johari isham ismail, Architecture?HVAC supervisor/inspector

johari isham ismail

Architecture?HVAC supervisor/inspector

Biendong POC

Location
Malaysia
Education
Diploma, welding
Experience
23 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 4 Months

Architecture?HVAC supervisor/inspector at Biendong POC
  • Vietnam
  • October 2011 to October 2012

HVAC
- Resolving all problems arises due to design changes and coordinated with field design engineers as and when necessary.
-carried out material inspection
- to carried out leak test for refrigeration pipe and smoke test for
Ducting to ensure the quality of the jointing.
- carried out line check for ducting install as per drawing and
specification
- Daily monitoring to ensure sub contractors perform all works in according to specification and requirements.
- Monitor main contractor daily progress and planning schedule.
- monitor and advise any unsafe activity or condition.
- report daily and weekly progress to construction Manager.
- review reporting and approved final documentation
- report daily activity and progress to Construction Manager

.

ARCHITECTURE
- Review and comment ITP before approval.
- Review drawing and comment if there not as per requirement not
as per specification.
- Advised contractor any engineering revise.
- Advised any procurement order as per requirement or
Specification
- review and advised superior for and site technical query.
-Monitor daily activities and work progress as per work planning.
- monitor quality of work and advise any site change
-Daily Coordination Meeting with main contractor for smooth executing of works progress, quality and safety.
-carried out material inspection.
- carried out architecture inspection.
- monitor and advise any unsafe activity or condition
- to check all plumbing system and insulation in Living Quarter
- to check and verified also make a comment or approve a
safety Equipment Safety or safety sign has been install.
- report to construction manager daily and weekly progress.
- advice contractor to speed up the work to catch the planning any behind schedule job.
- report daily activity and progress to Construction Manager
- review reporting and final documentation

structure/architecture/HVAC supervisor at Malaysia Marine Heavy Engineering
  • Turkmenistan
  • March 2009 to August 2011

Structure
- Site supervision and documentation works activities
- liaising with procument department any material issue.
- Supervise with Material Controller for dispatching construction
material to site area.
- Resolving all problems arises due to design changes and
coordinate with field design engineers as and when necessary.
-carried out material, fit-up and visual inspection.
-liaising with client representative for any change order or
Variation order
-monitor NDT
- Daily monitoring that contractors perform all works in according to specification and requirements.
- supervised preparation of installation skid way for load out.
-in charge in skidding of topside and jacket for load out activities
- monitor and advise any unsafe activity or condition.
- to verified and approved permit to work.
- involved in Emergency Rescue Team.
- request all facilities required during work activity.
- report daily activity and progress to Construction Manager
- to ensure the safety condition during load out.
-Documentation.



Architecture
-Monitor daily activities and work progress as per work planning.
-Daily Coordination Meeting with Client for smooth executing of works progress, quality and safety.
-carried out material, fit-up and visual inspection.
-liaising with client rep for any change order or variation
Order
-Estimate and request to purchase any shortage of material.
- monitor and advise any unsafe activity or condition
- to verified and approved permit to work.
- report daily activity and progress to Construction Manager
-Documentation.

HVAC
-Monitor daily activities and work progress to achieve MCD
-liaising with client rep. for any change order or variation
Order
- liaising with engineering any site modification.
-monitor leak test/ smoke test
-Supervised and carried out inspection for HVAC work.
- monitor and advise any unsafe activity or condition
- to verified and approved permit to work.
- report daily activity and progress to Construction Manager
-Documentation

Piping Inspector at Modec International
  • Singapore
  • October 2006 to November 2006

-Witness main contractor inspection on piping activities.
( fit-up, visual, line check, hydrotest)
-Review of test package prior hydrotest.
-Drafting weld mapping fill in necessary requirement for each ISO drawing prior to specification.
-Drafting and controlling of as built isometric for test
Package as per site condition.
-Supervised and compilation of piping test package according
To test limit.
-Monitor work progress and reporting to Project Manager.
- make a redline mark up any site change and send to
engineering for as built.
- to raise NCR any activity not as per specification.
-Documentation control

