MECİT  ŞADOĞLU, Project Manager –Fitout Construction Manager.  FA Consultants, Faris Al-Fari

MECİT ŞADOĞLU

Project Manager –Fitout Construction Manager. FA Consultants, Faris Al-Fari

FA Consultants

Location
Qatar - Doha
Education
Doctorate, Regional And Urban Planning
Experience
19 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 8 Months

Project Manager –Fitout Construction Manager. FA Consultants, Faris Al-Fari at FA Consultants
  • Saudi Arabia - Riyadh
  • My current job since February 2018

• GAC - GENERAL AUTHORITY FOR COMPETITION Head Quarter Project/Built-up Area: 6200 m²/Construction Cost:79 Million SAR /Consultant’s Project Manager/. One of the most important challenges in the project is the difficulty of presenting the higher rules through the outer facades due to their designs. But the situation has been adapted and suitable solutions were set through formulating accurate timing schedule to observe the improving process of the project, and to measure the earned value with the expected value ever week. As well as adopting materials, implementing methods, submissions plan schedules, and implemented plans as requested, within High quality & safety standards.
• QOL - QUALITY OF LIFE PROGRAM Head Quarter Fit out Project/ Built-up Area: 3200 m² Construction Cost: 17 Million SARs/ Fit Out Consultants Project Manager/. These projects specialize in equipment project service nature, and materials in the matter of the project crew’s entering and exiting timing and the required materials as well as the coped private logistic support. With that, a special plan was set to avoid any delaying at this project as a result of closing the project’s area due to the frequent events and conferences in the district. Which was not new to the project’s management to pass these challenges successfully.
• DGDA - DEVELOPING AL DIR'IYA GATE AUTHORITY Head Quarter Fit out Project/ Built-up Area: 3, 000 m²/ Construction Cost: 18 Million SARA/ Fit Out Consultant Project Manager/. Attempting to accommodate between modern existed building and an interior design inspired by the traditional architecture, as well as attempting to relate existing systems with modernized systems of the project, and reconciling between the project’s owner desires and the estate owner requirements, were all difficult challenges lead to positive motivations to accomplish the successful project.
The project’s site was the most challenging part, as being interior finishing for an existing building at Safarat District restricted at certain work hours, and materials entry hours. Notably, the building is occupied in some floor, which made the storage and lifting materials process more challenging.
The major assignment for FA in this project is the integrative engineering supervision on the implementation, from reviewing designs until the final submission and adopting the setting planning according to the quality setting and guarantee adopted for the project. Responsible for architecture division technical decisions and implementation of project specification and to ensure that the project is constructed in good quality accordance with approved quality plan.
• Main Contributor to build the FA Consultant’s Project Quality Plans PQP and The Consultancy supervision work flow, Including the project managements time schedules, inspection & testing plans ITP, method statements MES, approved material lists & vendors MAS, shop drawings review & approvals SDS, acceptance criteria, contractor’s adoption & prequalification, etc.

Owner preventative –QA/QC Architects Team Leader. SABIC, Sabic Riyadh Compound Mega Project, Riyadh at Saudi Basic Industries Corporation - Sabic
  • Saudi Arabia - Riyadh
  • September 2014 to February 2018

• Lead a staff of 15 architects and inspectors as a QA/QC Architects Team Leader, to Supervise a finishing project, Alwaseel Hills, Sabic Riyadh Compound Mega Project (cost 2, 83 Billion S. Riyals, cross Area 1, 860, 000 Square Meters, 1108 Saudi & Expat Villas, With all Common Building & Utilities like: Schools, Towne Center, Mosques, Playgrounds, Recreation Centers, Landscape & Gardens areas)
• Review Architectural Shop drawings, M.S (Method Statement), ITP (Inspection & Testing Plan) & Materials approvals for all finishing Items. To compare it with IFC documents & SABIC Specs.
• Responsible for architecture division technical decisions and implementation of project specification and to ensure that the project is constructed in good quality accordance with approved quality plan.
• Responsible for material’s selection and inspection, in AMS (Approved Mock-up Samples), MIR (Materials Inspections Reports) Snag lists & handing over inspections.

