepared base build drawing, shop drawing & as built drawing for the complete MEP works.
• On site coordination of MEP Services including Internal Coordination.
• Implement various deadlines on each MEP services.
• Attend internal technical meeting.
• Prepared Local Authority (Qatar Civil Defence) submission plan for approval.

MEP TEAM LEADER في KPS- KINNARPS PROJECT SOLUTION
  • قطر - الدوحة
  • أكتوبر 2011 إلى مارس 2013

• Planned and supervised a design team to create an MEP system design package based on Landlord/Tenancy design criteria, using CAD drawings and Dialux results.
• Coordinated surveys were conducted to lay out installations and establish reference points and elevations in order to prepare a base build drawing of MEP works and guide the design construction.
• Maintain coordination with the site team regarding the progress of the work and ensure that the design drawings correspond to the site works.

Design Electrical Engineer في Flamtechnic Co. W.L.L
  • قطر - الدوحة
  • مايو 2010 إلى أكتوبر 2011

• Designs Fire Alarm System
• Supervise installation/layout, testing and commissioning of Fire Alarm systems
• Liaise with Local Authority (Qatar Civil Defence) on submission of plans and materials for approval
• Conducts site inspection for Quality Assurance / Quality Control
• Prepare shop drawings, as built drawings & material submittals
• Attends client’s weekly technical meetings
• Estimates and prepares bill quantities of materials

PROJECTS UNDERTAKEN:
I. FALCON CLINIC in Souq Waqif, Doha, Qatar
II. ST 37-SHOPPING COMPLEX, CINEMAS & AMPHI THEATER in Industrial Area
III. SOUQ WAQIF RENOVATION PLAN in Souq Waqif, Doha, Qatar

ELECTRICAL ENGINEER في FLAMTECHNIC CO. WLL
  • قطر - الدوحة
  • مايو 2010 إلى أكتوبر 2011

• Designing of Fire alarm system including schematic and load calculation.
• Prepared a shop drawing and material submission for both consultant and local authority approval.
• Supervised the site team for fire alarm layout, device installation, and testing commissioning in collaboration with the consultant and clients.
• Estimation & preparation of material bill of quantities

ELECTRICAL INSPECTOR في WSP-ME
  • الإمارات العربية المتحدة - دبي
  • ديسمبر 2007 إلى مايو 2010

• Reviewed shop drawings, Builders works drawings, As-built drawings & Material submittals for complete MEP works.
• Conduct daily electrical inspections by contractors and subcontractors to ensure work quality, adherence to approved drawings and specifications, and compliance with local authorities.
• Inspected and monitored the testing and commissioning of installed systems.

Electrical Engineer في WSP MIDDLE EAST
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2007 إلى أبريل 2010

• Reviews shop drawings, Builders work drawings, As-built drawings and Material submittals to complete MEP projects
• Checks layout accuracy of approved design drawings and specifications
• Performs Quality Assurance procedures
• Able to identify code violations and appraise quality of construction
• Conducts inventory and inspects materials delivered on site to assure conformance with specific requirements
• Inspects and monitors Testing and Commissioning of installations
• Able to identify non-conformances and create report as per company standards
• Liaise with Local Authority (Dubai Municipality) for the approval of submission plans

PROJECT UNDERTAKEN:
I. MIRDIF SHOPPING CENTRE in Dubai, UAE (2007-2010)

Site Electrical Engineer في HYPERVOLT CONTRACTOR CORPORATION
  • الفلبين - Manila
  • سبتمبر 2004 إلى مايو 2007

• Supervise projects from start to completion
• Conducts routine inspection on site to ensure strict compliance with project specifications
• Prepare shop drawings, as-built drawings and material submittal of Electrical works

PROJECT UNDERTAKEN:
I. SM SUPERCENTER SHOPPING MALL
II. ACE HARDWARE WAREHOUSE
III. OUR HOMES WAREHOUSE in Manila, Philippines

Design Electrical Engineer في POWER TRANSMISSION DISTRIBUTION SYSTEM DEVELOPMENT (PTDS) COMPANY
  • الفلبين - Manila
  • أكتوبر 2002 إلى سبتمبر 2004

• Supervise Technical Engineering Team in conducting field inspection and data gathering for the preparation of power distribution analysis that consist of Load Flow analysis, Load allocation, Forecasting, System Reliability and Power quality covered by the network
• Analyze Power Distribution System Loss and provides Loss Reduction Program on Rural Electric Cooperative projects taking into consideration the flexibility, durability and financial aspects

PROJECTS UNDERTAKEN:
I. ISABELA ELECTRIC COOPERATIVE (ISELCO 1 ) Luzon Area, Philippines
II. BILIRAN ELECTRIC COOPERATIVE (BILECO) Eastern Visayas Area, Phils.
III. KALINGA-APAYAO ELECTRIC COOPERATIVE (KAELCO)
Luzon Area, Philippines
IV. QUIRINO ELECTRIC COOPERATIVE (QURELCO) Luzon Area, Philippines

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Adamson University
  • مايو 2024

Registered Electrical Engineer License - Passed - Aug.,2002 Registered Master Electrician License - Passed - May 2003

بكالوريوس, BACHELOR OF SCIENCE
  • في ADAMSON UNIVERSTY
  • أغسطس 2002

Specialties & Skills

Fire Alarm
Site Inspection
Engineering Drawings
Quality Assurance
Bill of Materials
DRAWING
SHOP DRAWING
COMMISSIONING
ELECTRICAL WIRING
INSTALLATION
MECHANICAL ELECTRICAL AND PLUMBING (MEP) SYSTEMS
TROUBLESHOOTING (PROBLEM SOLVING)
AS-BUILT DRAWINGS
COLLABORATION
Ms Word
Ms Excel
Autocad

اللغات

الفيلبينية
متمرّس
الانجليزية
متوسط

العضويات

IIEE - Institute of Integrated Electrical Engineers
  • Member
  • May 2002
CFC - Couples for Christ
  • Member
  • September 2010

التدريب و الشهادات

AutoCADD2008 (تدريب)
معهد التدريب:
Microcadd Technologies
تاريخ الدورة:
May 2007