Work Experience

Total years of experience :24 years, 3 Months

Project department manager at ICF (International crane factory)
  • Egypt - Alexandria
  • My current job since February 2021

Handle project (engineering, procurement, installation, planning)

Sr.Mechanical Design Engineer at arab steel
  • Saudi Arabia - Dammam
  • My current job since January 2012

• Perform Stress calculations for pipelines According To International Codes and standards
• Perform engineering, procurement, including preparing material specifications, material and purchase requisitions
• Produce in house Detail Design Document, General Arrangement DWGs, Piping Plan, Piping Isometric, Equipment Selection, Equipment and Piping Material Data Sheet, Piping Class
• Generate Concept Design, Identified Problem & Solution
• Support The Construction Field Requirements
• Prepare / Review Cooling Water And Media Demand And Hydraulic Calculation
• Prepare / Review PFD, P&ID
• Provide Heat Balance and Mass Balance Calculation and Propose Design Modification
To Optimized Existing System Operation and Running Cost
• Perform Design Calculation For Degusting System Along With Equipment Selection And
Supported DWGs
• Produce/ check material quantity take-off
• Design of Sprinkler System
• Design Of Sedimentation Tank
Review Vendor Print and Design Calculation

Project manager at ITS Group Egypt
  • Egypt - Sharm el Sheikh
  • August 2011 to January 2012

• Carry out Site Mobilization, Organization and Resource Utilization
• Attending Progress, Safety Meeting With Client
• Carry Out Correspondence, Communication With Client and Supplier
• Coordination of Technical Submittal and Drawing Approval
• Prepare Various Documentation Including, Project Schedule, Method of statement, Reports, Cost Estimation, etc.
• Ensuring all materials used and work performed are as per Contract specifications
• Overseeing the selection and requisition of materials
• Overseeing quality control, health and safety matters on site
• Produce and Follow up Invoices, Payment and Variation Order
• Monitor, Review the work progress
- Project Name
- Chemical Injection System (Manifa Gas Facilities), Saudi Aramco
- Acid Neutralization System (Corporate Data Center), Saudi Aramco
- Demulisifier Injection Skids (Manifa Upstream Offshore Pipe Line), Saudi Aramco
- Scale Inhibitor and Corrosion Inhibitor dosing skids, Saudi Aramco
- STP (Sewage Treatment Plant (MBR)) & RO Plants (GOSI Office Park), GOSI
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
- Fountain and Swimming Pool (Ayhar Villa), Saudi Oger.
- Fountain and Swimming Pool (Yamama Family Villas), Saudi Oger.

Sr. Project Engineer at AES
  • Saudi Arabia - Riyadh
  • August 2009 to August 2010

• Handle the Kick off Meeting for All Project
• Produce Project Schedule
• Review Engineering Document and Drawing
• Manage Engineering Activity
• Prepare Technical Submittal and Get Client Approval
• Manage Procurement Activity
• Manage QC Activity and Coordinate PIM (Pre Inspection Meeting)
• Manage Installation and Commissioning Activity
• Communication with Client and Inside Company
• Cost Control and Prepare Invoice
• Prepare Project Final Dossiers
• Prepare Material Data Sheet and Guide Material Selection
• Communicate With Supplier for Local and Off Shore Material

Site Manager at Trading and Agency Services LTD
  • Qatar - Doha
  • August 2004 to July 2009

• Managed a team of 150 people, and assigning them task
• Liaised and assist contract manager in order to ascertain the cost for the construction work
• Quantity surveying for (Piping, Steel Structure, Equipment, Painting, Scaffolding, Insulation, RT, PWHT, PMI, )
• Dealing with day to day contract and site issue for construction
• Plan, control and monitor the work progress, quantity and quality of the construction work to ensure Compliance to design specification
• Identified necessary corrective action and prepare the technical query
• Check all of construction work package drawings (P&ID, Piping Plan, ISO DWG, Others)
• Prepared reports for project manager
• Prepared the costing sheet for all constriction activity (piping, equipment, scaffolding, and Steel Structure)
• Prepared the costing of material and equipment related to the construction work
• Performed Site Supervision for new modification (Equipment erection, piping modification, Instrument and electrical Modification)
• Quantity surveying, Material Take off and cost estimation
• Measuring actual work and Produce as built drawing
• Carried out preparation of lifting plan (LP), method statement (MS) and job safety analysis (JSA) for Equipment Installation and Piping Fabrication and Erection
• Dealing with subcontractor and supplier
• Check subcontractor invoice and submitting CWR invoices to client
• Prepare bill of material (piping, structure, instrument and electrical)
• Manage, coordinated and follow up all material controlling at site
- Project Name
-5 year unit rate maintenance contract at Qatar petrochemical Company (QAPCO)
- Replacement of ESD Generator & installation of plate exchanger during QAPCO GSD
- Replacement of quench water new air Cooler in Ethylene plant lactated at QAPCO
- July-Aug., 2005 Equipment engineer for Pul Hanin (PS 3) offshore shutdown
- May-June, 2005 Equipment engineer for Maydan Mahzan (PS 2) offshore shutdown
- Feb.-Mar., 2005 Engineer In-Charge for Boiler and gas turbine shutdown at Ras GAS - Nov., 2004, Mechanical supervisor for train 3 shutdown at RAS GAS
- Shutdown engineer for exchangers cleaning (Hydro jetting) in Qatar Vinyl Company
(QVC)
- Piping engineer for construction of New Caustic Soda line in (QVC)

