Lucas عازر, Project Manager

Lucas عازر

Project Manager

Fortna

البلد
الولايات المتحدة
التعليم
بكالوريوس, Building Construction: College of Architecture
الخبرات
9 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :9 years, 4 أشهر

Project Manager في Fortna
  • الولايات المتحدة
  • مارس 2014 إلى مارس 2017

* Oversaw several projects simultaneously (up to six at once), supervising project managers (PMs) on each project to maintain schedules and assist with adherence to company processes.
* Developed scheduling/reporting tool implemented companywide to establish structure and consistency across projects.
* Created Microsoft Project template tool to consolidate project schedule onto SharePoint server. Updated project schedules during weekly status meetings involving PM/project teams and posted schedules to server.
* Encouraged PMs to adhere to
schedules, allowing for more accurate allocation of resources companywide.
* Prepared weekly report for all assigned projects to present to upper management, providing analysis and tracking health of projects in comparison to baselines as well as notes regarding job performances of PMs.

Senior Project Controls Consultant في Criterium Consulting Group
  • الجزائر - الجزائر
  • ديسمبر 2012 إلى يناير 2014

* In charge of coordinating and managing local junior planners on three different gas power plant job sites located in the South Algerian Saharan desert containing a total of 14 gas turbines (T70 and T130) along with two MPU (Mobile Power Units - T60) totalling 110 MW of power exertion. Planning was created, tracked and updated for the Civil Works, Installation and also Commissioning Phases which was broken down by individual system.
* Responsible for managing procurement and tracking delivery of material from manufacturer in Europe through delivery to the three jobsites. This included the managing of the material delivery during the complicated Algerian customs process for each shipment, which required fragile coordination with the Algerian client associated with the Algerian government.
* Responsible for managing and QA/QC of progress for engineering, procurement, construction, and commissioning reports used to submit for invoice processing. This process was facilitated after having created and introduced a revised cost reporting method to present to the client directly during weekly coordination meetings.
* In charge of preparation of weekly and monthly site reports which included input obtained from all project teams and were then consolidated to be presented to the client.
** Algeria Project concluded as of May, and currently working on USA domestic projects in California home office. However, I am currently seeking to be part of an other International opportunity.

Senior Project Controls Consultant في Iron Ore of Canada (Delsaer Contractor)
  • كندا
  • أبريل 2011 إلى ديسمبر 2011

* Responsible for realigning budget for IOC Mining & Metals project located in Labrador City, which was at risk of becoming bankrupt. Introduced solutions by creating detailed cost reports and incorporating trending and cash flow analysis to allow for more accurate cost forecasting.
* Generated monthly incurred cost document using SAP accounting tool requiring direct coordination with the site project manager and trade contractors on site in Labrador City in order to present accurate project cost reports.
* Managed all planning of construction and engineering activities by creating project schedule and tracking progress and forecasting on a biweekly basis.
* Highlighted current project status by creating incurred cost and trending construction curves which were used monthly reporting.
* Left due to completed contract and int’l opportunity offered in Algeria.

Project Controls Planning Manager (CONTRACTOR) في snc-lavalin
  • كندا
  • نوفمبر 2010 إلى مارس 2011

* In charge of tracking progress of budgeted hours and forecast to complete (FTC) hours for over 1500 engineering documents and tasks for all disciplines by collaborating with lead engineers and reporting on a monthly basis.
* Responsible for creating Primavera schedule for over 80 Commitment Packages each containing more than 20 activity line items ranging from Start Engineering through to Receipt on Site. * * Responsible for linking all Commitment Package activity codes using PM+ CPN Schedule for various engineering and procurement milestones per package. This was used in weekly meetings to track engineer progress and forecasting.
* Left due to project cancelled because of “Arab Spring” Revolutions.

