Total Years of Experience: 10 Years, 8 Months
February 2015
To Present
Mechanical Engineer
at KFA AL ARABIA
Location :
Saudi Arabia
Familiar with engineering drawings (p&id, isometrics, plot plan, PFD, GA), piping line classes and schedules.
Familiar with application of international standard for process piping like ANSI/ASME B 31.3A and ASTM specifications with basic knowledge of ASME B16.5, ASME B 16.9 etc.
Familiar with various piping material like stainless steel, alloy steel, carbon steel etc.
Responsible in assuring all pipeline systems in accordance with the specifications, correct routing of lines as per isometrics and p&id.
Ability to do mark-ups & resolving tasks for S.C.R(shop change requirements) and F.C.R(field change requirements).
Ensure work execution in compliance with safety requirements and permit system (con-fined space, welding, and work at height).
Coordinating with planning department on work progress.
Keeping the latest revision drawings updated at site. Project documentation works as per standards.
Plans, organize and executes fabrication and erection works in accordance with project schedule and erection sequencing.
Developing Pipe Routing and Layouts in AutoCAD
Generating Fabrication and Erection Drawings from 3d models.
Supervise fabrication and erection crews and assign manpower and equipment in accord-ance with priorities.
Coordinating with Superintendent and Construction Manager on work execution. Prepara-tion of daily progress report and forwarding to the planning department.
Coordinating with fabrication shop on spool delivery
Test pack preparation, gravity testing & pressure testing.
Monitoring the routing of piping, preparation, checking and review of as built drawing and getting approval from the client.
Estimating of material requirement after study of drawing and specification and generation of bill of materials for spools and fittings.
Perform the tasks of preparing compliance statement for the project specification
Handle responsibilities of preparing and submitting weekly working progress to the senior estimation engineer
Responsible for assisting estimation engineer in preparing technical and commercial bids
Handle as well as prepare a list of all costs that were incurred in the project like temporary facilities and other expenses
Perform other essential tasks under the instructions and guidelines of senior cost estimate engineer
Responsible in the supervision of fit-up, welding and erection of pipelines, in pipe racks, line tracking and handling punch list works, fabrication and erection of structures and erec-tion of equipment’s.
To conduct the hydro test of pipelines and erection of equipment’s.
Ensure the sequence of work by Civil, Steel structure, Equipment, Piping & Electrical de-partments.
Make sure the client requirement as per the priority system.
Preparation of weld map for site condition.
To carry out re-instatement of piping and report preparation for installation of valves, re-move temporary valve, gasket etc.
Ensure all method of statements and procedures, installation manuals and ITP’s comply with the project specifications.
Planning and checking of work progress and schedules to meet the deadlines/target dates.
Coordinating with quality control departments for quality approval and representing matters with the client.
Familiar with application of international standard for process piping like ANSI/ASME B 31.3A and ASTM specifications with basic knowledge of ASME B16.5, ASME B 16.9 etc.
Familiar with various piping material like stainless steel, alloy steel, carbon steel etc.
Responsible in assuring all pipeline systems in accordance with the specifications, correct routing of lines as per isometrics and p&id.
Ability to do mark-ups & resolving tasks for S.C.R(shop change requirements) and F.C.R(field change requirements).
Ensure work execution in compliance with safety requirements and permit system (con-fined space, welding, and work at height).
Coordinating with planning department on work progress.
Keeping the latest revision drawings updated at site. Project documentation works as per standards.
Plans, organize and executes fabrication and erection works in accordance with project schedule and erection sequencing.
Developing Pipe Routing and Layouts in AutoCAD
Generating Fabrication and Erection Drawings from 3d models.
Supervise fabrication and erection crews and assign manpower and equipment in accord-ance with priorities.
Coordinating with Superintendent and Construction Manager on work execution. Prepara-tion of daily progress report and forwarding to the planning department.
Coordinating with fabrication shop on spool delivery
Test pack preparation, gravity testing & pressure testing.
Monitoring the routing of piping, preparation, checking and review of as built drawing and getting approval from the client.
Estimating of material requirement after study of drawing and specification and generation of bill of materials for spools and fittings.
Perform the tasks of preparing compliance statement for the project specification
Handle responsibilities of preparing and submitting weekly working progress to the senior estimation engineer
Responsible for assisting estimation engineer in preparing technical and commercial bids
Handle as well as prepare a list of all costs that were incurred in the project like temporary facilities and other expenses
Perform other essential tasks under the instructions and guidelines of senior cost estimate engineer
Responsible in the supervision of fit-up, welding and erection of pipelines, in pipe racks, line tracking and handling punch list works, fabrication and erection of structures and erec-tion of equipment’s.
To conduct the hydro test of pipelines and erection of equipment’s.
Ensure the sequence of work by Civil, Steel structure, Equipment, Piping & Electrical de-partments.
Make sure the client requirement as per the priority system.
Preparation of weld map for site condition.
To carry out re-instatement of piping and report preparation for installation of valves, re-move temporary valve, gasket etc.
Ensure all method of statements and procedures, installation manuals and ITP’s comply with the project specifications.
Planning and checking of work progress and schedules to meet the deadlines/target dates.
Coordinating with quality control departments for quality approval and representing matters with the client.
September 2012
To March 2014
SITE ENGINEER
at BHARATH PETROLEUM COPERATION LIMITED
Location :
India - Kerala
Ensure work execution in compliance with safety requirements and permit system (confined space, welding, and work at height).
Coordinating with planning department on work progress.
Keeping the latest revision drawings updated at site. Project documentation works as per standards.
Plans, organize and executes fabrication and erection works in accordance with project schedule and erection sequencing.
Developing Pipe Routing and Layouts in AutoCAD
Generating Fabrication and Erection Drawings from 3d models
Estimating of material requirement after study of drawing and specification and generation of bill of materials for spools and fittings.
To conduct the hydro test of pipelines and erection of equipment’s.
Ensure the sequence of work by Civil, Steel structure, Equipment, Piping & Electrical departments.
Make sure the client requirement as per the priority system.
Preparation of weld map for site condition.
To carry out re-instatement of piping and report preparation for installation of valves, remove temporary valve, gasket etc.
Planning and checking of work progress and schedules to meet the deadlines/target dates.
Coordinating with quality control departments for quality approval and representing matters with the client
Coordinating with planning department on work progress.
Keeping the latest revision drawings updated at site. Project documentation works as per standards.
Plans, organize and executes fabrication and erection works in accordance with project schedule and erection sequencing.
Developing Pipe Routing and Layouts in AutoCAD
Generating Fabrication and Erection Drawings from 3d models
Estimating of material requirement after study of drawing and specification and generation of bill of materials for spools and fittings.
To conduct the hydro test of pipelines and erection of equipment’s.
Ensure the sequence of work by Civil, Steel structure, Equipment, Piping & Electrical departments.
Make sure the client requirement as per the priority system.
Preparation of weld map for site condition.
To carry out re-instatement of piping and report preparation for installation of valves, remove temporary valve, gasket etc.
Planning and checking of work progress and schedules to meet the deadlines/target dates.
Coordinating with quality control departments for quality approval and representing matters with the client
MECHANICAL ENGINEER
at MONARCH ENGINEERS AND CONSULTANCY
COMPANY: KFA AL ARABIA CONT. EST., YANBU AL BAHR, SAUDI ARABIA
Share on Facebook
Share on Twitter
Share Via Email