Shift Engineer
Nestle Pakistan Ltd
Total years of experience :15 years, 0 Months
Managing the Maintenance and improvement in the Dairy and Juice Processing Plant.
Maintenance Shift Leader of the Tetra Pak machines.
Coordinating the safety procedures and improvement ideas implementation.
Food safety team member.
Audit coordinator from Engineer side.
Improvement project implementor.
Behavioural based compliance implementation team member.
Coordinating overhauling project of Center 1
Coordinating Preventive Maintenance and Corrective Maintenance of Gensets
Handling HO/TO of sites
Site audits.
Troubleshooting.
I Was Deployed in CNC; GRP and MPP section of the Aircraft manufacturing factory and was given a process selection project for a Mirage Diode Box. I also have given a Debriefing to PAC Director Technical, and a formal report and presentation to the faculty members of Mechanical Engineering in GIKI
I learned and produced production drawings in AutoCAD/Mechanical Desktop. My main objective was to design, Fabricate and integrate dumping and conveyer mechanisms. I also documented my working and presented results to CEO and Managers of the Company
Studied, and observed the machinery installed in the field, and field working principles, Documented the observations and submitted a comprehensive report to the operation manager of the field.
My CGPA was 2.80 and I have done three industrial internships in the area of designing, oil and gas, and aviation through which i have gained a great deal of knowledge in the respected areas