Hvac Bim Modeler
Pace Architecture Engineering + Planning
Total years of experience :11 years, 8 Months
• Attending Bim Workshop meetings & Visit to Site for variations between drawings & Site.
• Worked Bim Projects on LOD 300, 400 & 500
• Creating walk through path in Revit.
• Clash checking both in Revit Interface & Navis Manage.
• Create Viewpoints & comments in Navisworks.
• Can Independently Model Chilled water & Air Cooled Plant rooms
• With complete valve package detail.
• Transfer projects standards, Copy Monitor, Creating Floor Plans.
• Create shared parameters.
Creating Work sets, as per disciplines, creating Templates & sheets.
Creating sub disciplines from the filters.
Developing 3D Models and annotation from Design 2D Drawings.
Creating and developing Revit Basic families.
Developing mep coordination models and sections.
Quantity takeoff by using Revit schedules & Navis
Preparing Spaces, Placing Spaces, Zone Color Scheme
Schedules.
Producing Sprinkler Design Schedules.
Making Changes in Architectural & structural Revit Model as per Site
Conditions.
Preparing IFC drawing to Shop Level drawing
Preparation of Hvac shop, design & Detail dwgs. As per ashrae and
smacna
Duct sizing as per constant friction & Velocity reduction method
Mcquay Software
Chilled water pipe selection by using Mcquay Software
Selection of Air Terminals
Hvac Duct & Chilled water Routing and Location of Out lets.
Preparing shop drawing for Chiller plant room & cooling tower details
drawings.
Developing single line into Double line duct routing.
Preparation of Schematic Diagrams and Riser Diagrams.
Preparing Mep Coordination Drawings without clash free both in
AutoCAD & Revit.
Hvac Revit Modeling.
Preparing the schedules.
False ceiling co-ordination (Electrical lights, diffusers &sprinklers)
Preparing builders work dwgs (Slab openings, core wall openings, wall
openings.
Preparing Shaft Co-ordination of MEP services.
Raising RFI's based on Specification and Design Drawing.
Preparing as built dwgs of Hvac, drainage, water supply and
firefighting services.
Taking Approvals from Consultant Office
Preparing shop drawing for Chiller plant room & Cooling tower details
drawings
Preparing Final As Built Drawings as per site conditions and Markups
False ceiling coordination within MEP services
Site Visits to ensure design cross check
1. SUCCESSFULLY COMPLETED PRACTICALS WITH GOOD PERCENTAGE. 2. SUBMITTED PROJECT WORK AS PER GIVEN BY LECTURERS.