Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mahmoud Torfa, MEP Lead Consultant

Mahmoud Torfa

MEP Lead Consultant·Edarat Group Consultant

Saudi Arabia

Bachelor's degree, Mechanical Engineering

Work experience

Total years of experience: 17 years, 5 months

MEP Lead Consultant

June 2022 - Present

Edarat Group Consultant

Dammam, Saudi Arabia

I found this job using Bayt.com

June 2022 - Present

The data centers shall be constructed simultaneously, three (3) in each city with an initial capacity of 24MW and with a maximum capacity of 16MW of IT load per data center. The three data centers in each city will form one availability zone.
The total of the two availability zones will be 96 MW per phase.
• Perform site inspection, act as a MEP CM, and generate documents and punch lists specifying areas of shortcomings and recommendations for enhancements.
• Review IFC design drawings, shop drawings and material submissions.
• Meet with the client to determine the availability of project requirements. Clarify a clients systems specifications, understanding their work performances and the nature of their features and functional specifications.
• Supervise installation of new equipment, generators, transformers, and power modules.
• Verify the design of the site layout for the Mechanical equipment as well as the proper routing of piping distribution.
• Provide insights on water mist, fire detection and suppression solutions that relate to data centre spaces and M&E support facilities.
• Coordinate with Design and Installation teams and respond to inquiries and support in construction.
• Calculate total cooling loads and determine capacity and specifications for chillers, pumps, AHUs, CRAH/CRAC, and ventilation systems.
• Advise on the most appropriate type of cooling solutions and size capacity and determine specifications of A/C equipment of CRAC/CRAH and HVAC systems.
• Supervise testing and commissioning activities to ensure systems are well integrated and working properly as designed.
• Report periodically on the status and progress of activities and achievements to the direct manager.
• Stay up to date with the latest developments in work.

Company industry:
IT Services
Job role:
Consulting

Senior Mechanical Engineer / MEP

October 2020 - June 2022

Egis international

Mecca, Saudi Arabia

I found this job using Bayt.com

October 2020 - June 2022

• Assessment of requirement of Makkah Municipality and the affiliated Municipalities.
• Methodology of work to develop the project management office.
• Analysis of different projects within Municipality and its affiliated.
• Study and assessment of the current project management methodologies used in Makkah Municipality.
• Implementation of the project management methodologies developed by the NPMO and selection of a framework including policies, procedures, tools, techniques, templates, auxiliary software in line with the international standards and best practices in project management.
• Preparation of the project management plans for the new projects including the study of the project management process groups and project management knowledge areas to cover time management, cost management, quality management, HR management, communications management, risk management, procurement management and stakeholders management.
• Development of the risk register for the projects to study the risks affecting the projects and how to mitigate them.
• Analysis of the process performance for the current and new projects to monitor their compliance with the present project management plan.
• Analysis of the variances, if any, in addition to development of the revised project management plans in order to achieve the project objectives.
• Management of the change orders / claims submitted by the contractors / consultant.
• Monitoring of the audits the operations / processes within the PMO Departments to obtain and maintain ISO Certification; also, to monitoring and audit of the project management processes within each project.
• Evaluation of the expertise and skills of the employees of Northern Borders Municipality and its affiliated Municipalities.
• Training for the employees of Makkah Municipality and the affiliated Municipalities.
• Handing over the project management office to Makkah Municipality.
• Attend all handovers for relevant projects and follow up with consultants.
• Use PMWeb systems for projects control and review all documents.
• Preparing Check list for all documents related to the project.
• Gathering of relevant projects data.
• Produce information to be presented for review by the management.
• Provide necessary project management support and Provide Expert Advice.
• Ensure development and implementation of consistent as well as standardized business processes.
• Tracking the overall status of those projects.
• Prepare and review risk register, Project Risk Register Template has been prepared to support execution of the Project Risk Management Procedure
• Involved in current situation evaluation of Holy Makkah Municipality and projects.
• Prepare and ensure implementation of QMS at Holy Makkah Municipality and its projects.
• Conduct audit for Municipality projects to meet quality management requirement.
• Update Holy Makkah Municipality quality procedure to achieve vision of National PMO.
• Update archiving procedure at Municipality SQL system (PMWeb).
• Present QMS to new consultant and contractor teams.

