Work Experience

Total years of experience :14 years, 9 Months

Cost Control Engineer at AZMEEL
  • Saudi Arabia - Jubail
  • My current job since February 2018

Main Responsibilities:

• Collect equipment list accommodated at site.
• Collect daily the forms “labor, material, equipment”.
• Ensure that all key persons had received the CBS “seniors + site engineers”.
• Collect & review Betty cash form.
• Collect Subcontractors SRN & Client invoices.
• Send updated CBS sheet for review.
• Update progress % as per CBS on oracle.
• Prepare monthly cost control report.
• Using the ERP-Oracle system to manage and control the project’s Budget.

Projects:

SABIC Al-Matrafiah Housing Project- Secondary Infrastructure & Housing Construction Works Packages (1, 4 & 5).
Description: The Project consists of (3) Packages.
• Package #1 Land Area 480, 000 m2 and Built-up Area 149, 763 m2 and consists of (421) Villas. (1) Imam Villa, (1) Mosque - (Package Value: 610, 067, 149 SAR).
• Package #4 Land Area 482, 000 m2 and Built-up Area 146, 083 m2 and consists of (400) Villas. (3) Imam Villa, (3) Mosque - (Package Value: 604, 274, 285 SAR).
• Package #5 Land Area 783, 000 m2 and Built-up Area 151, 767 m2 and consists of (427) Villas. (1) Imam Villa, (1) Mosque - (Package Value: 643, 658, 614 SAR).

Senior Quantity Surveying Engineer at AZMEEL
  • Saudi Arabia - Jubail
  • January 2015 to February 2018

Main Responsibilities:

• Study the documents for biding projects (Drawings, Specifications and Bill of Quantities).
• Supervising the performance of the quantity surveying team to ensure accuracy.
• Preparation of bills of quantities for projects if not available in the documents.
• Supporting estimation team with quantities for tender projects.
• Preparation of quantities for awarded projects (IFC Drawings) to support the budget team.
• Preparation of quantities for change orders and variation orders for ongoing projects.

Projects:

SOUTH DHAHRAN APARTMENT BUILDING PACKAGE 2C project:
Owner: Saudi Aramco
Location: South Dhahran
Building Area: 47, 927 m2
Description: The Project consists of 12 apartment buildings including Infrastructures, landscape, and hardscape.

Home Ownership Lot Development Housing Units project:
Owner: Saudi Aramco.
Location: Yanbu
Building Area: 109, 974.18 m2 building area and 253, 131.00 m2 site area.
Description: The Project consists of 273 villas in Yanbu with landscape and site work.

Ghazi Al Gosaibi Masjid Project:
Owner: Saudi Basic Industrial Corporation (SABIC).
Consultant: BAC Engineering Consultant group.
Location: Jubail
Building Area: 3, 574.2 m2 building area and 15016 m2 site area.
Description: Construction of Mosque with unique design steel structure and G.R.P cladding and special finish.



ALR'AIDAH HOUSING COMPLEX PROJECT IN JEDDAH Package 03-05:
Owner: Public Pension Agency (RIC).
Consultant: SAK.
Location: Jeddah city
Building 534, 092.51m2
Description: The project consist of 1144 villas.

Al Jubail compound:
Owner: Al Rashed
Consultant: Bina Engineering consultant.
Location: Jubail
Building Area: 90, 782.80m2
Description: The Project consists of 12 Apartment buildings, 251 Residential villas, a Club house building, a Sports Facility, several service building, Site Works and Ancillary Structures.

NEW IKEA STORE PROJECT AT DAMMAM:
Owner: IKEA
Consultant: Projacs international
Location: Dammam
Building Area: 84, 686.88 m2
Description: The Project consists of one building which have 4 floor and parking in ground floor, the project is a pilling work and precast concrete and steel structure and metal cladding and curtain wall.

Long Term Parking in Dammam project:
Owner: Dammam Air Port Company.
Location: Dammam
Building Area: 190, 640 m2 area for parking and road and landscape.
Description: The Project consists of parking shad, roads, fence and landscape for airport.

Steel Structure Engineer at Specialized Aluminium and Steel Company (SASCO)
  • Qatar - Doha
  • April 2012 to November 2014

Main responsibilities:
• Preparing Take off quantities for large scale steel projects.
• Estimating Items Price.
• preparing (Design drawings - shop drawings - fabrication drawings - as built drawings).
• Supervision fabrication process.
• Implementation for the projects.

Projects:
• Lekhiwya sports stadium (Erection for steel covering - fabrication & erection for main entrance).
• Fabrication & erection for 96 steel mezzanine shops in el Wakra zone.
• Design - shop drawing - Fabrication drawing & Erection for 15 factories.

Project Engineer at dar for trading and construction (DETAC)
  • Egypt - Cairo
  • August 2009 to March 2012

Main Responsibilities:
• Check plans, drawings to be reflected to site.
• Ensure that all materials used and work performed are in accordance with the specifications.
• Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
• Plan the work and efficiently organize the site facilities in order to meet agreed deadlines.
• Prepare reports as required.
• Resolve any unexpected technical difficulties and other problems that may arise.

Projects:
• Giza System Administrative Building at Al-Tagmoa al Khames.

Education

Bachelor's degree, Design and Civil Engineering
  • at Helwan University Cairo
  • July 2009

• Civil, Bachelor (BSc/BA), GPA Good • Graduation Project: Concrete project. • Graduation Project Degree: - Very good

Specialties & Skills

Microsoft Excel
AutoCAD 2D
Planswift
Oracle Collaboration Suite
AUTOCAD

Languages

English
Expert

Training and Certifications

PMP (Certificate)
Date Attended:
February 2020
PROJECT ENGINEER (Training)
Training Institute:
TLLAT MOUSTAFA

Hobbies

  • Gymnastics