Electro-Mechanical Manager
Saudi Binladin Group - ABCD / PBAD
Total years of experience :34 years, 2 Months
Review all MEP design, shop drawings, material submittals / samples.
Check for constructability, compliance with code and contract documents.
Monitor and control the RFI of all MEP equipment / systems’ drawings and
materials. Review As-built drawings and O & M manuals for all MEP
works. Coordinate MEP works with architectural, civil, structural and
specialist disciplines. Liaise with local authorities having jurisdiction over
the project. Liaise with the client's representatives. Manage and control the
technical office engineers for the following projects:-
The Two Holy Mosques Third Saudi Expansions (Makkah & Madinah-KSA) for
Prophet Mosque Expansion, (MEP technical Manager / SBG-ABCD).
First Ring Road, Bus Stations in Makkah (MEP Manager / SBG-ABCD).
Mataf Expansion in Makkah, (MEP Technical Manager / SBG-PBAD).
Saudi Arabia, P.O. Box 25120
Review and approve all shop drawings, material submittals, samples and
compliance with contract documents of MVS, LVS, stand-by diesel
generators, HVAC's, H/C water equipment, pumps & controls, elevators,
escalators, BMS, kitchen and laundry equipment, fire protection systems,
smoke management system, fire alarm, ICT systems, lighting & power
networks, lightning & grounding protection, heliports, …etc.
Manage & control the project quality assurance plan. Monitor and control
the RFI of all systems. Review as-built drawings and O & M manual.
Coordinate MEP works with specialist disciplines. Review contractor’s
MEP change order proposals. Review contractors’ claims and change
orders. Liaise with local authorities having jurisdiction over the project.
Liaise with the client's representatives. Manage and control the site
engineers for the following projects:-
Move pick Hotel on lots 126, 129 & 130 in Medina central area,
KSA. of 152000m2, 23 floors, 1500 residential unit, including one royal
floor, three floors shopping center, Helipad at upper roof floor, four
subsurface floors for parking and electromechanical services.
Dar Al-Eman-Intercontinental Hotel, Medina of 73000m2, 21 floors.
Marriott Hotel, Medina of 13600m2, 17 floors.
Holiday inn Hotel, Medina of 52000 m2, 23 floors.
Dar Al-Hegira-Intercontinental Hotel of 41000m2, 21 floors.
Dar Al-Taqwa-Intercontinental Hotel of 40000m2, 21 floors.
Dar Al-Tawheed-Intercontinental Hotel (PHO process), Makah.
Bathel Al-Khair Hotel-01 on lots 2089 & 2090 of 27000 m2, 17 floors.
Bathel Al-Khair Hotel-03 on lots 4046, 47 & 48 of 45000 m2, 18 floors.
HRH Prince Naif Project on lot 2076 of 15000 m2, 15 floors Medina
King Abdullah Palaces Safa Palace additions, Makah & Mena.
HRH Prince Sultan Palaces Additions, Medina, Makah and Taif.
Medina Prince Palace Ext. Villa (Class A).
Residential Complex, 500 Villas, Medina.
Residential Complex 10 Villas, Al-Awali, Makah.
Page 2 of 3
Engr. Khaled Fekri Morsi’s contacts: 00966502322931 E-mail: k.fekri@yahoo.com
Organize and implementation of Technical Electrical seminars to the
trained engineers on various electrical topics with the aid of various
publications software of ETAP, (Electrical Transient Analyzer Program)
developed by module to cover most of the electrical circuitry from power
generation to the consumers (for both Industrial and Domestic
applications) device.
Projects
Affairs (SIIC) Al Hawamdiah
Responsibilities included the leadership, training and implementation of
procedures to ensure efficient, maintenance and operation of all air force
electrical systems.
Page 3 of 3
Engr. Khaled Fekri Morsi’s contacts:
Education