Company industry:
Management Consulting
Job role:
Management

Mechanical Construction Manager

May 2015 - September 2020

Beijing Emirates international construction

Medina, Saudi Arabia

May 2015 - September 2020

► Led and developed full scale Mechanical Site Progress. Define the project scope of work, its goals
and verify deliverables. Tracked project deliveries using project management tools. Tracked and
resolved critical issues to minimize project risk factors.
* Supervising on installing all mechanical works “Plumbing, HVAC & Fire Fighting Systems and Infrastructure
Works “.
* Follow up Payments Certificates with Consultant & Owner.
* Represent the organization and enhance relationships in dealings with client, consultants and regulatory
authorities to ensure all agreements are implemented.
* Lead and Communicate with Project Manager, Subcontractors and Vendors to assist them in working to the
Project Schedule as it pertains to MEP’s.
* Represent Company with Owner(s), Architects, Consultants, Government Authorities and Subcontractors.
* Administer financial aspects of the Owner’s contract, subcontracts, and purchase orders.
* Build effective working relationships with clients and the project team members.
* Review the general contract and contract documents and confirm the budget setup and project milestones
in conjunction with Project Lead.
* Create a schedule of values and project logs, plan for project safety and mobilization, including review and
validation with team members.
* Coordinating with consultant for Site works and submitting IR, MIR and Review document control process.
* Maintain the cost control, buy schedule, write scopes of work, distribute and log subcontracts, write
required contract riders and purchase orders, confirm compliance with project insurance requirements.
* Maintain and manage all purchase and delivery schedules, change order processes, shop drawings,
document control logs, Owner, Architect and Subcontractor correspondence.
* Attend all schedule and management MEP meetings necessary to monitor and manage the project, chairing
as appropriate.
* Manage all requisitions and payments including lien releases and project payroll and maintains best possible
cash flow throughout the project, communicating issues proactively.
* Deliver all necessary manuals to the Owner, consolidates project documentation and files.
* Manage subcontractor closeout, transfer of utilities, owner training, and punch list process.
* Deliver all warranties, as-built and training to the owner.
* Manage work teams for effective delivery of daily objectives including the control of work hours, overtime
and incentive schemes to improve efficiency.
* Manage resources and equipment to achieve contract completion within budget and time.
Beijing Emirates international for construction.\[

Company industry:
Construction & Building
Job role:
Construction and Building

In charge

March 2014 - May 2015

SACO Co

Riyadh, Saudi Arabia

March 2014 - May 2015

SACO

Company industry:
Sports & Outdoor Activities
Job role:
Sales

Mechanical Engineer

January 2015 - January 2015

KSA

Cairo, Egypt

January 2015 - January 2015

Company industry:
Construction & Building

Site Mechanical Engineer

March 2009 - March 2014

Project Details

Cairo, Egypt

March 2009 - March 2014

1.Marriott Hotel
Location: Mirage City - new Cairo
Owner: Sakara Moner Ghabour
Main Contractor: Nile-Aster
Consultant: EMC
Manager: IMS
Design: Nile-Aster
* Prepare Submittals and required materials (MIR, IR).
* Supervising the installing VRV system did by DAIKIN, 40 outdoors units, 600 indoors FCU, 18 total fresh air
units, over than 300-ton sheet metal and black steel with hoods according to details.
* Installing domestic and drainage water pipes, showers, lavatory with full accessories according to specs and
drawings.
* Installing Fire Fighting water pipes up to 6 inch, Coating and Testing all network using welding type
according to specs and drawings.
2.Unicharm Factory (baby-joy factory)
Location: 10th of Ramadan City
Owner: Unicharm Factory baby-joy
Main Contractor: SIAC
Sub-Contractor: IMS
Consultant: Ehaf
Manager: Hill international
Design: Kajema
* Prepare Submittals and required materials (MIR, IR).
* Supervising on installing 2 chillers 650-ton refrigerant for each, 4 cooling tower, 4 chilled water pump, 9
AHU, 65 FCU, 12 Decorative FCU with its hock-up, over than 120-ton sheet metal black steel with hoods
according to details.
* Installing chilled water pipes up to 16 inch, testing coating balancing and insulated according to specs and
drawings.
* Installing duct work according to shop drawings, composite drawings. and SMACNA.
Integrated Mechanical System (IMS) Company. Egypt,

Company industry:
Construction & Building
Job role:
Mechanical Engineering

Mechanical Site Engineer

January 2009 - January 2011

SIAC

Cairo, Egypt

January 2009 - January 2011

Company industry:
Construction & Building
Job role:
Management

Education

Ain Shams University

January 2009

January 2009

Bachelor's degree, Mechanical Engineering

Egypt

courses: Value Methodology Basis and Principles (VE). * Planning, Scheduling & Cost Control with Primavera P6. * Arena.

Skills

QA QC
Expert
QA QC
Expert
Mechanical Engineering
Expert
Mechanical Engineering
Expert
Infrastructure Projects
Expert
Infrastructure Projects
Expert
Electro mechanical
Expert
Electro mechanical
Expert
HVAC
Expert
HVAC
Expert
MECHANICAL ENGINEERING
Expert
MECHANICAL ENGINEERING
Expert
PROJECT MANAGEMENT
Expert
PROJECT MANAGEMENT
Expert
CONSULTING
Expert
CONSULTING
Expert
MECHANICAL
Expert
MECHANICAL
Expert
data center
Expert
data center
Expert
Supervision
Expert
Supervision
Expert
QA QC
Expert
QA QC
Expert
Mechanical Engineering
Expert
Mechanical Engineering
Expert
Infrastructure Projects
Expert
Infrastructure Projects
Expert
Electro mechanical
Expert
Electro mechanical
Expert
HVAC
Expert
HVAC
Expert

Languages

English
Expert