Project Controls Planning Manager في Bechtel Corporation (Power GBU)
  • الولايات المتحدة
  • أبريل 2010 إلى أكتوبر 2010

* In charge of all deployment and construction trackers which entailed updating (forecasting and actualization of milestones) and reporting of cost, scheduling and production updates for three individual Clearwire markets while managing progress and budgeting of the different functional teams (field coordinators, microwave pathing engineers, market management, quality control and site acquisition teams) to ensure that delivery targets are met.
* Responsible for preparing weekly reports which tracked staffing man-hours, procurement allocation of radio equipment, antennas, wires and cables required for installation at the various cell sites, and transport/access ring functionality with use of engineered network layouts.
* Held daily meetings with Clearwire management, RF and construction teams to discuss forecasted expectations for completion along with the previous day’s accomplishments.
* Left due to desire to relocate back to Montreal to be close to family for personal reasons.

Project Controls Planning Engineer في Bechtel Corporation (Power GBU)
  • الولايات المتحدة
  • فبراير 2009 إلى أبريل 2010

* Responsible for scheduling of 189 cell phone tower sites for 5 different civil vendors for Cox Communications. In charge of reviewing leases and contracts and negotiating exceptions to MLA (Master Lease Agreement) between the landlords and our Cox Client Project Manager.
* Responsible for complete Environmental Compliance Review of all sites to ensure accuracy of NEPA and Phase 1 submittals along with determining work-arounds for instances where hazardous materials were found on site with our environmental contractor.
* Acted as field coordinator in charge of managing Backhaul/Power scheduling and implementation to ensure timely installation of electrical requirements to put sites On-Air.

Planner; Project Controls Engineer في Bechtel Corporation (Mining GBU)
  • كندا
  • أكتوبر 2008 إلى فبراير 2009

* In charge of EPPR (Engineering Progress and Performance Reports) which tracked the budgeted man-hours for the different phases.
* Responsible for transferring entire project schedule with Project Controls team from Primavera 3 to the newly introduced Primavera 6 software.
* Changed Business Unit (BU) within Bechtel Corp. to move from Mining and Metals to Telecoms (Power) due to project cancelled and downsized due to economic crisis. Crisis caught up from US economy to reach Canada in 2009.

Office Engineer/Field Engineer في Turner Construction
  • الولايات المتحدة
  • نوفمبر 2007 إلى يونيو 2008

Project Office Engineer - Miami Intermodal Center $350 million project at Miami Airport: Worked as an office engineer in charge of obtaining and reviewing submittals and shop drawings, creating RFI’s and Corrective Action Notices for QA/QC involving various aspects of the project.

Assistant Superintendent/Field Engineer - Jackson Memorial Hospital (PICU): Equipment layout, material allocation involving keeping inventory and scheduling erection sequence, and punch out for previous phases of the project.

Project Engineer في G.T. McDonald Enterprises
  • الولايات المتحدة
  • سبتمبر 2006 إلى نوفمبر 2007

Worked on the the following projects: YMPA School/Mondrian Condo/Marriot Airport Hotel. Performed all aspects of construction management obligations including superintendent, estimating, office engineering, managing/scheduling subcontractors.

الخلفية التعليمية

بكالوريوس, Building Construction: College of Architecture
  • في Georgia Institute of Technology (Georgia Tech)
  • مايو 2006

GPA: 3.4 ABC Scholarship (Associated Builder's and Contractors) 2003 Hope Scholarship (Atlanta, GA

Specialties & Skills

Project Control
Microsoft Office
Primavera P6
Management Planning
MS Access
MS Excel
Typing 65 wpm
Primavera P6
MS Word
AutoCAD
MS Project

اللغات

الانجليزية
متمرّس
العربية
متوسط
الاسبانية
متوسط
الفرنسية
متوسط

التدريب و الشهادات

Project Management Professional (الشهادة)
تاريخ الدورة:
April 2017
صالحة لغاية:
April 2020
Primavera P6 In-House Training (تدريب)
معهد التدريب:
Bechtel University
تاريخ الدورة:
November 2008