ليوناردو كابالفين, QA/QC  ENGINEER

ليوناردو كابالفين

QA/QC ENGINEER

PETROFAC BERANTAI FPSO project, MALAYSIA Company; DPS (BRISTOL) PTE. LTD

البلد
الفلبين
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
18 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 1 أشهر

QA/QC ENGINEER في PETROFAC BERANTAI FPSO project, MALAYSIA Company; DPS (BRISTOL) PTE. LTD
  • سنغافورة
  • أغسطس 2011 إلى أغسطس 2011

Review of PDS model for discipline clashing, obstruction and design deviation s.
•Field survey of existing pipe line and structures do draft detail, material identification and feed to designer /drafter for PDS modeling.
•Field survey of primary, secondary and tertiary structures for finalization of PDS Model.
•Field survey and draft detail of miscellaneous structures for mooring, equipment foundation, escape routes/access platforms, stairs, special pipe supports, etc.
•Field survey of piping, and structural, electrical & instruments clashing do draft detail for proposed solution to amend PDS Model.
•Field survey and drat detail of structural supports of mechanical equipment, piping, electrical & instruments for PDS modelling.
•Field survey of tie-in works of piping for x-y-z coordinates.
•Provide recommend solution to lead designer for field design problems and other associated engineering matters.
•Monitor topside modules construction / integration.

LEAD INSPECTOR ( CLIENT ) for BUMI ARMADA TGT FPSO Project, Vietnam
PRODUCTION CAPACITY : 55, 000 bbl per day; Company: HOANG - LONG Joint Operating Company of Vietnam, Singapore;

QA في NES Global Pte. Ltd
  • سنغافورة
  • ديسمبر 2010 إلى يونيو 2011

Read, knowledge and understanding of project contracts and technical specifications.
•Review, verify of engineering drawings plan, detail, lay-out, section, P & ID’s, and isometrics during execution.
•Review, verify and comment of contractor TGT modules fabrication Inspection & Test Plan.
•Review, verify and comment of contractor’s, work plans, method statements,

QA في NORCE OFFSHORE PTE. Ltd
  • الإمارات العربية المتحدة
  • يوليو 2010 إلى نوفمبر 2010

Attend final walkthrough (tri-party) of systems and sub-systems completion..
•Verify and confirm systems, sub-systems completion of each MC Dossier.
•Prepare, issue and close out punchlist for the systems, sub-systems walkthrough.
Make sure all ITR’s are accomplished, signed-off by the respective responsible personnel and filed according to system, sub-system requirements
Incorporate additional mechanical, electrical and instrument equipment tag no’s in the PIMs as per the system and sub-system requirements.
Issuance of ITRA’s to contractors for execution and completion.
•Review, verify of engineering drawings, P & ID’s, isometrics, single line and block diagram, other relevant documents for as-built.
•Propose recommend corrective actions for non-conforming items/parts and structures.
•Progress reporting and update of systems, sub-systems completion.
•Attend MC meeting with contractor and discipline engineers.

LEAD STRUCTURAL / PIPING SUPERVISOR ( OWNER ) for MG HULME SEMI-SUB RIG PLATFORM UPGRADING PROJECT, Gulf of Mexico; Company

Supervision في TRANSOCEAN OFFSHORE DEEPWATER DRILLING Ltd
  • سنغافورة
  • يناير 2010 إلى يونيو 2010

monitoring of contractor’s scope of works for MG Hulme upgrading project, i.e. :
•Structural removal, repair and renewal for rig main deck plate and under deck structures, sub-structures, upper deck and, living quarter, pontoon deck, hull and caisson columns, deck flats.
•Piping lines removal and renewal for compressed air, dry bulk, cooling water, drains, low, high pressure mud, potable water, fire water, fuel oil, diesel, etc.
•Fabrication of pipe lines and final installation assembly to modules / equipment.
•Pressure testing, lube oil flushing and leak test of pipe line system.
•Review monitor progress schedules for structural / piping works.
•Coordinate with inspectors for NDT works of structural and piping welding works.
•Preparation of variation order
•Survey for existing pipes and structures, sub-structures for
repair and renewal.
•Preparation of bill of materials for variation order of structural and pipe line repair / renewal.
•Progress reporting and documentation.
• Attend weekly progress meeting.