Piping/Structure/Architecture Inspector/PMT at Sime Darby Engineering
  • Malaysia
  • August 1998 to September 2006

Project Involved
Position :Piping Inspector
Project Involved :MODEC LLC FPSO
Client :Modec International


Position :Structure/Architecture Inspector
Project Involved :Bunga Raya ‘E’ Topside/Living Quarter
Client :Talisman Malaysia Limited


Position :Structure Inspector/PMT
Project Involved :MODEC BAOBAB Field Development Project.
Client :Modec International


Position :Structure Inspector
Project Involved :B11 DRA Topside.
Client :Sarawak Shell Berhad


Position :Structure Inspector
Project Involved :Angsi ‘C’ and ‘E’ Jacket and topside
Client :Petronas Carigali Sdn Bhd


Position :Piping Inspector
Project Involved :Angsi ‘B’ topside
Client :Petronas Carigali Sdn Bhd


Position :Structure Inspector/ PMT
Project Involved :Angsi ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd


Position :Structure PMT/QC
Project Involved :RDP-A and RCPP Jacket
Client :Petronas Carigali Sdn Bhd


Project Management Team

-Monitor welding consumable issued and recorded.
-Recorded sub contractor daily man power and report
To Project Manager.
-Request to superior any facilities required at site.
-Liaising with procurement department any material issued.
-Site monitoring to ensure all work activity according to
specification and requirements and safety rules.
-Report to safety department any unsafe act.
-liaising with engineering department any engineering issued.
-Assist sub contractor to achieved work progress as per plan.
-attended tool box meeting to ensure activity as per plan and
to ensure workers aware about safety.
-Monitor all activity done by contractor follow specification and
requirement.
-liaising with QC inspector for inspection.
-liaising with client any quality issued.
-To ensure all inspection required have been carried out.
-to ensure all NCR has been closed before MCD.


Inspector

-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out material verification, fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- carried out line check for piping and ensure as per drawing.
- raised red line mark up to engineering any site change.
- complied test pack for piping and ensure all document completed
Before submit to client for approval before hydrotest.
-Monitor and verified hydrotest and flushing activities and
documented.
- to raise NCR any activity not as per specification.
-Final documentation.

Structure/piping/Architecture inspector/PMT at Promet Fabricator
  • Malaysia
  • July 1993 to May 1998

Project Involved

Position :Piping Inspector
Project Involved :Tapis ‘E’ topside
Client :Esso Production Malaysia Inc.

Position :Structure Inspector
Project Involved :Sotong ‘A’ Jacket and Topside
Client :Petronas Carigali Sdn Bhd

Position :Structure/Piping Inspector
Project Involved :Eastman Chemical Copolymer Plant
Client :Foster Wheeler

Position :Structure Inspector
Project Involved :Fabrication new barge
Client :President Marine

Position :Structure Inspector
Project Involved :Semco Gaint III ( fabrication jacket fendering system)
Client :SAIPEM

Position :Structure/Architecture inspector/PMT
Project Involved :Lawit ‘A’ Topside
Client :Esso Production Malaysia Inc.

Position :Structure Inspector
Project Involved :Calm buoy
Client :Petronas Pernapisan Sdn Bhd


Position : Piping/Architecture Inspector/PMT
Project Involved :Guntong ‘D’- 168 Man Living Quarter
Client :Esso Production Malaysia Inc

Position :Structure/Architecture Inspector/PMT
Project Involved :D35-QA Living Quarter and Module Support Frame
D35 Telecom tower
D35-ra Riser Platform and Bridge
Client :Sarawak Shell Berhad


Project Management Team

-Monitor welding consumable issued and recorded.
-Recorded sub contractor daily man power and report
To Project Manager.
-Request to superior any facilities required at site.
-Liaising with procurement department any material issued.
-Site monitoring to ensure all work activity according to
specification and requirements and safety rules.
-Report to safety department any unsafe act.
-liaising with engineering department any engineering issued.
-Assist sub contractor to achieved work progress as per plan.
-attended tool box meeting to ensure activity as per plan and
to ensure workers aware about safety.
-Monitor all activity done by contractor follow specification and
requirement.
-liaising with QC inspector for inspection.
-liaising with client any quality issued.
-To ensure all inspection required have been carried out.
-to ensure all NCR has been closed before MCD.


