Work Experience

Total years of experience :22 years, 9 Months

quantity surveyor at NPCC
  • United Arab Emirates - Abu Dhabi
  • April 1991 to September 2013

May 91 - May 95: ZADCO Arzanah Pipelines Project
: ADGAS Sulphur Handling Project
: ADGAS 3rd LNG Train Project
: ADMA-OPCO 36" Main Oil Line Project

Onshore Projects: Major Overhaul of COS tank 20, 21 & 09, Das Island
: Refurbishment of Tank Nos. TJA3, TJA17 and other misc works at Jebel Dhanna Terminal

quantity surveyor at NPCC
  • United Arab Emirates - Abu Dhabi
  • January 1991 to September 2013

Jan. 96: Zakum Field Facilities Expansion Project
: ZADCO Hook-up Project (H24/25/26/27/28 Campaign
: ZADCO Slot Extension Phase II
: ZADCO Test Separators Campaign
: Relocation of Test Separator at US 25A & US 86 Project for ADMA-OPCO

quantity surveyor at npcc
  • United Arab Emirates - Abu Dhabi
  • April 1991 to August 2013

re-measurement, contract administration - client, subcontractors, suppliers, invoicing client. cost control, cash flow etc

quantity surveyor at npcc
  • United Arab Emirates - Abu Dhabi
  • January 1991 to August 2013

re-measurement, contract administration

Quantity Survey / Contract Administration Section at Oil and Gas EPC
  • India
  • January 2001 to September 2012

21 years experience in Quantity Survey / Contract Administration Section for Oil and Gas EPC contracts
Sl. No. Period Duration (Years) Company Position Held
1 2001 until date 12 Years NPCC, Abu Dhabi, UAE QS
2 1991 - 2000 9 Years NPCC, Abu Dhabi, UAE Assistant QS


Major Clients dealt with are ADMA OPCO, MEARSK, SHELL and QP.

Brief description of duties and responsibilities: -

1. Claims and Arbitration

• Negotiation and correspondence on Force Majeure, disputes and claims.
• Preparation of documents, correspondences, Statement of Facts etc. to support disputes / arbitration and claims.
• Compilation of historical data and lessons learnt to estimation sections of previous projects.
• To ensure that all NPCC procedures are applied in day to day activities as intended.
• Assisting in preparation of facts for insurance claims, negotiations with loss adjuster and agreements.

2. Project Administration

• Measurement of Quantity of work performed and preparation of payment variations for invoicing.
• Monitoring of project budget and preparation of Management information reports such as forecast revenue, lessons learnt & highlights of the project.
• Monitoring of reimbursable services provided to client for invoicing.
• Review, assist and advise Project Manager on contractual issues and disputes.

3. Contract / Subcontract Management

• Verification of quantum of work, rates and prices, bonds, deduction, retention, scope reduction, attending meetings and MOM etc.
• Preparation of additional expenditure budget to obtain Management approval and issue Variation Order.

4. Supplier Management

• Verification of quantum of material supplied, PO amendments, guarantees, waivers. Calculation of Liquidated damages for late delivery.
• Project reconciliation report for materials.


Major Projects worked on:
Client: ADCO - EPC Contract - Contract value: US$ 683 Million
EPC for Bab Thamama "G" and Habshan 2, 1.8MMBOPD, Phase 1 Development

(a) 52 wells oil producers (b) 4 Remote Degassing Stations (c) Water Injection Clusters (d) New utilities (Fuel Gas, Instrument Air, Nitrogen Generation, Chemical Injection, process and closed drain system in BAB Centroal Degassing Station - BCDS) . HP and LP Flares. New Vapor Recovery Unit (VRU) in BCDS. CP system for new buried pipelines. (e) FOC to link between CDS and each RDS. (f) Pipeline of various size and length total to appox 680 KM, (g) total 130 tie-ins)

Activity involved in preparing variation / claims related to following:
- Wash water wells cabling due to relocation of 12 wash water wells (Scheme 1, 4 core - US$ 970K & Scheme 2, 3 & 4 core - US$ 1M)
Study the change in well location, obtain the regised applicable scheme for cabling & electrical works for Engineering, establish changes in any other system due to this change, quantify original scope and revised scope and carry out costing to prepare a variation proposal.

- Piperack adequacy check - MS1 - modifications / supplementing (US$ 500K)
Quantify the strengthening reqired, quantify change in scope, and carry out costing to prepare a variation proposa.

Also involved in:
- Subcontract Management (US$ 34 M) . Verification of quantum of work, rates and prices, bonds, deduction, retention, scope reduction, attending meeting and MOM etc.
Structural steel fabrication - US$ 11MM. Verification of quantity, prize in line with the weight, payment done to subcontractor based on weight.
- Supplier Management (US$ 270 M) . Verification of quantum of material supplied, PO amendment, guarantees, waivers, calculation of Liquidated Damages for late delivery. Novation for Turbine driven gas compressor & heat exchanger PO US$ 50 M.

