Piping Engineer
Sinopec
مجموع سنوات الخبرة :9 years, 2 أشهر
Review the test package before making the test limits based on the pipe class, size and design pressure.
Test packages preparation (test package numbers, pressure, isometric index, line list, systems, sub -systems details, line class and PID details) based on client given information
Making the pressure test packages and marked up the isometric and PID drawings.
Arrange the priority test packages based on the construction status on site.
Prior given to QC doing a construction line walk and making the punch list.
Fallow up the punch list and resolve problems in test packages.
Making the as built drawings based on the site conditions.
Approval purpose Pressure test packages are submitted to client.
Fallow up the hydro test, pneumatic test and visual test preparation on site.
Responsible for all Quality Activities in Piping.
Witnessing hydro testing, pneumatic testing, flushing and pickling, cleaning activities.
Co-coordinating the pressure testing team.
Maintaining the daily hydrotest department master log list.
Prepare the hydrotest and flushing permits based on the work.
Preparation of the MIVR based on site requirements.
Fabrication and installation of A/G and U/G Piping works at different areas.
Preparation of different types of work permits for the mechanical activities, attend the Permit to Work training classes, identify and control the hazards, site visit with client, and preparation for site audit.
Prepare the lifting plain for erection of the equipment’s and pipe lines.
To execute overall on plot piping fabrication and erection works include identification of materials, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding, installation of piping, as per applicable codes, procedure and standards.
Checking the Piping line and supports on site by using the isometric drawings.
Making the punch list based on the isometric drawings.
Maintained the workers daily work progress and inform to lead engineer.
Prepare daily report of work progress and man utilization.
Supervision of all piping work according to isometric drawings.
Erection of equipment on site using latest construction drawings.
To ensure that project specification and standard codes for installation are were correctly executed during piping erection and fabrication.
To supervise the pipe spool erection and pipe supports according to the latest issued construction drawings.
To monitor the daily progress work and update to the lead construction engineer.
Planning & monitoring the work for timely completion of the project.
To assure the lifting equipment tools & tackles are in proper condition.
Conduct safety walk through in the site in coordination with safety department on weekly basis.
Assure the work is carried out as per P&ID’s, layouts drawings & isometrics.
Prepare daily report of work progress and man utilization.
To monitor the daily progress work and update to the lead construction engineer.
Material and tools issued to the workers.
Maintained the material store records.
Arrange the works depends upon the importance of the work.
Equipment maintenance and repair works.
Mechanical engineering