Planning Engineer
Ashbelya Consulting Engineers
Total years of experience :17 years, 11 Months
Review weekly and monthly progress update on the project schedule, lookaheads, progress curves, manpower & equipment histograms, material logs and daily activity summary
Review working schedule & recommend recovery plan or schedule revisions to keep the project back on track
Review & analysis of contractual claims submitted by the contractor, such as extension of time and request for relief claims
Prepare independent studies on submitted contractual claims such as delay analysis and forensic planning
Prepares detailed report on the final determinations of contractual claims
Develops shutdown schedule based on justified work list for planned & emergency shutdowns using Primavera 6.0
Detailed input of shutdown activities in P6 using basic work packs which includes detailed resource man-hours and project codes
Facilitates work list selections sessions with different disciplines to accurately justify and mitigate shutdown jobs by using MMS systems (SAP & Meridian)
Control, coordinates and updates shutdown work list on shutdown & turnaround activities for onshore & offshore facilities
Develops De-Commissioning & Commissioning plan with Operations
Prepares, coordinates and updates list of shutdown deliverables for all stake holders
Identification of critical & near critical activities
Performs resource levelling & optimization
Prepares resource profiles & histograms
Performs earned value analysis
Coordinate with other planners to develop Integrated Master Schedule by performing lean thinking, job safety analysis, risk analysis, crane/clash reviews & SIMOPS reviews
Prepares daily, weekly & monthly progress updates during shutdowns
Prepares & updates Look-ahead, S-curves, Variance Report to all stakeholders
Facilitates pre-startup safety reviews and prepare list of punch items for close-out & commissioning
Develops project schedule for FEED & Construction Phase using Primavera 6.0
Detailed input of resources and project codes into project schedule
Performs resource levelling and optimization
Develops & updates resource histograms for manpower, equipment & material requirements
Monitor progress & coordinates essential deliverables for the project
Review project schedule’s integrity and propose changes based on project scope of works
Identify critical and near critical activities and other potential delays for the project
Monitor project progress using earned value analysis
Prepares weekly & monthly progress reports including progress statistics and trends using progress curves, updated histograms and lookaheads
Prepare & proposes strategic plans to different disciplines to bring the schedule back on track
Performs forensic planning to evaluate project claims
Prepares and updates project schedule using PRIMAVERA 6.0
Performs resource levelling and optimization
Performs earned value analysis
Prepares labor, equipment & material histograms
Prepares progress presentations and statistics for monthly Joint Venture meeting
Prepares and update weekly & monthly progress reports using progress curves, updated histograms and lookaheads
Timely review of project progress statistics and trend
Verify actual project progress on site with site engineer and site supervisor
Prepares recovery schedule and contingency plans
Analysis on different scope changes & impact on the schedule’s duration, resources & cost
Analyzes critical and near critical activities to identify impact & delays to the schedule
Prepares and updates project schedule using PRIMAVERA 6.0
Monitors and updates daily accomplishments, manpower and man-hours used for project
Prepares and updates Direct and Indirect Manpower Schedule, Progress Evaluation Summary and Overall Schedule
Prepare and update Weekly Progress Report Status (Fabrication, Erection Works, Masonry Works, Electrical Works and Mechanical Works) and Overall “S ”Curve
Monitor and updates Engineering Progress / Drawing status.
Keep informed to overall project’s start and closing statistics
Coordinates with Procurement / Material Management for Free Issue Supply and company’s Supply Material Status.
Coordinate quality and project completion schedules
Prepare Project Schedule and observe lead-time in preparing logistic of a project
Prepare and update project’s assigned discipline schedule and progress
Prepare a week forecast schedule and progress (Productivity, Man-hours, Drawing Status and Checklist)
Implementing simplified construction method and methodologies
Quality control and inspection
Paper works and other related documents for the construction
Maintain knowledge of safety policies and procedures and perform assigned duties in safe manner
Monitor and update daily manpower and man-hours used for the project
Prepare and update Direct and Indirect Manpower Schedule, Progress Evaluation Summary and Overall Schedule
Coordinate with Material Purchasing/Procurement Division with materials availability status
Bachelor Of Science In Civil Engineering