Total Years of Experience: 22 Years, 8 Months
December 2012
To Present
Sr.Mechanical Engineer , MScENG.
at Burns&McDonnell consultants
Location :
Qatar - Doha
-Review Contractors Shop Drawings & Material Submittals.
-Lead Mechanical Engineer in charge of site supervision and coordination.
Projects:-
1-Msheireb Downtown Doha (Phase 1C):
-Lead Mechanical Engineer in charge of site supervision and coordination.
Projects:-
1-Msheireb Downtown Doha (Phase 1C):
March 2010
To December 2012
Senior Mechanical Design Engineer
at EGEC (Egyptian Group for Engineering Consultation)
Location :
Egypt - Cairo
• Prepare and study designs and specifications related to mechanical engineering specifically HVAC or Plumping systems.
•computation, in the preparation of preliminary and final designs.
•Review final plans, specifications, special conditions and agreements, prior submission to the client.
•computation, in the preparation of preliminary and final designs.
•Review final plans, specifications, special conditions and agreements, prior submission to the client.
January 2008
To March 2010
Technical Office Engineer
at Saudi Bin Laden Group (PBAD), Jeddah
Location :
Saudi Arabia
•Design HVAC works.
•Preparing HVAC and Coordination shop drawings .
•Preparing all required calculations (Heat load estimation, external static pressure head calc, Pump head calc…..)
Projects:-
1- King Abdul Aziz Endowment for Makkah Holy Haram(District Cooling System)
2- King Abdul Allah economic city (Bay La Sun)
•Preparing HVAC and Coordination shop drawings .
•Preparing all required calculations (Heat load estimation, external static pressure head calc, Pump head calc…..)
Projects:-
1- King Abdul Aziz Endowment for Makkah Holy Haram(District Cooling System)
2- King Abdul Allah economic city (Bay La Sun)
April 2005
To December 2007
Project Engineer
at R.SANABEL (Electro. Mech. cont. Co), Al Riyadh
Location :
Saudi Arabia
•Design HVAC& Plumping and Fire Fighting works.
•Preparing HVAC & Plumping & Fire fighting and Coordination shop drawings
•Supervise and execute Central Air Condition & plumping& Fire fighting Works.
•Preparing materials submittals& purchasing orders& time schedules& Resource and Cost analysis .
Projects:-
1-Al-Othaim Mall, Al-Dmmam
2-Al-Othaim Mall, Al-Qaseem .
3- Al-Hoshan palace.
4- Al-Othaim Mall Rabwa
•Preparing HVAC & Plumping & Fire fighting and Coordination shop drawings
•Supervise and execute Central Air Condition & plumping& Fire fighting Works.
•Preparing materials submittals& purchasing orders& time schedules& Resource and Cost analysis .
Projects:-
1-Al-Othaim Mall, Al-Dmmam
2-Al-Othaim Mall, Al-Qaseem .
3- Al-Hoshan palace.
4- Al-Othaim Mall Rabwa
September 2002
To April 2005
Mechanical Engineer
at Ministry of finance (Engineering Management).
Location :
Egypt
• Design and Supervise Mechanical Works
(Air Condition, Generators, pumps and elevators) for Ministry of finance’s Buildings.
Projects:-
1- Authority of Sales taxes (Shoubra branch)
2- Authority of Sales taxes (Raas ghareb branch)
3- Authority of Sales taxes (Swah branch)
4- Authority of Sales taxes (Tanta branch).
5- Authority of Sales taxes (Damnhor branch).
6- Authority of Sales taxes (Maghagha branch).
(Air Condition, Generators, pumps and elevators) for Ministry of finance’s Buildings.
Projects:-
1- Authority of Sales taxes (Shoubra branch)
2- Authority of Sales taxes (Raas ghareb branch)
3- Authority of Sales taxes (Swah branch)
4- Authority of Sales taxes (Tanta branch).
5- Authority of Sales taxes (Damnhor branch).
6- Authority of Sales taxes (Maghagha branch).