QA/QC MANAGER
DRAKE & SCULL CONSTRUCTION KSA
Total years of experience :34 years, 11 Months
QA/QC Manager
Project: - Construction of High Rise Buildings LAMAR TOWERS Jeddah KSA.
High rise building LAMAR TOWER, working with ACONEX, review submittals, MEP and CIVIL. Review concrete mixes up to C70. Manage concrete quality, implement approved quality manual. Liaison with consultant
a) Quality management for the ongoing all activities (Electrical, Mechanical, civil)
b) Implement the quality documents.
c) Monitor the quality and testing of FLOW and waterproof concrete mix designs-up to 70Mpa.
d) Review quality plans and Quality manuals.
e) Conduct Inter audits and maintain quality reports+ inspections.
f) Preparing, ITPs, Method statements etc.
QA/QC Manager
Project: - Construction of High Rise Buildings for KING ABDULLAH Financial District at Riyadh KSA
a) Quality management
b) implement the quality procedures and Method Statements, ITPs
c) Implement the internal audit program+ Reporting
d) Manage to control and monitoring the concrete temperature by using Thermocouples of 3.5m deep raft foundations.
e) Manage the site lab for designing and testing of concrete.
f) Monitor the activities of higher independent Lab.
QA/QC Manager
Project: - Construction of Steel Mill for AMRELI STEEL at Dhabajee near Karachi-Pakistan
a) Quality Management
b) Prepare and implement the internal audit program.
c) Co-ordinate with Consultant (located abroad) for quality related conflicts.
d) Establish the quality control procedures and Method Statements
QA/QC Manager
Project: - Lusail Development - Marina, Earthworks and site preparation
Quality management for the construction of precast blocks without reinforcement having weight up to 65ton, each for 35kM long Marina Quay wall-quantity of concrete used approximately-220, 000m3 of 30MPa
a) Implementation of the quality procedures.
b) Monitor and control the heat of hydration by using thermocouples.
c) Monitor the site and independent lab activities for quality control.
d) Prepare and establish the Method statements, Project quality plan, ITPs
QA/QC Manager
Project: - Taunsa Barrage Emergency Rehabilitation and Modernizing Project. (Project funded by WORLD BANK.)
a) Quality Management for the all civil activities.
b) Established the procedures for minimizing the “Field Memos” and NCR(s).
c) To prepare ITP’S and Procedures and Method Statements.
d) Review quality plans and MS
e) Conduct Inter audits and maintain quality reports+ inspections+ ITPs
f) implement the internal audit program+ Reporting
Project: - SAUDI ARAMCO’s INSPECTION DEPARTMENT APIU (Abqiaq Project Inspection Unit)
Implement QA plan, ITP’s and Procedures for the following activities.
a) Blast proof buildings for GOSPs, Oil Flow lines, WIPs (water injection plants)
b) Precast Residential and Industrial Buildings including all faculties.
c) Construction of ABQAIQ AIR STRIP.
d) Follow Saudi Aramco Engineering Standard, Schedule “Q”
e) Using SAP (SYSTEM APPLICATION PROGRAM)
f) Preparation of “PQI” (Project quality index) for each project on monthly basis.
g) Attend the PROGRESS, QUALITY and Safety meetings
QA/QC + Civil Engineer
Implantation of the QA Plans, ITP’s+ Procedures, for
a) O/H- T /Tower Lines, S/Station 380/230kV+ pile line works.
b) 4x50 MW + 100x3 MW Gas Turbine Power Plants.
c) SVC building (Static VAR Compensation) at generation side.
d) 230kV Under Ground LPOF cable (low pressure oil filled cable)
a) Construction and supervision of, Rising Mains for different schemes.
b) Construction of disposal Projects.
c) Construction and supervision of Sewer Lines,
d) Construction of Water Supply Projects,
e) Construction of residential & Non-Residential Buildings.
a) Construction of precast Residential buildings and 350 precast villas for “Prince Sultan Military Housing Project” Al-Kharj KSA
b) Topographic Survey works for Improvement and Beatifications of ABHA Streets
c) Construction and Supervision + SURVEY of Sewage Disposal Plant
d) Plotting of survey maps
e) To prepare procedure for survey field staff.
f) TO maintain the quality records.
a) Residential & Non-Residential buildings.
b) Overhead & U/G Water Reservoirs.
c) Earth Works, Survey for 132kV H/T Transmission Lines and Sub-Stations.
d) Foundations of 4x50 MW Gas Turbines Power Plants.
e) Construction of 55 ft long PRECAST P.C.C Poles for 132 and 66 kV H/T Lines
I hvae done BSc(hons) (che) Civil Engineering, and have research in”Behavior of Recycled aggregate with freshly and hardened concrete”
I completed 03 years “Diploma of Associate Engineer” in civil engineering from Sindh technical board Karachi Pakistan in 1978.