APM Product Introduction Portfolio Manager
Alstom
Total years of experience :16 years, 7 Months
➢ Accountable for the Quality, Time, and Cost of all Product Introduction Automated People Mover (APM) deliverables
➢ Forecast and budget all resource needs in line with project milestones
➢ Responsible for the mobilization of Product Introduction Teams in all APM Projects, either ‘brown’ or ‘green’ fields.
Technical, Product Introduction, and Engineering Management support for ongoing Rail Projects and existing Service Delivery Centres in Europe, Middle East, Africa, & India Region; focused on Interface, Requirements, and Configuration Management.
- Functioned as the Engineering Head for Systems, Wayside, Signaling, and Electrical of Dubai Service Delivery Center (SDC) Site.
- Part of the management team that collaborated with other stakeholders to provide reporting, operation planning, implement health and safety best practices as well as Systems improvements.
Dubai Metro Project, Dubai, United Arab Emirates
⢠Ensured that system hardware and software are compatible and capable of required performance
design metrics.
⢠Led a multi-disciplinary team of Engineers and Supervisors for the Daily Operation and Maintenance
Tasks.
⢠Managed operation, control, monitoring, engineering, and maintenance services and ensure
operational consistency.
⢠24/7 On-Call duty for any urgent matters that would affect Daily Service.
Dubai Metro Project, Dubai, United Arab Emirates
⢠Managed the verification, test, and acceptance of Operation Control Systems and SCADA Work
Packages (Platform Screen Doors, Power System, Wayside Obstacle Detection System, Wheel Impact
Load Detection System, Tunnel Ventilation System, Rolling Stocks, Signaling System, Automatic Fare
Collection System, Environmental Control System, and Fire Protection System) of Dubai Metro Red
Dubai Metro Project, Dubai, United Arab Emirates
⢠Managed the verification, test, and acceptance of Communications Systems Work Package (Narrow
Band Radio-TETRA, Broadband Radio-WiFi, Multi-Service Network, Fiber Optic Network, Public
Address System, Passenger Information System, Telephone and Emergency Call Point Network,
Intruder Alarm System, CCTV System, Operation Control System, Onboard Communications System)
of Dubai Metro Red Line and Green Line.
Ortigas Ave., Pasig City, Philippines
⢠Developed project plans and coordinated with all concerned entities to ensure efficient project
implementation and service delivery.
⢠Designed Layer-2 Carrier Ethernet Network and Traditional Leased Lines for clients and customers.
⢠Prepared technical studies and circuit designs for customer network provisioning. Consolidated all cost
involve in service provisioning.
in
in
URL removed due to policy violation. Please contact support for further information.