Jose Rey Pinez, Electrical Engineer

Jose Rey Pinez

Electrical Engineer

ITP

Location
United Arab Emirates
Education
Bachelor's degree, Electrical Engineering
Experience
23 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 3 Months

Electrical Engineer at ITP
  • United Arab Emirates
  • My current job since June 2016

Review and approval of Material Submittals.
•Review and approval of Shop Drawings
•Inspection and approval of Works Inspection request raised by Electrical Contractor.
•Inspection and approval of Materials Inspection request raised by Electrical Contractor
•Reply of Electrical Request for Information.
•Carry out all planned site inspections as per the intervention points marked in the relevant

Inspector at Mario Associates
  • United Arab Emirates
  • My current job since
Electrical Inspection Engineer at ITP
  • United Arab Emirates
  • November 2013 to February 2013

Witness Pre-commissioning activities of LV Transformers, LV Panels and ELV Systems.
•Make sure that any activity offered for inspection has an approved shop drawing, Method Statement (MS), Quality Control Procedure (QCP) and Inspection and Test Plan (

Engineer at P.O. Box
  • United Arab Emirates
  • November 2013 to March 2012
Project / Sr. Estimation
  • February 2010 to September 2010
Project Engineer
  • February 2010 to September 2010

Costing of low voltage power distribution boards and controls such as Panel boards, Main Distribution Boards, Sub-Main Distribution Boards, Final Distribution Boards, Capacitor Banks, Motor Control Center and Control Panel as per customers’ Single Line diagrams, Bill of Quantities, Load schedules and specifications.
•Ensure that quotations will be finished ahead the submission date to have enough time for double checking the Bill of Materials and the Pricing.
•Processing of technical drawings for the submittal to the customer for approval.
•Processing of the approved panels for production.
•Coordinate with the procurement department on the availability of all the required materials of the panels for production.
•Update with the design and production with regards to the latest revised SLD/Load schedules.
•Updates the customer on the status of the panels, coordinate with the customer any changes from the approved that will be incorporated in the required panels.
•Coordinate with the customer on the schedule of factory testing and delivery of the panels.
•Attend coordination meeting together with the contractor and consultant on the technical clarifications of the panels.

Electrical Engineer at Mouchel Middle Eas
  • United Arab Emirates
  • August 2008 to December 2009
Electrical Engineer at Mouchel
  • United Arab Emirates
  • August 2008 to December 2009

Computation of electrical loads using the Built-up Area/ Gross Floor Area method for design purposes \[Arabian Canal, The World & Malta Projects\].
•Calculation of electrical loads using the basic computations for design purposes \[DMC Project\].
•Sizing the Cables for Main and Feeder Loads and calculation of Voltage drop.
•Sizing of Circuit Breakers, Fuses, Feeder Pillars, Sub-Main & Main Distribution Boards.
•Calculation of Electrical Loads for the Transformer / Sub-Station Loadings including 132/11kV Sub-Stations.
•Estimates the Bill of Quantities for the Electrical Works.
•Ensure that the Drafting on the Schedule of Loads and Single line diagrams will be completed before the scheduled date of tender to have enough time for checking.
•Checking of Single Line diagrams if as per the schedule of loads with regards to the Size of Transformer, Ratings and Quantity of Main & Feeder Circuit breakers and size & quantity of cables.
•Preparations of Electrical Drawings and Supporting documents for the application of Sub-station size and Building NOC to DEWA.
•Preparations of Electrical Drawings and Supporting documents for the application of LV & HV Design NOC to DEWA.

Site Inspector at Mouchel
  • United Arab Emirates
  • June 2007 to August 2008

Checking and Approval of Electrical works at site if as per the submitted Request for Inspection \[RFI\] by the Contractor.
•Ensuring that Project Specifications, Shop Drawings and Approve Materials were followed in site.
•Filling of all the RFI’s and Drawing Transmittal for reference.
•Approval of Materials and Equipments submittal for Electrical works.
•To manage the various contractors in executing the job as per the work priorities and
schedules and coordinate with them for any problems encountered during the
construction period.
•Inspection of all Infrastructures work relating to Stormwater drainage network, Sewerage Network, Potable water network, Fire Fighting network, Irrigation network, Landscaping network and Electrical network if approved shop drawings and materials is followed.
•Aware the Contractor from time to time regarding the completion date of the project and pushing them to complete the job on time.
•Ensure that work is carried out in accordance with the specifications, shop drawings and approved materials.
•Oversees the work quality performance of various contractors and periodically remind them to make proper documentation adherence to the Inspection and Test Plan \[ITP\].
•Oversees the proper storage and safekeeping of materials to prevent damage from direct
sunlight and any other critical conditions.
•Monitor Daily progress report at site and submit weekly and monthly reports.
•Creates punch list for outstanding works and submit report to the Construction manager.

