Structural Design engineer
El Seif engineering & contracting
Total years of experience :9 years, 10 Months
KAFD (SCIENCE AND GEO-CLIMATE MUSEUM) PROJECT.
* Doing co-ordination for the structural scope and other disciplines
(Arch/Elec/Mech/HVAC…etc.) in order to prepare proper
Structural Shop Drawing.
* Investigations for the existing as built Concrete buildings and
steel structures in order for the Erection of the Steel Structure and
Detection of any clashes or problems to be solved before lifting
of the steel trusses & steel bridges.
* Designing RC/steel to Steel/RC Connections.
* Production of lifting plans and lifting models for the steel
structures connecting the concrete buildings together.
* Checking and verification of Structural Elements Strength for
Extra Additional Loads other than design loads.
* Preparing Steel Shop Drawing (Fabrication (S.P/Assembly-
Erection Layouts-Material List -B.O.Q).
* Checking the ability of R.C members’ connections resistance for
the new steel members supported by the concrete beams-
columns.
* Preparing Erection Plan for the Steel Elements.
* Acting in-site as a Technical-Site Engineer during the Steel
Trusses and Steel Bridges during Lifting and Erection Phases.
* Co-ordination between the old concrete building, the new
concrete building and the new steel building.
* Proposing and Application of Solutions for Structural issues.
CARGO -JEDDAH & CARGO-RIYADH PROJECT.
* Investigating and Reading the Tender Structural Drawings beside
other disciplines Drawings in order to rectify them if there’s any
clashes prior construction.
* Investigating and Reading the Specifications, Design Models,
Design Loads Data, B.O.Q…etc.
* Ensuring Identical Quantities between both of the Tender
Drawing and the Submitted B.O.Q.
* Preparing Mobilization Plan.
* Making site Visits and Investigating the Site to clarify the site
conditions of all aspects Especially Studying the Gravity and the
Possibility of the Existing Utilities Rerouting.
* Making Proposals for suppliers in different scope of work
(Structural-Steel-Cladding-Geotechnical-..Etc.) And Studying
their Submitted Contracts and reports from Technical wise.
* Design of footings for the buildings and Co-coordinating the
variating levels of the column necks of the foundations.
JUSTICE PALACE PROJECT.
* Western Gate Extension project.
* Design of an R.C building (beams-columns-foundations-shear
wall-core).
* Designing RC to Steel Connections.
* Designing Steel to RC Connections.
* Checking Strength Of Old RC members (beams-columns-raft)
under the imposed new loads plus original applied loads.
* Checking the ability of R.C members’ connections resistance for
the new steel members supported by the concrete beams-
columns.
* Checking the new steel frame building.
* Co-ordination between the old concrete building, the new
concrete building and the new steel building.
* King Fahd Plaza Pergolas project.
Design of footings for the precast pergolas
Co-ordination the variating levels of the column necks of
the foundations
*STEEL STRUCTURES MODELLING AND DETAILING (GAS/AIR DUCTS, PORTAL FRAMES, TANK, WIND TURBINES TOWERS, ...ETC)
*DESIGN OF PORTAL FRAMES, TANKS, CONNECTIONS
*PREPARATION OF FABRICATION & ERECTION DRAWINGS (SINGLE PARTS-ASSEMBLIES-LAYOUTS-PARTLISTS)
*QTO WORKS FOR STEEL MEMBERS
were carried out design & construction for 5 villas and 20 typical 16-storey
buildings and other 4 non-typical buildings
Shared Site Places
1. A project owned by The Ahli Bank Alex Branch.
2. A Residential Building located at the Fifth settlement.
A brief of different site works were held & supervised
Insulation Works and Flooring Installations.
False Gypsum Boards Ceilings Installations.
Complete Finishing works supervision.
Various pouring and curing works of different structural and non-
structural members.
Trying to maintain a specific rates according to consultancies or a
Schedule if existed.
Deterioration and replacement of any damaged parts if exists.
Shared Site Places
1. Glass cans Manufacture Factory Located at The Seventh
neighborhood.
2. A Residential building located at the Fifth settlement.
3. A 2 floored Villa located at the Fifth settlement.
A brief of different site works were held & supervised
Complete Finishing works supervision.
Pouring of R.C columns, slabs, beams and foundations.
Various pouring and curing works of different structural and non-
structural members.
Trying to maintain a specific rates according to consultancies or a
Schedule if existed.
Deterioration and replacing any damaged parts if exists.
Design of R.C 3 story villas
Design of R.C 7 floored Residential Building
Bachelor of science in Civil Engineering (Structural Department Major) Graduation project : Structure Project Project Grade : Excellent