خالد عمرو,

خالد عمرو

AMEA POWER

البلد
الأردن
التعليم
ماجستير, General Business Management
الخبرات
42 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :42 years, 10 أشهر

في AMEA POWER
  • الأردن
  • يوليو 2018 إلى نوفمبر 2019
Site Manager في ILF Consulting Engineers Aswan
  • مصر
  • أبريل 2018 إلى يونيو 2018

with ILF Consulting Engineers; in its role as the Project Company Engineer on Phoenix
1 a 50 MW PV Solar Power Plant within the Benban Solar Farm near Aswan, Egypt.
The plant is a single axis rotation PV Polycrystalline Solar Modules connected through combiner
boxes to 22 x 2.5 MW packaged Inverter Stations that have the Inverters, Transformers and
associated SF6 switchgear and RMUs.

Commissioning Manager في ILF Consulting Engineers
  • الإمارات العربية المتحدة
  • نوفمبر 2017 إلى أبريل 2018

with ILF Consulting Engineers; the Project Company Engineer on
Phase A; 200 MW of the DEWA Phase III 800 MW PV Solar Power Plant and the associated
132/33 kV transformers and associated GIS at the Power Plant Substation. The Plant consists
of 806992 single axis rotation Canadian Solar Panels and fifty GE Power Blocks (Inverters,
Transformers and RMUs).

Site Manager في Black & Veatch Amman
  • الأردن
  • أبريل 2016 إلى أكتوبر 2017

with Black and Veatch as

Project Manager في First Solar Inc
  • الأردن
  • نوفمبر 2014 إلى مارس 2016

Project Manager with First Solar; on the 52.5 MW PV Solar Power Plant Project at Ma’an, Jordan.
The project is called Shams Ma’an Project an 18-month project worth 120 Million US Dollars.
When it is completed, in 2016, the facility will supply an estimated 160 million kilowatt
hours (kWh) of electricity per year, which is equivalent to approximately one percent of
Jordan's annual energy output.

Project Manager في Shamara Holding Group Company
  • العراق
  • أغسطس 2013 إلى أكتوبر 2014

Project Manager with the Shamara Holding Group Company (Contracted through Voyage
Global Energy - UK) at the Shatt Al-Basra 10 x 125 MW GE Frame 9 E Simple Cycle Gas Turbine
Power Plant Project. The Gas Turbines are designed to run on dual fuel; Natural Gas and Light
Distillate Fuel Oil. The Project is an 18-month EPC Project worth 350 million US Dollars for the
Ministry of Electricity (excluding the price of the GTs).
Responsible for the management of all the aspects of the project, to ensure the safe and timely
completion of the project to the highest engineering requirements and design specifications.

Construction Manager في Arabian Bemco Construction Co
  • المملكة العربية السعودية
  • فبراير 2009 إلى يوليو 2013

10 a 4000 MW Combined Cycle Gas Turbine Power Plant Project worth 11 billion Saudi Riyals.
In charge of the construction of two (2) Power Blocks each block has eight (8) GE Frame 7 Gas
Turbines in addition to their associated electromechanical equipment; transformers, stacks,
coolers, etc.

Commissioning Manager في Consolidated Contractors International Co.
  • قطر
  • أكتوبر 2007 إلى ديسمبر 2008

Manager of the Pre-Mechanical Commissioning Department at the QGXII on Shore
Expansion Project with CCC working for Chiyoda Technip Joint Venture building Qatar Gas
Onshore LNG Process Expansion Project in Ras Laffan, Qatar.

Project Manager في El Concorde Construction Ltd
  • ps,0,0
  • ديسمبر 2005 إلى أغسطس 2007

Project Manager for the Halhul-Dura-Yatta Bulk Water Transmission System; a 600 mm
diameter 22 Km buried ductile iron pipe project carrying drinking water, including the
construction of a 5000 cu. Meter water tank, for the PWA/PNA funded by AGENCE
FRANCAISE de DEVELOPEMENT. The total value of the project is € 9, 288, 889.00

Construction Manager في Enron Engineering & Construction Co. / PEC
  • ps,0,0
  • فبراير 2000 إلى ديسمبر 2005

(representing the owner) for the Gaza 140 MW CCPP
(Combined Cycle Power Plant) construction project; reviewed P&ID’s and vendor manuals
and followed up with the Contractors' QA/QC personnel to verify proper material and
installation.
Reviewed and approved installation method statements, welding specifications and
welder qualifications. Supervised the Performance testing, Commissioning and Turnover
Packages of the Simple Cycle (Gas Turbine) and Combined Cycle (Gas Turbine and Steam
Turbine).

Department Head في First Option Construction Management Co
  • ps,0,0
  • يناير 1995 إلى يناير 2000

Reviewed all the tender documents and the approval of the most suitable Contractor to
perform the task based on the result of the contractor qualification evaluation documents.
Reviewed the mechanical design drawings submitted by the local design offices and
negotiated the contracts with local contractors based on their qualifications.

Operations Engineer في SCECO
  • المملكة العربية السعودية
  • يناير 1980 إلى يناير 1995

Directed the mechanical works for the erection, commissioning and start-up of the Gas
Turbines in coordination with operations and maintenance personnel of power plant
projects for Saudi Consolidated Electric Company.
Reviewed Gas Turbine operational modes and recommended procedures to extend
turbine combustion, hot gas path and compressor component lives.

الخلفية التعليمية

ماجستير, General Business Management
  • في King Fahd for Petroleum and Minerals (KFUPM)
  • يناير 1990

بكالوريوس, Mechanical Engineering
  • في Washington State University
  • يناير 1980

Specialties & Skills

Planning
Economy
Occupational Health
Occupational
MECHANICAL
MICROSOFT WORKS
PERSONNEL
QUALITY CONTROL
FRAMING
WELDING
CONTRACT MANAGEMENT
ENGINEERING
MECHANICAL DESIGN

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الاسبانية
متمرّس
التركية
متمرّس