محمود أبو جلاله,  Construction Projects Manager

محمود أبو جلاله

Construction Projects Manager

Grand Galaxy Contracting Dubai-UAE

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Civil Engineering And Urban Planning
الخبرات
16 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 11 أشهر

Construction Projects Manager في Grand Galaxy Contracting Dubai-UAE
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ مايو 2020

• Projects Manager,
- Managing the construction work.
- Following and Coordinating with all departments and engineers.
- Review all types of civil works submittals (Shop drawing, Materials, Sub- contractors/Suppliers).
- Contracts Administration and sub-contractors’ assignments.
- Study, evaluate and report the environmental implications of projects.
- Draft and interpret specifications, drawings, plans, construction methods and procedures
- Set up work control systems to ensure that standards of performance, quality, cost and safety are met.
Projects:
- Etisalat Academy Renovation Work 250 Rooms
- Century Mall, Fujairah UAE
- City Land Mall External Works Phase I&2(Hardscaping and Road Works) - Sharjah Driving Institute Civil & Fit out works

Client's Representative, Project Manager في Gulf General Investment Co (GGICO)
  • الإمارات العربية المتحدة - دبي
  • أبريل 2013 إلى مايو 2020

Client's Representative, Construction Project Manager,
Project Planning & Management: Managing project activities and handling the complete cycle of project management through planning, starting from feasibility study, design development, review of Architectural, Structural & MEP Concept Design aimed at efficiency optimization project execution & handing over, In line with the direction of the real estate market and project budget and the application of government standards.
Contract Management: Evaluating & executing contracting works and coordinating among consultants, contractors and clients, preparing the tender specifications & finalization of requirements. Liaising with consultants on determining technical and contractual matters tracking project progress.
Team Management: Coordinating manpower planning for competency building for implementation of new projects. Responsible for team building and providing effective leadership to realize the potential of every member of the team for delivering quantifiable results.
Supervising all construction activities:
* providing technical inputs for methodologies of construction & coordination with site management.
* Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
*Reviewing architectural working drawings, engineering drawings, technical specifications, cost estimates for change orders, review & analyzing contractor's change order proposals,
*Advising client on interior design factors such as space planning, layout and utilization of .
Projects:
- 106 Floors Residential Tower (1.70 million square feet built-up)
- Twin Towers - 40 floor each - Hotel plus Luxury Residential Towers (1.30 million square feet built-up), 175 room business Hotel
- Time Royal, Hotel Bldg., 2B+G+(2-4Typ) + (5-10Typ) +11th HC
- 12 Nos. of mid-rise (9 floors) Residential Buildings (1.30 million square feet built-up) Dubai Silicon Oasis, UAE
- 04 Nos. of mid-rise (14 floors) Residential Buildings (.80 million square feet built-up) Dubai sports city, UAE

project manager في Gulf spring Contracting’s
  • الإمارات العربية المتحدة - دبي
  • يوليو 2007 إلى أبريل 2013

• Project Manager,
- Managing the construction work.
- Following and Coordinating with all departments and engineers.
- Review all types of civil works submitting (Shop drawing, Materials, Sub-contractors/Suppliers).
- Contracts Administration and sub-contractors assignments.
- Study, evaluate and report the environmental implications of projects.
- Draft and interpret specifications, drawings, plans, construction
methods and procedures
- Set up work control systems to ensure that standards of performance,
quality, cost and safety are met.

Projects:
- Cold Store & G+2 Office Building in Dubai Ras Al khor Industrial
AED 346million Project.
- G+8 Residential building in Dubai Silicon Oasis
AED 29million Project
- G+8 Residential building in Dubai Silicon Oasis
AED 84million Project


• Project Engineer, 06/2009 - 03/2011
- G+8+HC (432 flats) in Dubai silicon oasis. AED 100million Project.
- 2B+g+M+13TYP+H.C Hotel building in Al Barsha. AED 50million Project

• Site Engineer, 07/2007 - 06/2009
- Dubai Out Let Mall (Dubai Al ain Road, Dubai)

الخلفية التعليمية

بكالوريوس, Civil Engineering And Urban Planning
  • في Oran University Of Science And Technology - Mohamed Boudiaf
  • يونيو 2006

Bachelor’s degree in Civil and Architectural-Urban Planning Engineering

Specialties & Skills

Work Process Improvement
Quality Control
Managing Budget
Architectural Design
Project Planning
Budget Control
Architectural Design & Development
Process improvement
Project Planning
Quality Control
Project documentation
In-depth knowledge of contracting process, documents and specifications
Ability to evaluate bids and develop specifications
Requirements gathering
Stakeholder management
Project Management
Contract Management
Operation
Negotiation
Primavera P6
Project Execution
Procurement
Primavera

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

Palestine Engineers Association
  • Union member
  • June 2007
General Union for Palestine Students
  • Union member
  • November 2000

التدريب و الشهادات

infrastructure engineer (الشهادة)
تاريخ الدورة:
June 2007
Revit Architecture (تدريب)
معهد التدريب:
Omnix International Authorized Training Center, Dubai
تاريخ الدورة:
May 2005
المدة:
24 ساعة
Software Engineering (تدريب)
معهد التدريب:
El Alamia Training, Algeria
تاريخ الدورة:
March 2005
المدة:
64 ساعة
Navisworks Manage (تدريب)
معهد التدريب:
Omnix International Authorized Training Center, Dubai
تاريخ الدورة:
May 2005
المدة:
16 ساعة
HSE AWARENESS FOR SITE MANAGEMENT (تدريب)
معهد التدريب:
FREE ZONE AUTHORITY, Dubai
تاريخ الدورة:
April 2012
المدة:
32 ساعة