Lovinsky Soriano, Out Side Plant Construction Supervisor

Lovinsky Soriano

Out Side Plant Construction Supervisor

Ericsson

Location
Philippines
Education
High school or equivalent, Mechanical Engineering
Experience
23 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 2 Months

Out Side Plant Construction Supervisor at Ericsson
  • Egypt
  • My current job since August 2013

Site Implementation, supervision / monitoring of open trench excavation, directional boring construction, manhole /service box installation, outdoor /indoor cabinet installation, pipe /duct installation, concrete pouring and restoration.

Site Implementation of fiber optic cable blown installation, fiber termination and splicing, fiber testing and commissioning, fiber optic trouble shooting and fiber optic cable pulling/installation.

Engineering and survey, red line drawing, work change/site instruction preparation, documentation and quantity survey

Strictly Implement Safety and Quality of work as per OSP Telecom standard

Conduct Physical and Electrical Testing acceptance., Bill of quantities and Bill of materials preparation, Materials and equipment inspection .

OSP Field Quality Inspector at Norconsult Telematics Ltd
  • May 2012 to November 2012

Conduct physical acceptance test and electrical testing of fiber optic cable (FTTH and FTTM project), trouble shooting and strictly implementing safety and quality of workman shift at site.
Preparation of PAT documents, checking of all documents in a binder and preparation of weekly reports

Site inspection/supervision of cable installation, cable splicing/jointing, optical service box, optical terminal box, optical distribution box and other accessories of fiber optic cable, conduct optical testing from optical terminal box to fiber distribution terminal for fiber to the home project (FTTH)

Site inspection/supervision of civil works open trenching, base pad installation, manhole accessories installation, cement pouring, subduct installation, restoration, man hole installation and guard post installation- (FTTH-Telecom project)

OUT SIDE PLANT SUPERVISOR at KTK Fujikura Philippines ,Inc. A Telecommunication Engineering Company
  • December 2009 to January 2012

Supervision and inspection of underground and aerial cable construction at site, site acquisition /permitting on site, implement safety and quality of workmanship, trouble shooting and attend meeting to our clients Globe Telecom, Philippine Long Distance Telephone (PLDT), Smart Philippines, Digitel Company and Sun Cellular company.

Fiber testing and Copper testing of cables from cabinet to common main distribution facilities of a building

Engineering and site survey of Cable Entrance Facilities from Globe BTS, MSC, and BSC to main distribution facilities of a building under Globe Telecom

Site Implementation of Cable Entrance Facilities (CEF Construction) from Globe BTS, MSC and BSC to common main distribution facilities of a building under Globe Telecom project @ Greater Manila Area

Site implemented and completed PLDT project at DAVAO CITY \[NGN Conversion Davao City, Cable Segment and FXTH project \]- which the scope of works includes site acquisition/permitting, installation of base pad and cable clearing.

Bill of Quantities and Bill of Materials preparation
Quantity surveyor for installed materials preparation
Project Costing as per plan preparation and as built plan preparation

OSP SITE SUPERVISOR at Avecs Corporation
  • May 2007 to November 2009

1. Consequently responsible on site survey (staking).
2. Formulation of implementation schedule and manpower requirements.
3. Prepared all requirement quality record concerning actual implementation.
4. Determine necessary tools and equipment related to actual implementation.
5. Technical assistance to costumer representative during receiving inspection.
6. Ensure standard installation as per specification required by client.
7. Improve quality and safety installation at site all the time.
8. Conduct periodic meeting with subcontractor to solve site problems and issues which may occur during implementation.
9. Prepare Site Instruction, Red Line Drawing and Adjacent Lot Owner Consent (ALOC) which is pre-requisite prior to actual PAT (Physical Acceptance Test).
10. Evaluate test result (Physical and Electrical Test) derive from PAT (Physical Acceptance Test).
11. Perform corrective action on failed test derived from PAT (Physical Acceptance Test).
12. Consequently responsible in maintaining records related to project base on ISO 9001 principles.
13. Responsible in direct implementation for the installation of secondary and primary network.
14. Responsible in filling Daily Accomplishment Report, Progress Report and daily logbook.

Managed and Implement Fiber To The Home Globe Telecommunication project @ Serendra Tower 1, 2 and 3 Global City, Taguig City, Manila Philippines

OUT SIDE PLANT SUPERVISOR at COMSYS PHILIPPINES INC.
  • March 1996 to March 2001

Has actively participated completed the following project which the scope of works include installation of aerial and underground of primary and secondary network.
a. 100K ICC Bayantel  This turn key project aims to deliver Bayantel telephone line for the potential subscribers of Quezon City.
b. Smart Phase 1 Project  Under Smart-Ericson Project covering the Paranaque City and Alabang City, Philippines
c. Smart Fastract 11 Project  Under Smart-Ericson project covering the province of Pampanga, Bulacan, La Union, Baguio, and Laoag Ilocos Norte, Philippines
d. Smart Phase 11 Project covering the province of Nueva Ecija, town of Jaen, San Antonio, Cabiao, Gen. Tinio, Rizal, Bongabon and Gapan Nueva Ecija, Philippines
e. Globe 10K Fastrack Project  Covering the City of Mandaluyong, Philippines
f. Globe Phase 11  Covering the City of Marikina, Pasig and San Juan, Philippines
g. PLDT ZBP Project Tambo Exchange-Covering the City of Manila, Philippines
h. ICC Bayantel Lexus Project-Covering the City of Manila, Philippines
i. Globe Phase IV-On going construction of CEF (Cable Entrance Facilities) covering the city of Makati, Philippines
j. A smart ILAW Project-Covering the greater area of Manila in which the aim of this project is to provide the interconnection of each Smart Radio base Station to activate Smart GSM (Global System Mode) thru Digital System.

OSP SITE SUPERVISOR at SINTEL PHILIPPINES INC.
  • March 1994 to February 1996

JOB ACTIVITIES:

1. Underground cable pulling and cable installation  (PLDT) Philippine Long Distance Telephone project at Grace Park Caloocan City, Philippines
2. Underground cable pulling installation-Globe Phase II F/O cable Makati host Makati City, Philippines
3. Underground sub duct installation-PLDT project and Globe Phase II project Makati City, Philippines
4. Aerial cable construction under 100K ICC Bayantel project both secondary and primary cable greater Manila area Manila City, Philippines

Education

High school or equivalent, Mechanical Engineering
  • at Technological Institute of the Philippines
  • January 1996

* Graduated in college as a working student * Scholar of Dr.E.Quirino Foundation

High school or equivalent,
  • at Saint Philomene Academy
  • January 1988

* Graduated in college as a working student * Scholar of Dr.E.Quirino Foundation

Specialties & Skills

Engineering
Plan Implementation
QA QC Engineering
Defensive Driving
Engineering
Project Planning
Site Plans
Permit to Work
Site Acquisition
Fusion Splicing
Copper Cabling
Documentations
Supervisory Experience
lineman
Logistics
Quality Assurance
Quality Control
quantity surveyor
User Acceptance Testing
Personnel Supervision
Forecasting
civil works
Bill of Materials
bill of quantities
Dispatching
project implementation
Testing
Cabling
Rollout
Fiber Optics
Optical Fiber
Troubleshooting
Civil Engineering
Software Documentation
Transmission
Telecommunications
Supervisory Skills
Surveying
Staking
Right-of-Way Acquisition
Construction Management
Broadband
Computer Network Operations
Networking
Network Design

Languages

English
Intermediate
Tagalog
Expert