Dy. Manager QC
CS Dhorajia JV
Total years of experience :15 years, 1 Months
⦁ ensures that all products of the company meet consistent standards.
⦁ Carries out ongoing lab and field sampling. Auditing visual, dimensional, and mechanical tests of materials and processes.
⦁ Conduct routine and non-routine analyses of in-process materials, raw materials, environmental samples, finished goods, or stability samples.
⦁ Document and implement inspection criteria and procedures.
⦁ Formulate timely reports and documentation to track progress.
⦁ ensures that all products of the company meet consistent standards.
⦁ Carries out ongoing lab and field sampling. Auditing visual, dimensional, and mechanical tests of materials and processes.
⦁ Conduct routine and non-routine analyses of in-process materials, raw materials, environmental samples, finished goods, or stability samples.
⦁ Document and implement inspection criteria and procedures.
⦁ Formulate timely reports and documentation to track progress.
⦁ Perform regular quality assessment on all incoming materials from the vendor
⦁ Measures product dimensions, examine functionality and compare the Final product to the specifications.
⦁ Documents inspection outcomes by completing detail reports and performance records.
⦁ Resolve quality related issues in a timely manner.
⦁ Preparing Inspection Testing Plans (I.T.P) as per the project requirements.
⦁ On field weather conditions correcting the mix design before mixing the shotcrete/concrete on batching plant.
⦁ Approve in process activity by confirming required specifications, conducting test and communicating with Project Manager.
⦁ Preparing concrete Mix Design, maintaining material testing certificate
⦁ And performing physical test on field.
⦁ identifying and establishing new business
⦁ Organizing sales visits
⦁ Liaising with existing clients
⦁ Preparing proposals and quotations
⦁ providing pre-sales and post-sales support
⦁ negotiating contracts, terms and conditions
⦁ reviewing cost and sales performance
⦁ writing reports and sales literature
⦁ providing product education and advice
⦁ attending trade exhibitions, conferences and meetings
⦁ Ensuring that sales targets are met.
⦁ Conduct inspection and checking on quality of material &site works.
⦁ Coordinate with client for material quality and consultant for work progress.
⦁ Attending Site meeting with Consultants.
⦁ Construction material arrangements.
⦁ Preparation of weekly and monthly reports on all operations undertaken.
⦁ Assigning labor to different activity of site works.
⦁ Preparing BBS and Checking Shuttering works.
⦁ Promoting the best construction practices. Undergo activities and practice that comply with the procedures of the company and the technical specifications,
⦁ Assists in planning and development of resources such as manpower, machinery, equipment and materials.
⦁ face any unexpected difficulties raised from the technical side at any point of time & resolve it in the most efficient manner as possible.
⦁ Maintain the activity delay record in case bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
⦁ setting out the works in accordance with the drawings & specification.
⦁ Know the technical details from the above level and make it practice in the site.
⦁ Coordinate the information, details and efficiently understand the ideas from the higher level accurately and pass it to the contractors, supervisors and labor workers
⦁ Monitored consistently the actual progress of the assigned project
⦁ Assign manpower to the respective activity, control wastage of materials on the site, next day planning.
⦁ Measurements & evaluation in collaboration with the project quantity surveyor where appropriate.
⦁ Assure the work is completed and delivered without any defect and delay.
⦁ Perform regular quality assessment on all incoming materials from the vendor
⦁ Measures product dimensions, examine functionality and compare the
⦁ Final product to the specifications.
⦁ Documents inspection outcomes by completing detail reports and performance records.
⦁ Resolve quality related issues in a timely manner.
⦁ Preparing Inspection Testing Plans (I.T.P) as per the project requirements.
⦁ On field weather conditions correcting the mix design before mixing the shotcrete/concrete on batching plant.
⦁ Approve in process activity by confirming required specifications, conducting test and communicating with Project Manager.
⦁ Preparing concrete Mix Design, maintaining material testing certificate
⦁ And performing physical test on field.
⦁ Measures product dimensions, examine functionality and compare the Final product to the specifications.
⦁ Documents inspection outcomes by completing detail reports and performance records.
⦁ Resolve quality related issues in a timely manner.
⦁ On field weather conditions correcting the mix design before mixing the shotcrete/concrete on batching plant.
⦁ Approve in process activity by confirming required specifications, conducting test and communicating with Project Manager.
⦁ Preparing concrete Mix Design, maintaining material testing certificate
⦁ And performing physical test on field.
⦁ face any unexpected difficulties raised from the technical side at any point of time & resolve it in the most efficient manner as possible.
⦁ Maintain the activity delay record in case bad weather, lack of manpower, lack of material, late transportation of requested material on the project site.
⦁ Setting out the works in accordance with the drawings & specification.
⦁ Know the technical details from the above level and make it practice in the site.
⦁ Monitored consistently the actual progress of the assigned project
⦁ Assure the work is completed and delivered without any defect and delay.
⦁ Execute work on site carried out according to specification/drawings.
⦁ Preparation of work planning schedule, material, and documentation.
⦁ Measures product dimensions, examine functionality and compare the Final product to the specifications.
⦁ Make adjustments in mix design as per moisture content.
⦁ Maintaining inward and outward material testing record as per QC specifications.
⦁ Field testing of Reinforcements bar, concrete M30, maintains cement material testing certificate by supplier.
⦁ Billing with measurement checking as per the given drawings.
⦁ Prepare weekly and monthly progress report.
⦁ Site control and execution of all works.
⦁ Making daily report on all operations undertaken by contractors.
⦁ Checking Mivan Shuttering, Reinforcements before pouring concrete and take approval from the consultant engineer and prepared necessary documents.