Main Contractor– QA/QC Architecture division Manager & Design Coordinator. SBG Saudi Bin Ladin Group at SBG- Saudi Bin Ladin Group
  • Saudi Arabia - Jeddah
  • September 2011 to September 2015

• (01/02/2014- 09/02/2015) Projects Design Coordinator, SBG-ABCD- Head Office for following projects: the proposed 11 Stadiums, Taif Proposed new airport & Al-Madinah Grand Mosque extension.
• (28/09/2011- 01/02/2014) Lead a staff of engineers and technicians as a QA/QC Architecture division coordinator, to Supervise a finishing project quality for the Ministry of Interior (cost 1, 6 Billion S. Riyals, cross Area 2, 300, 000 Square Meters)
• Prepare Submittal for Approval for: Materials, Subcontractors prequalification’s submittals, and coordinate with Head Office to get approvals for it.
• Prepare all documentations for QA/QC: RFI (Request For Inspection), RFT (Request For Testing), MIR (Material Inspection Report), SCR (Site Clarification Request), closing Consultant issues: NCR (Non Conformance Report), FM (Field Memo), SWI (Site Work Instruction)
• Prepare QA/QC Reports and corresponds with clients, consultant & Subcontractors.
• Provide the site with all information, regarding design, specifications, materials and equipment.

ARCHIZONE center for architecture Owner & main director, Al Nabk, Syria at ARCHIZONE
  • Syria - Damascus
  • May 2008 to September 2011

• Founding member and Chairman of the ARCHIZONE Group Firm, for architecture in Damascus suburb, Al Nabk, since 2008 (urban Design, Architecture Design, Decoration, Supervision & Construction).
• Principal client’s projects were Services Centers, Villas and housing, as well as developers, investors and numerous private sector companies.
• Provide management consultancy and technical support to the Clients.
• Achieve numerous projects throughout Al Kalamoon Province within acceptable budgets and timeframes, and prepare many projects’ registration shop drawings for Engineers Syndicate. Prepare information regarding design, specifications, materials and equipment.
• Draw up costs, schedules and other elements associated with construction projects.
• Manage the production of construction documents, drawings and specifications
• Coordinate schedules and workloads.
• Generally, act as the leading individual contributor and coordinator of design problem-solving.
• Architectural Design, design development, and all shop drawing for Cham Plaza Mall project, next to Damascus new fairgrounds, airport highway, (Mall, 4star hotel, hypermarket & Companies compound) the total of built area= 96000m2, 2008-2010.
• The first award of the competition for landscaping design of ALSSEDIK public garden, Individual participation, total area= 6600 m2 Syria, Al Nabk.
• Urban design, Architectural design & Landscaping design for ALMUMLAKAH, Kingdome resort, (54 villas, sport center, shopping center, playgrounds & mosque) total area=86000m2, Syria, Al Nabk. 2008
• Architectural design, shop drawings & Construction manager for the extension of Al Kalamoon hospital, X-ray center, turnkey, total built area= 1850m2, Syria Al Nabk. 2009
• Architectural design & shop drawing for The Cardiac Surgery Center, a specialist center and the third of its kind in the Middle East, total built area=4750m2, under construction, Syria, Al Nabk. 2010
• Architectural design, shop drawings & construction manager for MAKANI hotel, Turnkey, (120 rooms, Coffee Shop, swimming pool, gem, electronic gadgets lounge & Garden), total built area = 7850 m2, Syria, Derattyah. 2009-2010
• Graphic Design of many company’s Logos and sculptural design for many Memorials, Alkalamoon.

