Architecture?HVAC supervisor/inspector
Biendong POC
Total years of experience :23 years, 4 Months
HVAC
- Resolving all problems arises due to design changes and coordinated with field design engineers as and when necessary.
-carried out material inspection
- to carried out leak test for refrigeration pipe and smoke test for
Ducting to ensure the quality of the jointing.
- carried out line check for ducting install as per drawing and
specification
- Daily monitoring to ensure sub contractors perform all works in according to specification and requirements.
- Monitor main contractor daily progress and planning schedule.
- monitor and advise any unsafe activity or condition.
- report daily and weekly progress to construction Manager.
- review reporting and approved final documentation
- report daily activity and progress to Construction Manager
.
ARCHITECTURE
- Review and comment ITP before approval.
- Review drawing and comment if there not as per requirement not
as per specification.
- Advised contractor any engineering revise.
- Advised any procurement order as per requirement or
Specification
- review and advised superior for and site technical query.
-Monitor daily activities and work progress as per work planning.
- monitor quality of work and advise any site change
-Daily Coordination Meeting with main contractor for smooth executing of works progress, quality and safety.
-carried out material inspection.
- carried out architecture inspection.
- monitor and advise any unsafe activity or condition
- to check all plumbing system and insulation in Living Quarter
- to check and verified also make a comment or approve a
safety Equipment Safety or safety sign has been install.
- report to construction manager daily and weekly progress.
- advice contractor to speed up the work to catch the planning any behind schedule job.
- report daily activity and progress to Construction Manager
- review reporting and final documentation
Structure
- Site supervision and documentation works activities
- liaising with procument department any material issue.
- Supervise with Material Controller for dispatching construction
material to site area.
- Resolving all problems arises due to design changes and
coordinate with field design engineers as and when necessary.
-carried out material, fit-up and visual inspection.
-liaising with client representative for any change order or
Variation order
-monitor NDT
- Daily monitoring that contractors perform all works in according to specification and requirements.
- supervised preparation of installation skid way for load out.
-in charge in skidding of topside and jacket for load out activities
- monitor and advise any unsafe activity or condition.
- to verified and approved permit to work.
- involved in Emergency Rescue Team.
- request all facilities required during work activity.
- report daily activity and progress to Construction Manager
- to ensure the safety condition during load out.
-Documentation.
Architecture
-Monitor daily activities and work progress as per work planning.
-Daily Coordination Meeting with Client for smooth executing of works progress, quality and safety.
-carried out material, fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-Estimate and request to purchase any shortage of material.
- monitor and advise any unsafe activity or condition
- to verified and approved permit to work.
- report daily activity and progress to Construction Manager
-Documentation.
HVAC
-Monitor daily activities and work progress to achieve MCD
-liaising with client rep. for any change order or variation
Order
- liaising with engineering any site modification.
-monitor leak test/ smoke test
-Supervised and carried out inspection for HVAC work.
- monitor and advise any unsafe activity or condition
- to verified and approved permit to work.
- report daily activity and progress to Construction Manager
-Documentation
-Witness main contractor inspection on piping activities.
( fit-up, visual, line check, hydrotest)
-Review of test package prior hydrotest.
-Drafting weld mapping fill in necessary requirement for each ISO drawing prior to specification.
-Drafting and controlling of as built isometric for test
Package as per site condition.
-Supervised and compilation of piping test package according
To test limit.
-Monitor work progress and reporting to Project Manager.
- make a redline mark up any site change and send to
engineering for as built.
- to raise NCR any activity not as per specification.
-Documentation control
Project Involved
Position :Piping Inspector
Project Involved :MODEC LLC FPSO
Client :Modec International
Position :Structure/Architecture Inspector
Project Involved :Bunga Raya ‘E’ Topside/Living Quarter
Client :Talisman Malaysia Limited
Position :Structure Inspector/PMT
Project Involved :MODEC BAOBAB Field Development Project.
Client :Modec International
Position :Structure Inspector
Project Involved :B11 DRA Topside.
Client :Sarawak Shell Berhad
Position :Structure Inspector
Project Involved :Angsi ‘C’ and ‘E’ Jacket and topside
Client :Petronas Carigali Sdn Bhd
Position :Piping Inspector
Project Involved :Angsi ‘B’ topside
Client :Petronas Carigali Sdn Bhd
Position :Structure Inspector/ PMT
Project Involved :Angsi ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd
Position :Structure PMT/QC
Project Involved :RDP-A and RCPP Jacket
Client :Petronas Carigali Sdn Bhd
Project Management Team
-Monitor welding consumable issued and recorded.
-Recorded sub contractor daily man power and report
To Project Manager.
-Request to superior any facilities required at site.
-Liaising with procurement department any material issued.
-Site monitoring to ensure all work activity according to
specification and requirements and safety rules.
-Report to safety department any unsafe act.
-liaising with engineering department any engineering issued.
-Assist sub contractor to achieved work progress as per plan.
-attended tool box meeting to ensure activity as per plan and
to ensure workers aware about safety.
-Monitor all activity done by contractor follow specification and
requirement.