MULTI-DISCIPLINE INSPECTOR-OWNER (PIPING/ MECHANICAL / STRUCTURAL / WELDING) for MONTARA FIELD DEVELOPMENT FPSO Project, Australia PRODUCTION CAPACITY : 80, 000 bbl per day; Company

QA في TANKER PACIFIC OFFSHORE TERMINALS Pte. Ltd. Singapore
  • سنغافورة
  • يوليو 2008 إلى ديسمبر 2009

Attend monitor inspection schedules for multi discipline.
•Monitor piping fabrication and final installation and assembly to modules and equipment.
•Witness system pressure test, leak test, chemical cleaning and lube oil flushing of pipe line system.
•Verify accuracy and completeness of contractor’s hydrotest packs and that all testing procedures have been approved and arc on site.
•Confirm testing parameters are duly recorded and testing equipment are calibrated.
•Verify all the work is built in accordance with the design and approved drawings
•Attend tri-party walk down for systems, sub-systems mechanical completion.
•Prepare and release walk down systems, sub-systems pre-commissioning punchlist.
•Verify and close-out pre-commissioning punchlist.
•Inspection of mechanical equipment installation. rotating / static, for orientation, elevation, axial and radial alignment and tank internals up to final box up.
•Inspection of steel structural fabrication, installation topside modules.
•Review, verify and counter sign NDT reports / results for structural and piping welding works.
•Review MC dossier for topside modules prior handover to commissioning.
•Review and sign-off ITR’s for piping, structural and, equipment.
•Preparation of piping test packages, implementation, and execution for additional pipe line modification as per site instruction ( SI ) TPOT internal job.

•OTHERS : Designated as

PIPING ENGINEER في Scanrise Pte. Ltd
  • سنغافورة
  • سبتمبر 2007 إلى مايو 2008

Preparation of MC package per systems & sub-systems using boundary marked-up P & ID’s, cable schedule, single line, block diagrams, and other related documents as required in the project contract.
•Knowledge of PIMS-CMS
•Importation of all equipment, electrical and instruments tag nos to PIMS / CMS based on mechanical equipment tags/list, cable schedules, single line and block diagrams, P & ID’s and other related documents,
•Make sure all ITR’s are accomplished, signed-off by the respective responsible personnel and filed according to system, sub-system requirements.
•Attend MC coordination meeting with engineers, contractors, discuss outstanding ITR’S, MCCR, etc. for MC package, follow-up & control.
•Provide information / assist construction regarding outstanding piping works & E/I ITR’s, etc. according to priority system, sub-systems,
•Review piping test packages per P & ID marked-up systems and sub-systems boundary limit.
•Review engineering dwgs, P & ID’s, isometrics, single line and block diagram for as-built.
•Coordination with discipline engineers for systems, sub-systems completion.
•Control MC Dossier, DAC, CAC for commissioning hand-over.

FIELD

Supervision في SEA PRODUCTION PTE. Ltd
  • سنغافورة
  • مارس 2007 إلى أغسطس 2007

Integration / conversion works.

FIELD SUPERVISOR في for SAXI FPSO Project, KIZOMBA EXXON MOBILE, Company: SBM ( SINGLE BOUY MOORING ) PTE. LTD
  • سنغافورة
  • نوفمبر 2006 إلى مارس 2007

Demolition, conversion works
•Supervision, monitoring of demolition / dismantling of existing structural members, and outfitting at main deck and at engine room according to marked-up dwgs, and SBM conversion works and specifications.
•Supervision monitoring of cutting of ship bow for external turret installation.
•Supevision monitoring for removal and renewal of ship longitudinal stiffeners, bulkhead, stringer and scantling,
•Supervision monitoring of steel structure fabrication for frame assembly topside modules, deck plating, crane deck support and miscellaneous items and appurtenances.
•Mark up of existing steel structures, and equipment foundations for dismantling / demolition.
•Monitor daily, weekly, monthly progress of steel structural fabrication and final assembly of topside modules.
•Verify/attend inspection schedule for structural steel works.
•Prepare daily and weekly progress status of steel structure demolition and fabrication works .
•Attend VSCC meeting for safety and daily progress of demolition and steel fabrication works.