MOQ, Al Shaheen field development
Client: MAERSK - EPC Contract - Contract value: US$ 895 Million

ED process platform (14, 021 MT), ED-EA bridge, GA Wellhead platform (4, 176 MT), GB Flare platform and bridges (150 MT), GD Integrated Wellhead & Process platform (10, 250 MT), Three interconnecting bridges at the G location, tie-in of the ED platform process and utility systems to the existing E location platforms.

Involved in preparation of variation / claims related to following:
- ED Platform Stock Tank compressor, repair, installation, hook-up, commissioning and successful 72 hour performance testing (US$ 997, 934.53)
- Fabrication of slug catcher spools for GA platform (US$ 54K)
- Growth claim GD & ED, 30% increase in weight (US$ 110 M)

Also involved in:
- Subcontract Management (US$ 52M) . Verification of quantum of work, rates and prices, bonds, deduction, retention, scope reduction, attending meeting and MOM etc.
- Supplier Management (US$ 400M) . Verification of quantum of material supplied, PO amendment, guarantees, waivers, calculation of Liquidated Damages for late delivery. Novation for Turbine driven gas compressor & heat exchanger PO US$ 50 M.

Soroosh and Nowrooz Integrated Development Project - Iran at Shell Exploration BV
  • June 2001 to December 2004

Soroosh and Nowrooz Integrated Development Project - Iran (duration 01/06/2001 - 20/12/2004)
Client: Shell Exploration BV - EPC Contract - Contract value: US$ 375 Million

NPCC entered into a Consortium Agreement for execution of the works based on the split of works. Naft Sazeh Qeshm Company (JV with NPCC) and Technip Middle East (Consortium with NPCC for Engineering & Procurement)

SWP-2 (3815 ton topside), SLQ Living Quarters (593 ton jacket + 1534 ton topside), SPP-1 (1265 ton jacket + 8995 ton topsides), SPP-2 (760 ton jacket + 3815 ton topsides), Bridge links: SLQ to SPP-2, SWP-1 to SPP-1, SPP-1 to SPP-2 (136, 458, 419 ton), 16" pipeline from SWP-2 to SSP-1, and sub-sea cable (4 km), Nowrooz Well-head / Production Platform 2 (NPP-2) substructure and topsides (620 ton jacket + 3815 ton topside), NLQ (1243 ton jacket + 1293 ton topsides), NWP-1 (1101 ton topsides), Bridge link NLQ to NPP-2 (210 ton), 18" pipeline from NWP-1 to NPP-2, and sub-sea cable (7 km), 22" pipeline from NPP-2 to SPP-2 and riser tie-ins (50 km), Connection of pipeline from SPP-1 to Floating Storage Unit (FSU) via riser on SPP-1.

Involved in
- Variations - evaluations of impact on scope and costing (US$ 20M)
- Settlement Agreement and Resolution of disputes with JV partner Technip (US$ 2.1M)
- JV between NPCC and NSQ was established in order to satisfy the Iranian Content requirement. Fabrication of structures was done in Iran except SPP-1.
- Insurance Claim. Introduction of seawater into the SPP2 / SPP1 first and second stage SS cladded separators and the other equipments of the facilities (US$ 7M)

EPQ Al-Khalij Eastern Field Development Project - Qatar
Client: Elf Petroleum Qatar, Qatar - EPC Contract - Contract value: US$ 62 Million

Three jackets (300, 550 & 575 tons), Two 950 tons each well-heads topsides, including buildings, One 70 ton deck, Two high-voltage sub-sea cable (7 & 44.5 km), Four sub-sea pipelines (total 63 km)

quantity surveyor at NPCC
  • India - Bengaluru
  • July 2000 to November 2001

July 2000 - November, 2001: Replacement of 24" Water Injection T/line USSC - US20A Block 5 Development Project 2001

quantity surveyor at National Petroleum Construction Company
  • United Arab Emirates - Abu Dhabi
  • January 1996 to December 1996

Jan. 96: Satah Water Injection Facilities Project
: QGPC Wellhead Jackets & Pipelines
: Dalma & H/Dalma Fields Development

Education

Bachelor's degree, Contract Administration
  • at India
  • March 1991

• Bachelor of Engineering (Mechanical) • Diploma in Contract Administration • Bachelor of Business Law (2nd year ongoing)

Bachelor's degree, mechanical
  • at BS Mechanical
  • February 1991

BS Mechanical Engineering

Specialties & Skills

Contract Management
Measurement System Analysis
Supplier Audits
Client Services
Pipeline Analysis
MILLION
PIPELINE

Languages

English
Expert

Memberships

NPCC
  • Quantity Surveyor
  • April 1991
facebook
  • communication
  • March 2010

Training and Certifications

ca (Certificate)
Date Attended:
April 2011
Valid Until:
September 2011
Diploma in Contract Administration, BE - Mech Engg, Business writing (Certificate)
Date Attended:
January 1995
Valid Until:
January 2012