-liaising with QC inspector for inspection.
-liaising with client any quality issued.
-To ensure all inspection required have been carried out.
-to ensure all NCR has been closed before MCD.
Inspector
-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out material verification, fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- carried out line check for piping and ensure as per drawing.
- raised red line mark up to engineering any site change.
- complied test pack for piping and ensure all document completed
Before submit to client for approval before hydrotest.
-Monitor and verified hydrotest and flushing activities and
documented.
- to raise NCR any activity not as per specification.
-Final documentation.
Project Involved
Position :Piping Inspector
Project Involved :Tapis ‘E’ topside
Client :Esso Production Malaysia Inc.
Position :Structure Inspector
Project Involved :Sotong ‘A’ Jacket and Topside
Client :Petronas Carigali Sdn Bhd
Position :Structure/Piping Inspector
Project Involved :Eastman Chemical Copolymer Plant
Client :Foster Wheeler
Position :Structure Inspector
Project Involved :Fabrication new barge
Client :President Marine
Position :Structure Inspector
Project Involved :Semco Gaint III ( fabrication jacket fendering system)
Client :SAIPEM
Position :Structure/Architecture inspector/PMT
Project Involved :Lawit ‘A’ Topside
Client :Esso Production Malaysia Inc.
Position :Structure Inspector
Project Involved :Calm buoy
Client :Petronas Pernapisan Sdn Bhd
Position : Piping/Architecture Inspector/PMT
Project Involved :Guntong ‘D’- 168 Man Living Quarter
Client :Esso Production Malaysia Inc
Position :Structure/Architecture Inspector/PMT
Project Involved :D35-QA Living Quarter and Module Support Frame
D35 Telecom tower
D35-ra Riser Platform and Bridge
Client :Sarawak Shell Berhad
Project Management Team
-Monitor welding consumable issued and recorded.
-Recorded sub contractor daily man power and report
To Project Manager.
-Request to superior any facilities required at site.
-Liaising with procurement department any material issued.
-Site monitoring to ensure all work activity according to
specification and requirements and safety rules.
-Report to safety department any unsafe act.
-liaising with engineering department any engineering issued.
-Assist sub contractor to achieved work progress as per plan.
-attended tool box meeting to ensure activity as per plan and
to ensure workers aware about safety.
-Monitor all activity done by contractor follow specification and
requirement.
-liaising with QC inspector for inspection.
-liaising with client any quality issued.
-To ensure all inspection required have been carried out.
-to ensure all NCR has been closed before MCD.
Inspector
-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out material verification, fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- carried out line check for piping and ensure as per drawing.
- raised red line mark up to engineering any site change.
- complied test pack for piping and ensure all document completed
Before submit to client for approval before hydrotest.
-Monitor and verified hydrotest and flushing activities and
documented.
- to raise NCR any activity not as per specification.
- verified blasting painting sub contractor work
-Final documentation
Project Involved
Position :Architecture QC/PMT
Project Involved :Bardegg Topside And Living Quarters
Client :Petronas Carigali Sdn Bhd.
Position :Structure Inspector
Project Involved :BDO 6 Megaskid Topside
Client :Petronas Carigali Sdn Bhd
Position :Structure Inspector
Project Involved :Baronia I and J Jacket
Client :Petronas Carigali Sdn Bhd
Position :Structure Inspector
Project Involved :Dulang ‘D’ Topside
Client :Petronas Carigali Sdn Bhd
Project Management Team
-Recorded sub contractor daily man power and report
To Project Manager.
-Request to superior any facilities required at site.
-Liaising with procurement department any material issued.
-Site monitoring to ensure all work activity according to
specification and requirements and safety rules.
-Report to safety department any unsafe act.
-liaising with engineering department any engineering issued.
-Assist sub contractor to achieved work progress as per plan.
-attended tool box meeting to ensure activity as per plan and
to ensure workers aware about safety.
-Monitor all activity done by contractor follow specification and
requirement.
-liaising with contractor QC inspector for inspection.
-liaising with client any quality issued.
-To ensure all inspection required have been carried out.
-to ensure all NCR has been closed before MCD.
-Ensured all inspection documented.
Inspector
-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out incoming material inspection, material verification,
fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- to raise NCR any activity not as per specification.
Project Involved
Position :Structure Inspector
Project Involved :Dulang ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd
Position :Structure/Piping/Vessel Inspector
Project Involved :Palas ‘A’ Gas Injection Module
Client :Petronas Carigali Sdn Bhd
Position : Structure Inspector
Project Involved :Seligi ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
Position : Structure Inspector
Project Involved :Guntung ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
Duties and responsibilities
-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test and welding procedure qualification test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out material verification, fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- carried out line check for piping and ensure as per drawing.
- raised red line mark up to engineering any site change.
- complied test pack for piping and ensure all document completed
Before submit to client for approval before hydrotest.
-Monitor and verified hydrotest and flushing activities and
documented.
- to raise NCR any activity not as per specification.
-Monitor and carried out inspection Galvanizing activity.
-Final documentation