QA / QC ENGINEER for MARLIM LESTE FIELD DEVELOPMENT Project ( PETROBRAS FPSO P-53 PROJECT ); Company

في CDC-PETROBRAS PTE. LTD. Singapore
  • مايو 2006 إلى أغسطس 2006

Inspection of pre-fabricated beams and assembly of Gas Treatment & Oil Separation

STRUCTURAL SUPERVISOR في Modules P01
  • سنغافورة
  • مارس 2005 إلى ديسمبر 2005

of fit-up at shop and final assembly of modules according to WPS and design drawings..
•Inspection of piping fabrication and final installation assembly to module / equipment.
•Check /witness piping test package for pressure test according to required specified test requirement.
•Witness / check dimensional of modules frame assembly prior release to full welding.
•Final / visual inspection of welds.
•Review Radiographic film results ( RT) of welders and components .
•Witness welders qualification test and performance.
•Review WPS ( Welding Procedure Specifications ) according to ASME IX, AWS and related project technical specifications.,
•Monitor weekly welders performance.
• Attend coordination meeting for progress and quality matters.
•Control / issuance of Non-Conformance Report ( NCR ).

FIELD

QA / QC ENGINEER في TPG 258 SHAH DENIZ GAS EXPLORATION FPSO Project, BAKU, AZEIRBAJAN; Company: BP PTE. LTD. , Singapore Company: BP PTE. LTD
  • سنغافورة
  • أكتوبر 2004 إلى فبراير 2005

Inspection for pre-fabrication and assembly / construction of several modules ( north, south, & center block ) topside, support manifold,
•Inspection of fit-up at shop and final assembly of modules.
•Witness / check dimensional of module frame assembly prior release to full welding.
•Inspection of piping fabrication and final installation assembly to modules / equipment.
•Final / visual inspection of welds. Review weld radiographic film results ( RT ).
•Preparation of reports, Up date Weld Control Summary Sheet ( WCS ), Attend coordination meeting with sub-contractors and production for construction and quality matters.
•Inspection of pipe line system per test package, preparation / issuance of punch list.
•Witness system pressure test, reinstatement of the pipe line system.

QA / QC ENGINEER For FPSO P-50 Project, PETROBRAS, BRAZIL; Company

QA في PETROBRAS PTE; LTD
  • سنغافورة
  • فبراير 2004 إلى سبتمبر 2004

Inspection of Hull Bottom plates, stringer, Bulkhead and Horizontal girder Lower riser support, Upper riser support, Main deck, Hawser winch seats, Diving Platform, Engine Room, Flare Structure and. Helideck.
•Inspection of piping fabrication and final installation assembly to modules / equipment.
•Final / visual inspection of welds and review radiographic film ( RT ) .
•Document review, preparation of

QC في HYOJONG INDUSTRIAL CO. LTD. AL-KHOR
  • قطر
  • أبريل 2003 إلى نوفمبر 2003

Perform

WELDING INSPECTOR في for Q-CHEM PLANT PROJECT ( QATAR CHEMICALS )
  • قطر
  • سبتمبر 2001 إلى ديسمبر 2002

Monitor / inspect contractor’s piping installation and welding works according to project requirement, codes / specifications.
•Check fit-up of pipes, bevel, welding consumables, interpass temperature, pre-heating, purging, welding process as per approved welding procedure specifications.
•Check welders and their qualification records. Check / verify pipe and fittings, spool tag/identification at shop, materials, size, thickness, type, classification and rating as per approved isometric drawings and bill of materials.
•Verify / confirm completion of pipe line system as per isometric / P & ID drawings, punch list of each system test package prior release to pressure test.
•Verify / confirm re-instatement of the pipe line system after pressure test. Witness pressure test of the system ( hydrostatic / pneumatic )
•Weld Radiographic film review ( RT ) .
•Check / review Welding Control Sheet Summary.
•Verify / confirm completion of commissioning final walkdown punch list for project start-up safety review.
•Assist commissioning in system leak check and dry-out procedure. Check oxygen free / inerting of the system..

SR. QA / QC ENGINEER for AR-RAZI II EXPANSION PROJECT ( Saudi Methanol Plant ) 1990, HADEED STEEL PLANT EXPANSION PROJECT 1991, RABIGH STEAM POWER PLANT EXPANSION-BOILER INSTALL’TN 1992, IBN ZAHR POLYPROPYLENE PROJECT 1993, PETROKEMYA POLYSTYRENE PROJECT 1994,
PETROKEMYA BUTENE PROJECT 1994, BHP-SABAYEK FERRO ALLOY

QA
  • المملكة العربية السعودية
  • يناير 1995 إلى يناير 1996

1997, UTHMANIYAH GAS PLANT 1998; Company: MS AL-SUWAIDI,

Supervision في PNOC DOCKYARD & ENGINEERING CORPORATION
  • الفلبين
  • يوليو 1989 إلى سبتمبر 1989

Responsible in the preparation of WPS, PQR required on the project.
•Witness preparation of welders testing and welders work performance during qualification test.
•Responsible for supervision and control of welding works in fabrication at shop and final assembly of 5 units Fuel Barge & 5 units Power Barge.

