Total des années d'expérience: 14 Années, 11 Mois
août 2023
A À présent
Senior Design Electrical Engineer
à China Harbor
Lieu :
Arabie Saoudite - Riyad
• Lead a team of Site Engineers, cad operators, supervisors and technicians for several specific projects.
• Attending design meetings with client & consultant.
• Splitting project specifications, scope, BOQ & drawings into packages and getting respective quotations from suppliers & subcontractors and perform necessary assessment.
• Studying project scope, specifications, BOQ & drawings and pick any vague part in project documents or where there is a discrepancy in project documents and send respective RFI to declare all project scope and specifications.
• Studying IFC drawings, making necessary comparison between IFC drawings & tender drawings and making assessment for any changes which can be claimed as cost/time variation
• Review design drawings and documents provided by design consultant and put respective technical comments based on project scope in order to avoid over-specifications or extra items out of project scope.
• Review suppliers and subcontractors Material Submittals against project specifications.
• Attending design meetings with client & consultant.
• Splitting project specifications, scope, BOQ & drawings into packages and getting respective quotations from suppliers & subcontractors and perform necessary assessment.
• Studying project scope, specifications, BOQ & drawings and pick any vague part in project documents or where there is a discrepancy in project documents and send respective RFI to declare all project scope and specifications.
• Studying IFC drawings, making necessary comparison between IFC drawings & tender drawings and making assessment for any changes which can be claimed as cost/time variation
• Review design drawings and documents provided by design consultant and put respective technical comments based on project scope in order to avoid over-specifications or extra items out of project scope.
• Review suppliers and subcontractors Material Submittals against project specifications.
novembre 2018
A janvier 2023
Senior Electrical Engineer
Jai trouvé cet emploi à travers Bayt.com
à Petroserv Limited
Lieu :
Qatar - Doha
• Lead a team of Site Engineers, cad operators, supervisors and technicians for several specific projects.
• Attending design meetings with client & consultant.
• Splitting project specifications, scope, BOQ & drawings into packages and getting respective quotations from suppliers & subcontractors and perform necessary assessment.
• Studying project scope, specifications, BOQ & drawings and pick any vague part in project documents or where there is a discrepancy in project documents and send respective RFI to declare all project scope and specifications.
• Studying IFC drawings, making necessary comparison between IFC drawings & tender drawings and making assessment for any changes which can be claimed as cost/time variation
• Review design drawings and documents provided by design consultant and put respective technical comments based on project scope in order to avoid over-specifications or extra items out of project scope.
• Review suppliers and subcontractors Material Submittals against project specifications.
• Attending design meetings with client & consultant.
• Splitting project specifications, scope, BOQ & drawings into packages and getting respective quotations from suppliers & subcontractors and perform necessary assessment.
• Studying project scope, specifications, BOQ & drawings and pick any vague part in project documents or where there is a discrepancy in project documents and send respective RFI to declare all project scope and specifications.
• Studying IFC drawings, making necessary comparison between IFC drawings & tender drawings and making assessment for any changes which can be claimed as cost/time variation
• Review design drawings and documents provided by design consultant and put respective technical comments based on project scope in order to avoid over-specifications or extra items out of project scope.
• Review suppliers and subcontractors Material Submittals against project specifications.
février 2017
A novembre 2018
Elecctrical QC Inspector
à Mitsubishi Heavy Industries
Lieu :
Qatar - Doha
Work executed as per Quality requirements.
Inspection of all electrical services.
Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
Inspection of all electrical services.
Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
janvier 2015
A janvier 2017
Trags Engineering
à Trags Engineering
Lieu :
Qatar - Doha
Support MEP manager in all technical concerns.
🢥 Progress review, conduct technical, and Coordination meetings with main contractor and consultant.
🢥 Ensure engineering is compliant with contract specification.
🢥 Taking over, warranty period monitoring, final taking over.
🢥 Develop and maintain labor and cost estimates for project work.
🢥 Develop schedule, task breakdown, and resource allocation for the engineering part of the project.
🢥 Provide technical support during the proposal stage of projects (i.e. cost estimates, layout concepts, equipment sizing, etc.)