Mechanical Engineer at Porcelain International
  • Egypt
  • October 2003 to July 2004

* Provided site supervision for equipment erection (Static, Machinery, Tunnel Kiln)
* Provide site supervision for piping fabrication and erection
* Produce fabrication Procedure for Tanks, Silo
* Provided Installation supervision for piping fabrication and erection
* Maintained of fluid power system
* Planed and identified lubrication schedule
* Prepare bill of material and purchase request

Material Control Manager at Samsung EngineeringCO., LTD. Tabriz, Iran (ABS Plant)
  • Iran
  • June 2001 to November 2002

• Monitor, coordinate and report on material related activities from estimates through preparation of bill of materials, ordering, transportation, receiving, installation and surplus disposition. Responsible for logistics, warehousing and facility
• Verifies that the documentation on each order matches the freight description
• Maintain auditable records of receiving and issuance data, non-conformances, shortage material and warranty necessary for documenting the material control and warehousing processes.
• Receive all incoming shipments. Make arrangements for and oversees unloading and handling of goods.
• Prepare warehouse requests; removes goods from storage for authorized consumption and utilization; bags, tags, and otherwise prepares goods for issuance; and makes the goods available at the point and time of need.
• Control issuance of equipment and goods to subcontractors.
• Identify, receive approval for, and disposes excess materials. Prepares close-out documents at the end of projects.

Mechanical engineer at Samsung Engineering CO., LTD.
  • Egypt - Alexandria
  • September 1999 to August 2001

• Unpacking inspector (inspection of construction material, equipment and spare parts)
• Material expeditor
• Prepare martial issuing plan according to site demand
• Mechanical Supervision for equipment erection
• Jointed pre-commissioning and commissioning for mechanical supervision
• Coordinate with vendor for equipment installation
• Preparation of inspection document and close out document

Mechanical engineer at Samsung Engineering CO., LTD.
  • Egypt - Alexandria
  • September 1999 to August 2001

• Unpacking inspector (inspection of construction material, equipment and spare parts)
• Material expeditor
• Prepare martial issuing plan according to site demand
• Mechanical Supervision for equipment erection
• Jointed pre-commissioning and commissioning for mechanical supervision
• Coordinate with vendor for equipment installation
• Preparation of inspection document and close out document

Equipment Engineer at Daelim Industrial CO., LTD. at El
  • Egypt - Alexandria
  • September 2000 to April 2001

• Performed Site supervision for equipment erection (Static Equipment & Machinery)
• Carried out mechanical inspection for equipment installation (Static Equipment & Machinery)
• Implemented Mechanical Supervisor for pre-commissioning and commissioning
• Mechanical Inspector for compressor, Turbine and pump alignment, performed the performance test of centrifugal Pump
• Engineer in-Charge for refinery catalyst loading, and installation of structure packing
• Working with vendors supervisor During Commissioning
- Project Name
Middle East oil refinery, Midor Co., LTD.

mechanical engineer at egyption air force
  • Egypt - Alexandria
  • March 1998 to June 1999

• Maintenance of Diesel Generator
• Maintenance of electrical distribution Panel

Education

Bachelor's degree, Mechanical power engineering
  • at Alexandria University
  • May 1996

Mechanical Power Engineering

Specialties & Skills

Project Management
Equipments
Quantity Surveying
• AutoCAD -2D,2007
• Primavera P6
• MS Office

Languages

English
Expert

Memberships

saudi conucil of engineering
  • consultant
  • May 2013

Training and Certifications

• Training Course ASME 31.3 (Training)
Training Institute:
ASME
Date Attended:
April 2010
Duration:
48 hours