QA / QC ENGINEER في NDT
  • الأردن
  • مايو 1985 إلى مايو 1988

Perform material receiving inspection.
•Inspection of piping fabrication, installation and testing.
•Inspection of steel structural fabrication and erection.
•Check peaking, bonding of tanks vertical and horizontal welds before and after welding..
•Inspection of mechanical equipment installation, orientation elevation radial and axial rotation.
•Welding inspection
•Witness welders performance qualification test.
•Review WPS, PQR for compliance to requirement specified in the ASME sec. IX, AWS and other relevant project technical specifications.
• Monitor, review and verify welders performance and welders qualifications test record.
•Witness pressure test of pipe lines.
•Witnness pressure test of tanks.
•Witness

QA / QC ENGINEER في MINA AHMADI REFINERY , State of Kuwait; Company: T.K.K. JAPAN GAS CORPORATION ( JGC )
  • الإمارات العربية المتحدة
  • مارس 1984 إلى مارس 1985

Perform material receiving inspection.
•Inspection of tank assembly / erection.
•Check foundation levelness / elevation.
•Check tank plumbness, levelness, peaking and bonding .
•Welding inspection of bottom plate, horizontal and vertical joints welding of shell plates, etc.
•Witness vacuum box test for bottom plates, pontoon deck, roof deck plates, etc
•Witness tank pressure test.
•Identification of radiographic test result of weld joints for repair.
•Documentation, reporting.

QA في Bataan Philippines; Company: ENGINEERING EQUIPMENT INC. ( EEI )
  • الفلبين
  • أبريل 1983 إلى ديسمبر 1983

Strict implementation of Quality Control Procedures /

في ENGINEERING EQUIPMENT INC. ( EEI )
  • الفلبين
  • مايو 1980 إلى مارس 1983

Preparation of Inspection & Test Plan as per project technical specifications, project schedule, codes and standard.
•Inspection of piping installation, steel structural installation.
•Check levelness / plumbness of structural column as per ITP, and project requirement, specifications.
•Visual inspection of mechanical equipment installation rotating and static per Inspection & Test Plan.
•Check orientation / elevation, level plates, check anchor bolts sliding and fixed. Witness / check initial and final alignment of pump radial & axial.
•Check grouting procedure, preparation, type and curing. Check tray installation and tank / vessel appurtenances, and final box up.
•Monitor / check equipment preservation..
•Welding inspection.
•Witness NDT examination for steel structure and piping installation.
•Check / visual inspection of pipe fit-up at shop and final installation. Pipe line check per test packages.
•Check utilization of welding consumables, safekeeping and control,
•Check / witness pressure test. Review RT films and documentation.

  • إلى

Project execution, supervision, inspection, testing, mechanical completion coordination, certification and, validation of mechanical equipment installation rotating and static, structural, welding, piping and piping components, review and comment of vendors works packages, engineering plans/dwgs, provide technical input to engineering for inspection and testing requirements, preparation of QA / QC procedures, Method Statements, Welding Procedure Specifications, Inspection and Test Plan, Test Packages, Turnover Packages, Document Control, Issuance and control of Non-Conformance Report, knowledge of NDT’s examination, Preparation / issuance of pre-commissioning punch list, vendors and projects audit and surveillance, isometrics, P & ID, single line, block diagrams as built, completion / close-out of pre-start up commissioning punch list, system pressure leak test, dry out and, inerting.

في Metalcare Group Services Inc
  • كندا
  • إلى

Hired by the company as QA / QC SPECIALIST (January 11, 2014 up to November 27, 2015) and Assigned to Client Syncrude for SYNCRUDE MAJOR PROJECT EXECUTION, (January15, 2014 up to November 27, 2015) Company/

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في University of the Eas
  • ديسمبر 1979

Specialties & Skills

CUSTOMER RELATIONS
DOCUMENTATION
ENGINEERING
MATERIALS MANAGEMENT
MECHANICAL
MICROSOFT WORKS
OIL PAINTING
PROGRESS