•DURATION : FROM: 01-Feb-2021 To: 15-Aug-2022
•PROJECT : Construction of 18 Residential Building @ Al Mansoura Al Gadida City-Dar Misr Project
•LOCATION : New Mansoura City - Egypt
•CLIENT : New urban Committee Authority
•SCOPE OF WORK:
-Maintain & Update the time schedules, Progress Measurement System & Resources histograms.
-Monitoring time Schedule for all Works in the site using Control Sheet, S-Curve & Programmed software. (Primavera P6).
-Providing measurements weekly/monthly productivity of the project construction of the field stuff compared with the amounts of work.
-Follow up the work Progress & compare it with the planned to grantee best performance for the project executions to highlight in case of deviation.
-Trending & forecasting costs & work hours required to complete the project.
-Providing revised time schedules.
-Maintain recovery plan to compensate the slippage if any as a fast tracking or crashing.
-Preparing & review of the projects budget & Cost. (Materials, Subcontractors, Manpower (Internal/External), Equipment).
-Review Stuff transfer according to budget and cost centers.
-Follow up project's requisitions.
-Preparation of variation orders request.
-Preparation CTR considering productivity rates and nature of the work.
-Prepare delay analysis study for the project and full support analysis for claims for EOT with all supporting documents
Field: Oil & Gas
•DURATION : FROM : 01-04-2018 TO 16-07-2019
•PROJECT: Zubair Permanent Power Generation Plant (ZPPG), 319MW (3x GT13E2+1 spare GT) + BOP for 600MW on full EPC basis.
•LOCATION: AL ZUBAIR, Southern area of Iraq, 20 km from Basra city.
•Client: GE/ENI
•SCOPE OF WORK: -
-Monitoring & Control the Master Time Schedule (Civil, Electrical, Mechanical).
-Update the Time Schedule with Actuals and forecast plan in close coordination with construction manager/team.
-Create S-Curves for Progress of Concrete, Steel Structural, GRE Pipes, cable pulling in close coordination with engineering team.
-Monitor & update manpower & equipment for best maneuvering to achieve the project in high performance.
-Develop / update the DRAFT progress measurement system.
-Attend the daily/weekly & monthly Progress Meeting. (7 non-technical Building, 3 technical building, 10 steel structure building, 7 tanks, GRE, CS, SS Pipes, 4 Gas Turbines with their BOP, 4 diesel generators)
Field : Residential
•DURATION : FROM: 01-Feb-2021 To: 15-Aug-2022
•PROJECT : Construction of 18 Residential Building @ Al Mansoura Al Gadida City-Dar Misr Project
•LOCATION : New Mansoura City - Egypt
•CLIENT : New urban Committee Authority
•SCOPE OF WORK:
-Maintain & Update the time schedules, Progress Measurement System & Resources histograms.
-Monitoring time Schedule for all Works in the site using Control Sheet, S-Curve & Programmed software. (Primavera P6).
-Providing measurements weekly/monthly productivity of the project construction of the field stuff compared with the amounts of work.
-Follow up the work Progress & compare it with the planned to grantee best performance for the project executions to highlight in case of deviation.
-Trending & forecasting costs & work hours required to complete the project.
-Preparing & forecasting the cash flow (Cash Call) (In/Out).
-Providing revised time schedules.
-Maintain recovery plan to compensate the slippage if any as a fast tracking or crashing.
-Preparing & review of the projects budget & Cost. (Materials, Subcontractors, Manpower (Internal/External), Equipment).
-Review Stuff transfer according to budget and cost centers.
-Follow up project's requisitions.
-Preparation of variation orders request.
-Preparation CTR considering productivity rates and nature of the work.
-Preparing Invoice & AMP (Application for Milestone Certificate)
-Prepare delay analysis study for the project and full support analysis for claims for EOT with all supporting documents
Field: Oil & Gas
•DURATION: FROM 01-01-2018 To 01-04-2018
•PROJECT: Manufacturing, Welding & Installation of Pipes at Zohr Project
•LOCATION: Port Saied, Egypt
•CLIENT: PETROJET/PETROBEL/ENI
•SCOPE OF WORK:
-Monitoring & Control the Time Schedule.
-Update the Time Schedule with Actuals and forecast.
-Monitoring productivity rates and equipment maneuvering.
-Create S-Curves for Progress in close coordination with engineering team.
-Create manpower histogram.
-Develop / update the DRAFT progress measurement system
-Attend the daily/weekly & monthly Progress Meeting Carbon Steel Pipes (from 2" to 42" / Cathodic protection Steal Structure Pipe racks / PT / RT)
Field: Oil & Gas
•DURATION: From 01-07-2015 To 01-02-2016
•LOCATION: Industrial Area - 6 October City - Giza - Egypt
•SCOPE OF WORK: Responsible for production line of Electrical power & Control panels under the umbrella of Schneider Electric Egypt (as a partner) in accordance to Schneider Co. policy & Norms. (Part Time)
Field: Oil & Gas
•DURATION: From 01-01-2013 To 01-03-2013
•LOCATION: Nasr City - Egypt
•SCOPE OF WORK: design indoor & outdoor lighting through manual calculation & DIALUX Software, design AutoCAD electrical drawings according to the Egyptian electrical Code & IEC.