magdy mourad, Q.A-Q.C MANAGER

magdy mourad

Q.A-Q.C MANAGER

SAUDI THUNAIAH FOR TESTING AND ENGINEERING CONSULTANT

Location
Egypt - Cairo
Education
Diploma, Chemistry of cement and building material
Experience
29 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 9 Months

Q.A-Q.C MANAGER at SAUDI THUNAIAH FOR TESTING AND ENGINEERING CONSULTANT
  • Saudi Arabia - Abha
  • April 2005 to July 2017

SUPERVISION QUALITY CONTROL 55 PROJECTS INCLUDE ( 1200Km ROADS WITH M.O.T SAUDI ARABIA--- GAZAN UNIVERSITY --- KING KHALID UNIVERSITY------ KAP 0, 1, 2, 3 WITH MINSTRY OF INTERER—60 NEW BULIDING SCHOOLS== 4 NEW HOSPITAL)
SUPERVISION QUALITY CONTROL 10000 UNIT VILLA WITH MNSTRY OF HOUSING IN GAZAN CITY ALSO 10000 UNIT IN KHAMIS MUSHIT
NUCLEAR CONCRETE MIX DESIGN, (MIX DESIGN ASPHALT BY MARSHALL METHOD AND SUPERPAVE SYSTEM)
SUPERVISION QUALITY CONTROL 2500 VILLA IN AL DAMMAM AREA ARAMCO CO,
QUALITY CONTROL ROADS, PIPES, BOX CULIVARTS, BRIDGE, CORRSION STEEL,

NON DESTRUCTIVE TEST CONCRETE, PILES TEST, HYDROLOGY TEST

quality control manager at al mobty co.
  • Saudi Arabia - Riyadh
  • April 2004 to April 2006

.(2004- 2006) WORKING IN AL MOBTY COMPANY :
QUALITY CONTROL ROADS, PIPES, BRIDGE, CORRSION STEEL, NON DESTRUCTIVE TEST CONCRETE, PILES TEST, HYDROLOGY TEST, NUCLEAR CONCRETE MIX DESIGN, (MIX DESIGNASPHALT BY MARSHALL METHOD AND SUPERPAVE SYSTEM)

QUALITY MANAGER at ORASCOM
  • Egypt
  • February 2002 to April 2004

- Design and implementation Q.C system for all incoming materials and outgoing products.
- Design and implementation of QC system for production process.
- Concrete mix design for paving stones curb stones hollow blocks and solid bricks
- Test of concrete materials and products in accordance with Egyptian standards, British standards and ASTM test designations
- Costing and quantities calculations for final products
- Products developments and research
- Clients technical services such as applicable standards, test methods and durability requirement

q.c manager at AMINTIT FIBER GLASS
  • Egypt - Cairo
  • January 2000 to June 2000

UPGRADING FROM QUALITY CONTROL ENGINEER TO PLANT
MANAGER WITH THE FOLLOWING IMPROVEMENTS ACHIVED
DURING THE PERIOD OF HIS MANGEMENT.
1. QA& QC of raw material inside in manufactory of pipe and products outgoing.
2. Test of pipe materials accordance with ASTM, BS, ES and AWWA.
3. Products developments and research.
4. Clients technical services such as applicable standards, test and durability requirements method.

• DEVELOPMENT THE QUALITY SYSTEM AND THE COMPANY GOT
ISO 9002 BY HIS MANAGEMENT DEVELOPMENT (1998).

• CONTROLING THE QUALITY SYSTEM FOR ALL THE PLANT
BRANCHES.

• PREPRING AND APPLYING THE TRAINING PROGRAMES FOR
EVERY BRANCH.

• PROCEEDING AND PREPARING THE ECONOMICAL STATUS
MONTHLY FOR THE PLANT.

Q.A-Q.C MANAGER at technical abha institute
  • Saudi Arabia - Abha
  • April 1987 to May 2000

DUTIES: --
STUDING, DESIGN AND REVIEWING THE FOUNDTIONS DESIGNS.

• PREPARING THE SOIL TECHNICAL REPORTS ABOUT THE FIELD
TESTES.

• SUPERVISING THE SOIL AND MATERIAL LABORATORY, WHICH
PRESENT IN THE OFFICE.

