Control Technologist Electrical
BRUCE POWER NUCLEAR GENERATING STATION
Total years of experience :26 years, 9 Months
Cooperated with CCTV crew to ensure optimal functionality of CCTV network and all cameras. Oversaw the function of software and updates. Ensured compliance with safety regulations. Supported outage crew in installing new cameras in the vault.
Played a key role in the upgrade of transformer stations for Ontario’s largest energy transmission and distribution service provider. Tested transformers and upgraded power control panels; built new control panels based on blueprints. Constructed transformers, lightning spikes, reactors, and other equipment and components. Connected power and control cables; grounded grids and fences using compressing & CAD welding techniques. Ensured compliance with all safety precautions including limits of approach.
Cooperated with OMS crew to ensure optimal functionality of MCC, 600-volt and 4-kV breakers. Oversaw 13.8 BUS maintenance. Ensured compliance with safety regulations. Supported outage crew in installing 600-volt breakers and GTDs.
Cooperated with the static crew to complete daily scheduled and unit shutdown work. Conducted backer testing of breakers and motors. Maintained breaker swaps; managed BUS and MCC outages. Maintained and replaced batteries. Cooperated with the cable-pulling crew to pull temporary jumpers and terminations. Complied with all safety regulations.
Pulled temporary jumpers and terminations as part of the cable pulling crew. Supported outage crew in installing 600-volt breakers and GTDs. Complied with all safety precautions and lockout / tag-out procedures.
Worked with main shop crew in unit “0” for outage support in reactor vault temporary lighting
And cable terminations and take all safety precautions & requirements with lockout & tag out procedure. Also worked to support outage crew for the day to day schedule work and unit shut down work
Worked with main shop crew in unit “0” for outage support in reactor vault temporary lighting
And cable terminations and take all safety precautions & requirements with lockout & tag out procedure. Also worked to support outage crew for the day to day schedule work and unit shut down work
Upgraded transformer stations as a member of the construction crew; cooperated with P&C engineers to test transformers and upgrade power control panels. Built panels based on blueprints; set up and installed transformers, lightning spikes, and other equipment. Connected control and power cables with transformers and control panels. Grounded grids and fences using CAD welding. Merged and tested cables and breakers. Ensured compliance with safety precautions.
Cooperated with the 4KV breaker team to overhaul, test and maintain Schneider breakers and cells. Installed 600-volt lights on coal silo; repaired wiring for lighting towers. Complied with safety regulations and lockout / tag-out procedures.
Installed, commissioned and tested, motors control system using VFDs,
transformers and electrical panels in electrical distribution room
roughed-in for the commercial projects with the help of blueprints
Installed fire alarm systems in residential and commercial projects
Drafted, analyzed and modified drawings of electrical control and power diagrams
Provided electrical schematics and lamicoid tags to the CIMCO panel shop in accordance
with strict production requirements
Programmed and operated CNC machine to manufacture lamicoid tags for panel shop
Worked with engineers to test the newly built panels
Programmed and configured (inputs/outputs) of new PLC
Installed generators, transformers and electrical panels in electrical distribution room
Setup of boiler rooms in high-rise building with the help of blueprints
Installed fire alarm systems in residential and commercial projects
Experience using Ontario Electrical Safety Code Book
Updated service, roughed-in, ran EMT and finished piping work
Performed maintenance on electrical work for residential and commercial projects
Serviced and maintained laser and lathe machines
Responsible for minimizing electrical stoppages by implementing preventative maintenance in production system, grid station, switchgear for high and medium voltage applications and control panels.
Carried out troubleshooting of electrical problems in production system.
Installed, commissioned and tested, motors, transformers D.C drives. PLC (programmable logic control) systems (SIEMENS, S5100U, 115U) - (AEG, Modicon).
Worked on D.C control and 132 KV and 11 KV distribution system, switchgears, pressure switches, transmitters, level sensors, flow sensors, speed control panels, current transformer and potential transformers.
Installed and calibrated different instruments, (like gauges, weighing machines etc)
Worked on high voltage, medium voltage and low voltage.
Member of a team, worked on Quality Assurance system ISO-9002, documented standard operating procedures.
Used CAD to design drawings for plant updates in electrical circuits and plant layouts for line 2
Supervised installation, commissioning and testing of power panels and PLC (Programmable Logic Control) panels, Textile machinery, generators, cable lying and termination of cables on project.
Tested electrical apparatus, fixtures control equipment.
Minimized Electrical stoppages by implementing preventative maintenance, trouble shooting of Programmable Logic Control system and electrical control circuits.