Site Engineer at Bassam Shaker & partners for construction, Riyadh, KSA
  • Saudi Arabia - Riyadh
  • September 2007 to May 2008

• Finishing Site engineer, Holyday Inn 5 stars Hotel, Turnkey, provide the site with shop drawings, Supervise, arrangement for the time schedule, Site work instruction, reports & Review architectural documents for potential conflict with other disciplines, Riyadh, KSA. 2007
• Architectural coordinator & site engineer, ALHOKIER Resort, (3stars Hotel, 48 chalets, Shopping center & Playgrounds), total built area = 7800 m2, Red sea, Alhagel, KSA.2008
• Design development of urban designing project for Piccolo Palazzo, (Shopping Mall, Residential buildings, Sport station, Mosque, Playgrounds & Public Garden) total built area= 274000 m2, Jeddah, KSA. 2007-2008

Designer, Assistant Lecturer. Al NIBRAS Company, University of Al-KALAMOON, Derattyah, Syria at Al NIBRAS Company, University of Al-KALAMOON
  • Syria - Damascus
  • August 2004 to September 2007

1- Architect designer & supervision for many buildings & landscape:
• Complete the main Campus of the university, the Master Plans, including landscape and all facilities 560, 000 m², total built area = 162, 600 m².
• Design and Supervision for each of the following Buildings:(Faculty of Medical Sciences, Faculty of Management, Sport Station, Open Air Theatre with Backstage, Site Plan Extension, Environmental Garden with protected nature zoo, Main Restaurant, Landscape & hardscape)Al NIBRAS Company, University of Kalamoon, 2004-2007
• Supervising Engineer for: (Mosque, NIBRAS Shopping Mall, Main Library, Educational Hospital, Student residence buildings) Al NIBRAS Company, University of Kalamoon, 2005-2006
• Finishing Construction Manager for The Main Restaurant building, 3600 m2, Al NIBRAS Company, University of Kalamoon, 2006
• Technical office Department Manager for one year, University of Kalamoon, 2006-2007.

2- Assistant Lecturer in the Faculty of Architectural engineering, practical Section, Architectural studio (1&2), Urban planning (1).2005-2007 (as a support for Prof. WAEL SAMHORI).
• Design many building in UOK campus as a practical design section, all of those building were built and now in use (Sport Station Center, Mosque, faculty of management, open theater and many of landscaping design).
• Keep student in touch with under construction building at the campus for all building stages, from excavation up to turn key.
• Prepare course materials, syllabus, homework assignments, and handouts.
• Collaborate with colleagues to address teaching and research issues.
• Ensure to keep abreast of developments in the field.
• Served on academic and administrative committees dealing with institutional policies, departmental matters, and academic issues.
• Organize exhibitions displaying student designs and projects.
• Select and obtain library and laboratory materials.
• Training of students for the most benefit software (Computer Aided Design) CAD, 3DSMAX, Sketch up & ArchiCAD.

Education

Doctorate, Regional And Urban Planning
  • at Istanbul Sabahattin Zaim University
  • July 2023
Master's degree, Architecture - Urban Planning & Environment
  • at Damascus University
  • March 2007

• 2004 – 2007| Master’s Degree in Urban Planning & Environment, Faculty of Architecture, Damascus University, Syria

Bachelor's degree, Architectural Engineering And Urban Planning
  • at Damascus University
  • August 2004

Bachelor’s Degree of Architecture Engineering, Faculty of Architecture, Damascus University, Syria

Specialties & Skills

quotations
engineering management
purchase contracts
procurement
quality auditing
management consulting
quality assurance
writing
ms project
negotiation
project execution
project planning
materials
program management
operation
urban planning
site supervision

Social Profiles

Personal Website
Personal Website
majdalsaad.com/

Languages

Arabic
Native Speaker
English
Expert
Turkish
Intermediate

Training and Certifications

Safety Design in Building (Training)
Training Institute:
Sesam Consultants &
Sabic Appreciation Certificate (Certificate)
PE - Professional Engineer (Certificate)
Date Attended:
February 2012
Professional Accreditation (Certificate)
Date Attended:
February 2012
PMP - Project Management Professional (Certificate)
Date Attended:
February 2018