🢥 Expertise in implementing cost saving measures to achieve substantial reduction in terms of production cost, raw materials and energy consumption. Ensure engineering standards of quality, cost, safety, timeliness and performance are observed
🢥 Progress review, conduct technical, and Coordination meetings with main contractor and consultant.
🢥 Ensure engineering is compliant with contract specification.
🢥 Taking over, warranty period monitoring, final taking over.
🢥 Develop and maintain labor and cost estimates for project work.
🢥 Develop schedule, task breakdown, and resource allocation for the engineering part of the project.
🢥 Provide technical support during the proposal stage of projects (i.e. cost estimates, layout concepts, equipment sizing, etc.)
🢥 Expertise in implementing cost saving measures to achieve substantial reduction in terms of production cost, raw materials and energy consumption. Ensure engineering standards of quality, cost, safety, timeliness and performance are observed
janvier 2013
A janvier 2015
Electrical Engineer
à Terna Sa
Lieu :
Qatar - Doha
Includes plan, control, review material requirements and team activities, sub-contractors, specialist suppliers’ activities to meet project milestones. Managing a team of supervisors and large size work force. Day to day coordination with Sub contractor and client representatives.
🢥 Installation of earthing mats and connection from earth terminals to the earth bus bar and lightning protection pits
🢥 Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
🢥 Verify material quantity take off and order the materials and equipments as per project requirement, check and correct all shop drawings.
🢥 Installation of earthing mats and connection from earth terminals to the earth bus bar and lightning protection pits
🢥 Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
🢥 Verify material quantity take off and order the materials and equipments as per project requirement, check and correct all shop drawings.
juin 2011
A janvier 2013
Electrical Site Engineer
à Saudi Bin Ladin Group
Lieu :
Arabie Saoudite - La Mecque
Includes plan, control, review material requirements and team activities, sub-contractors, specialist suppliers’ activities to meet project milestones. Managing a team of supervisors and large size work force. Day to day coordination with Sub contractor and client representatives.
🢥 Installation of earthing mats and connection from earth terminals to the earth bus bar and lightning protection pits
🢥 Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
🢥 Verify material quantity take off and order the materials and equipments as per project requirement, check and correct all shop drawings.
🢥 Installation of earthing mats and connection from earth terminals to the earth bus bar and lightning protection pits
🢥 Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
🢥 Verify material quantity take off and order the materials and equipments as per project requirement, check and correct all shop drawings.
juin 2009
A janvier 2011
Electrical Site Engineer
à Terna Sa
Lieu :
Émirats Arabes Unis - Sharjah
Includes plan, control, review material requirements and team activities, sub-contractors, specialist suppliers’ activities to meet project milestones. Managing a team of supervisors and large size work force. Day to day coordination with Sub contractor and client representatives.
🢥 Installation of earthing mats and connection from earth terminals to the earth bus bar and lightning protection pits
🢥 Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
🢥 Verify material quantity take off and order the materials and equipments as per project requirement, check and correct all shop drawings.
🢥 Installation of earthing mats and connection from earth terminals to the earth bus bar and lightning protection pits
🢥 Interact with the consultant to get the material to be used and installed systems after installation.
🢥 Move on to the site as Request for Inspection before installation of electrical equipments.
🢥 Supervise and analyze daily MEP work done by the subcontractors.
🢥 Solve design related issues incurring on site during the installation of MEP works.
🢥 Attend meetings with Project Managers of sub-contractors to discuss the status of installations and material on site.
🢥 Supervise installation of transformers, panel boards, lighting system, grounding and power system, local control stations, fire detection/alarm system, Public address systems etc.
🢥 Providing Temporary Power Supply for work execution.
🢥 Liaison with client’s supervision staff.
🢥 Overall planning, scheduling, monitoring and management of project including works scheduling, monitoring progress of work to ensure timely completion without any cost and time overrun.
🢥 Schedule & resource finalization with project team.
🢥 Participating in project review meetings for tracking project progress
🢥 Co-coordinating with external agencies, clients & consultants for design, specs & change management.
🢥 Verify material quantity take off and order the materials and equipments as per project requirement, check and correct all shop drawings.