Electrical Project Manager
Khatib & Alami
Total years of experience :35 years, 6 Months
Team capacity Building
Organizational Structures Development
Design & shop drawing review
expert in Materials specs. And approvals.
Projects Management.
technical support.
Lead Team Work.
• Redesign & shop drawing review .
• Materials Submittal Study For approval.
• Full Arrangement Between Contractor And Owner.
• Review modified B.O.Q
-Design & shop drawing review and Materials approval for ministry projects (Academic Buildings)
-Inspection of work on site.
-Lead Team work.
-Reports and Paper works.
*For the following disciplines and types of work:
a ) Medium Tension Works & Switch Gear.
b) Low Tension Works (Lighting & Power Distribution)
c)Low Current Works ( CCTV systems, Public Address, Fire Alarm,
Telephone System & Clock System, )
d) Control Panels ( for AC, Lighting, … )
A)During Construction :-
-Design & review electric shop drawing for the factory.
-Inspection of work on site till construction finished.
-Installation & test running for all factory equipment.
B) After Construction :-
Maintenance & troubleshooting for :
a- Melting induction& Pouring furnaces, Annealing furnace, & Sand preparation plant.
b- Water Treatment Station, Diesel Generator, Air Compressor, Cooling Towers.
c- Hydraulic & Pneumatic Systems.
d -Control panel for the machine using PLC .
e- Preparing Spare Parts Purchasing Order.
A) During Construction :-
1- Design & review electric shop drawing for the factory.
2-Inspection of work on site till construction finished.
3- Installation & test running for all factory equipment.
B) After Construction :-
1- maintenance for plastic machines (injection & Blow molding)
2-Programmable machines (PLC& PC).
3-Water Treatment Station, Diesel Generator, Air Compressor, Water Boiler,
Chiller, Cooling Towers.
4-M.T Transformers 11 KV & Switch Gears.
Proceed all maintenance needed and repair any fault to continue the operation for :
-Cement Kilns, Raw Mills & Cement Mills.
-Lime stone & Clay Scrapers & Conveyors.
-Water Pump St., Diesel Generator, Air Compressor, Boilers.
-M.T Transformers (11/ 0.380 -11/6 KV)& Switch Gears .
-Distribution Board & control panels using PLC .
- Site inspector .
- Reports and Paper works.
- Preparing materials & Purchasing Order.
Electrical Power And machine Design Project: Power System Stability (Excellent Grade) ninth ranking .