Inspector at Mouchel Middle Eas
  • United Arab Emirates
  • June 2007 to August 2008
Engineer at GEDAC-ELECTRIC [Formerly GE-JEDAC
  • Saudi Arabia
  • June 2002 to June 2007
Engineer at GEDAC-ELECTRIC (formerly GE-JEDAC)
  • Saudi Arabia
  • June 2002 to June 2007

Costing of low voltage power distribution boards, controls and Medium Voltage Equipment such as Panel boards, Switchboard, Motor Control Center, Control Panel, Bus Ducts, Sub-Stations, Transformers (Low & Medium Voltage) as per customers’ Single Line diagrams, Bill of Quantities and specifications & other related jobs using MIS JEDAC Software windows base program & Microsoft Word and Excel.
•Coordinate with the Sales Engineer and the Customer if some missing details from the documents submitted by the customer to complete their required panels & equipments.
•Ensure that quotations will be finished ahead the submission date to have enough time for double checking the Bill of Materials and the Pricing.
•Interpretation of customers documents to provide their required Panels and Equipments.
All the panels were suitable for Res’l., Ind’l. Comm’l., Power Plants and Oil & Gas used.

Design Engineer at Jehan Contracting Company
  • Saudi Arabia
  • December 1998 to June 2002

To be directly in-charge on the design and estimation of the bill of materials/quantities for Residential/Commercial/Industrial and Hospital projects.
•To be directly in-charge in the supervision of Electrical works including manpower distribution, checking on craftsmanship and following time schedule.
•Estimate the Bill of Materials for electrical works.
•Computations on the total cost of electrical works.
•Materials take-off.
•Drafting of revised and new electrical plans.
•Drafting of as-built plans.
•Submit accomplishment report to the Project Manager.


Name of Company : DF Salvador Builders - IMI LTI Project

Safety Engineer
  • Philippines
  • September 1997 to December 1998
Safety Engineer
  • Philippines
  • September 1997 to October 1998

To be directly in-charge on the implementation of the safety programs of IMI-LTI to avoid damaged to properties, injuries or death.
•To be directly in-charge on the cleanliness of the site, proper storage/arrangements of materials &equipments in order to have a clean and orderly surroundings.
•To be directly in charge on the supervision of all workers including sub-contractors to practice safety engineering.
•Conduct safety orientations/guidelines to new workers before they can start their work.
•Fabrication & installation of safety warning devices.
•Hourly routine to check if workers are following safety precautions or wearing safety paraphernalia while working to avoid injuries or death.
•Treatment of first aid medicine to minor injuries.

Project Engineer at Tagumpay Realty Corporation
  • United Arab Emirates
  • June 1995 to September 1997

Renovation of split level residential building.
•Construction of 5 storey school building, including design.
•Construction of four (4) units Duplex two storey residential building.
Bureau of Customs Projects:
•Installation and wiring of 1000, 800 & 500KVA new generating sets, including A.T.S.
•Construction of powerhouse for the 1000, 800 and 500KVA new generating sets.

Duties and Responsibilities:
•To make the lighting & power design and layout.
•To make all the computations of the electrical works.
•To check the Electrical drawings before submission.
•To estimate the bill of materials.
•Computation on the total cost of electrical works.
•To supervise the construction activities of electrical works as to the approved plans and specifications.
•To be directly responsible for the successful completion of the project in terms of budgeted cost, schedules & workmanship.
•To prepare weekly & monthly accomplishment reports for submission to the project manager.
•To be in-charge of the safety program including safekeeping & cleanliness of equipment, devices and the construction site in general.

Project Engineer at Tagumpay Realty Corporation
  • Philippines
  • June 1995 to September 1997
Engineer at Contracting Company
  • Saudi Arabia
  • January 1998 to
Engineer at Gulf Dynamic Switchgear
  • United Arab Emirates
  • to
Electrical Engineer
  • to

Establish and maintain effective working relationships with Architects, Engineers, Contractors, and representatives of other agencies.
•Understand, interpret and enforce compliance with approved plans, specifications, schedules and contract provisions.
•Recognize problems the scope of works, plans and specifications, schedules and determine necessary actions.
•Manpower distribution at site, Raise Request for Inspection for the completed works, Supervision of Electrical Works as per approved plans and Specifications, Estimates on the Bill of Quantities and prepares material purchase requisition order and can interpret Electrical Plans / Drawings for the execution of the job.
•Preparation of Electrical drawings and supporting documents for Tender and all Electrical NOC applications to Power Utilities Company.

Education

Bachelor's degree, Electrical Engineering
  • at Cebu Institute of TechnologyPerpetual Succour Academy
  • March 1982

courses: Registered Electrical Engineer Professional Regulation Commission No. 19320

High school or equivalent, Electrical Engineering
  • at ELEMENTARYMalabuyoc Central School
  • March 1978

School :

Specialties & Skills

Costing
Microsoft Word
Materials
ENGINEERING
GRAPHIC DESIGN
MATERIALS MANAGEMENT
MICROSOFT WORKS
PROGRESS
DRAFTING
PRICING
SUPERVISORY SKILLS
DISEñO DE LA DISPOSICIóN
DOCUMENTATION