PREPARING THE ASPHALT TECHNICAL REPORTS ABOUT THE FIELD
TESTES.
PREPARING THE CONCRETE TECHNICAL REPORTS ABOUT THE FIELD
TESTES.

quality control at CHEMICAL ENG.
  • Egypt - Cairo
  • May 1985 to April 1986

* PRACTICAL TESTING OF THE SOIL.

* FIELD TESTS DATA ANALYSIS.

* PREPARING THE TECHNICAL INSTRUCTIONS
FOR DIFFERENT PILES TYPE.

* PREPARING THE CONCRETE MIX DESIGNS
A CORDING TO EACH PROJECT REQUIREMENT.

• PREPARING THE TECHNICAL REPORTS OF THE SOIL INVESTIGATION
FOR THE COMPANY PROJECTS AND FOR OTHER CUSTOMERS.

• DEVELOPMENT OF THE COMPANY LABORATORY.

• PREPARING SCIENTIFIC RESEARCHES ABOUT THE DIFFERENT
LOADING TESTS AND ITS PROCEDURES.

• PREPARING THE STRIP WALLS DESIGN.

• SITES DRYING METH IDES.

• SUPERVISING THE SITES CONSTRUCTIONS AND SOLVING THE
PROBLEMS WHICH FACED.

• THE NUMBERS PROJECTS HE SUPERVISED ITS CONSTRUCTION
AND PREPARED THE TECHNICAL REPORTS IS 67 PROJECTS. Responsible to, implement, monitor and document the QA/QC activities as per the established Inspection & Test Plans (ITPs) and Quality Control Procedures (QCPs) narrated in the Project QA/QC Plan.
 conduct random inspections, monitor the required tests and record inspections and tests made as per the Project QA/QC Plan and Client Specifications an attainment of quality requirement.
 Ensure that all materials and equipment incorporated into permanent construction are in compliance with the contract requirements. Ensure that Engineer’s approval and/or the required factory or supplier compliance certificate have been obtained upon delivery of available material at the project site.
 Coordinate with Site Laboratory and Independent Testing Agencies to ensure that all requisite tests as per Project Specifications are conducted and the reporting is properly done.
 Raise Non-Conformance Reports (NCR) and Site Observation Reports (SOR), for the activities which are deviated from the Contract Specifications or normal construction industry practices and to appraise the Senior/Project QA/QC Engineer. Also to follow up the close out of NCR’s and SOR’s.
 Ensure that the issue, amendment and recall of Controlled Documents and other essential records are done in conformance with the ACC Quality System, the current ISO 9001 standard and the project QA/QC Plan.
 attend the site QA/QC meetings with the project management and subcontractors.
 assist the Senior/Project QA/QC Engineer in the documentation, maintenance and submission of Contract Test Packages.
 prepare the Daily reports of the actual QA/QC activities accomplished during the day and submit to Project Manager and Senior/Project QA/QC Engineer.
 Maintain Quality Records related to the project in a manner, which ensures proper identification, tractability and easy retrieval.
 Conduct Internal Audits as per the Audit Schedule prepared by the QA/QC Manager/Project QA/QC Engineer. Prepare audit reports and raise NCR’s and observations (if required) and follow up the close out of NCR’s and observations.
 Perform all activities in compliance with the Company Health, Safety & Environmental Management System (HSEMS) and the assigned specific responsibilities.
 Comply with and implement the local laws and Client requirements related to Health, Safety and Environmental aspects at workplace as per the bestow authority and responsibility.
 responsible for own and subordinates’ well being and the well being of the environment.
 Arrange Quality Improvement Talk/Technical briefing in coordination with Project Managers/ Field Engineers and maintain records.
 ensure that the equipment is calibrated and are checked for accuracy as per the Calibration Schedule.
co-ordinate the document control of technical submittals, drawings etc. with office engineers and to ensure that the QA/QC validation has been done, for the issue, amendment and recall of controlled documents

Education

Diploma, Chemistry of cement and building material
  • at Zagazig University
  • May 1985
Higher diploma, accept
  • at Zagazig University
  • May 1985

Specialties & Skills

Regional Managers
Quality Control
FOOTBALL
computer and web site
reading
website
engineering program

Languages

English
Beginner
Arabic
Native Speaker
French
Intermediate

Training and Certifications

M.O.T SAUDI (Training)
Training Institute:
SUPERPAVE MIX DESIGN ASPHALT
Date Attended:
January 2005
Duration:
70 hours