Inspector

-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out material verification, fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- carried out line check for piping and ensure as per drawing.
- raised red line mark up to engineering any site change.
- complied test pack for piping and ensure all document completed
Before submit to client for approval before hydrotest.
-Monitor and verified hydrotest and flushing activities and
documented.
- to raise NCR any activity not as per specification.
- verified blasting painting sub contractor work
-Final documentation

Structure/architecture inspector/PMT at Malaysia Shipyard and Engineering
  • Malaysia
  • December 1989 to May 1993

Project Involved

Position :Architecture QC/PMT
Project Involved :Bardegg Topside And Living Quarters
Client :Petronas Carigali Sdn Bhd.

Position :Structure Inspector
Project Involved :BDO 6 Megaskid Topside
Client :Petronas Carigali Sdn Bhd

Position :Structure Inspector
Project Involved :Baronia I and J Jacket
Client :Petronas Carigali Sdn Bhd

Position :Structure Inspector
Project Involved :Dulang ‘D’ Topside
Client :Petronas Carigali Sdn Bhd


Project Management Team

-Recorded sub contractor daily man power and report
To Project Manager.
-Request to superior any facilities required at site.
-Liaising with procurement department any material issued.
-Site monitoring to ensure all work activity according to
specification and requirements and safety rules.
-Report to safety department any unsafe act.
-liaising with engineering department any engineering issued.
-Assist sub contractor to achieved work progress as per plan.
-attended tool box meeting to ensure activity as per plan and
to ensure workers aware about safety.
-Monitor all activity done by contractor follow specification and
requirement.
-liaising with contractor QC inspector for inspection.
-liaising with client any quality issued.
-To ensure all inspection required have been carried out.
-to ensure all NCR has been closed before MCD.
-Ensured all inspection documented.


Inspector

-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out incoming material inspection, material verification,
fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- to raise NCR any activity not as per specification.

Structure/piping/vessel inspector at Sime Sembawang Engineering
  • Malaysia
  • December 1986 to November 1989

Project Involved

Position :Structure Inspector
Project Involved :Dulang ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd

Position :Structure/Piping/Vessel Inspector
Project Involved :Palas ‘A’ Gas Injection Module
Client :Petronas Carigali Sdn Bhd

Position : Structure Inspector
Project Involved :Seligi ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc

Position : Structure Inspector
Project Involved :Guntung ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc


Duties and responsibilities

-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and
recorded.
-To ensure all equipment used at site calibrated.
-in charge and carried out inspection for welder qualification
Test and welding procedure qualification test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out material verification, fit-up and visual inspection.
-Attended progress meeting with client and raised any quality
Issued.
-Monitor welder performance
- liaise and request to NDT department any joint required NDT.
-liaising with client rep for any change order or variation
Order.
- carried out line check for piping and ensure as per drawing.
- raised red line mark up to engineering any site change.
- complied test pack for piping and ensure all document completed
Before submit to client for approval before hydrotest.
-Monitor and verified hydrotest and flushing activities and
documented.
- to raise NCR any activity not as per specification.
-Monitor and carried out inspection Galvanizing activity.
-Final documentation

Education

Diploma, welding
  • at malaysia skill andfevelopment
  • May 2019

Specialties & Skills

Architecture
Structured
piping supervisor/inspector
HVAC supervisor/inspector
structure supervisor/inspector
architecture supervisor/inspector

Languages

English
Intermediate
Malay
Expert

Training and Certifications

MPI/DPI (Training)
Training Institute:
Sime darby
Date Attended:
March 1987
1992 Leadership & human relation skills (Training)
Training Institute:
Malaysian Employers Federation
Date Attended:
July 1992
welding Inspection course (Training)
Training Institute:
sime darby engineering
Date Attended:
March 1988
blasting and painting course (Training)
Training Institute:
promet fabricator
Date Attended:
April 1993
Architecture Engineering (Training)
Training Institute:
Federal Institute of technology
Date Attended:
January 1985
Corrosion protection (Training)
Training Institute:
berger paint
Date Attended:
July 1987