Construction Manager
Marathon Construction Co. (Pvt.) Ltd.
Total years of experience :38 years, 7 Months
Project Management / Supervision / Execution of Mechanical construction projects in Oil & Gas sector in Pakistan and Middle East.
September 2012 till now Working as Construction Manager with Techno Engineering
Services ( Pvt.) Ltd. at Inter Refinery Pipeline Project in Abu Dhabi
May12, 2003 till to date: Worked as Technologist-I with Pak-Arab Refinery Limited in Pipeline Maintenance Deportment with following responsibilities
1 Worked for one year as Construction team member for 850 km Cross country White Oil Pipe line Project responsible for monitoring and execution of ROW, stringing, welding, trenching, heat shrink sleeving, lowering-in tie-in, Xing, purging, pigging and Hydro static testing.
2 Worked for 08 years as Pipeline maintenance coordinator for preventive and emergency maintenance of cross country Pipelines net works from Karachi to PARCO refinery and on word.
3 Supervision of Maintenance of Process Equipments (Rotary and Static), Piping Network, Storage Tanks and Vassals, and Utilities.
May 30, 2002 till to date: 1 Worked as Superintendent Q/A- Q/C with Lasmo Oil Pakistan at their BHIT GAS Development Project in Sehwan Concession Area. for following responsibilities: 1 To Monitor and Control Quality of Grit and Garnet Blasting for Surface Preparation and Cleaning of Steel Structure, Steel Storage Tanks, Pressure Vessels, and Process Piping prior to painting. As per NACE and ISO Standards. and Lasmo Project Specifications.
1 To Check and Control of Quality of Painting by Airless Spray Method at Steel Structure, Storage Tanks, Vessels, and Process Piping maintaining WFT & DFT of the Paint as per Specified Paint systems.
1 Quality Control of Blast Cleaning and Wrapping of Buried Flow Lines and Gathering for Bhit Gas Facility.
1 Quality Control of Chemical Cleaning, De- Rusting, and Phosphating of Ware- House Shelving Structure. prior to Painting by Powder coating.
1 Quality Control of Painting of Ware House Shelving Structure by Powder Coating, Checking Paint Application Quality and Paint Baking Process at their Wander s Facility in Karachi.
2 Quality Control of Hot and Cold Insulation at Process Piping, Storage Tanks and Process Equipments.
December2011 to August 2012 Worked as Site Co Coordinator with Attela Dogan & Seeh Al Sarya LLC. Oman for Petroleum Development Oman.
. December 2000 - May 2002 Worked as Q/A Q/C Inspector/CO ORDINATOR with BP Pakistan Exploration & Production Inc. at their BADIN concession area responsible for: 1 To Conform Q/A- Q/C for the following on behalf of BP Pakistan
2 Maintenance and Re - Furbishment of Storage Tanks, complete with Calibration and Re- Certification.
3 Fabrication and Installation of Pressure Piping Network as per ASTM - ASME, B- 31.3 Standards.
4 Maintenance and Repair of Process Piping and Buried, Flow lines and Trunk lines.
5 Blasting and Painting of Storage Tanks and Steel Structure.
6 Laying of Buried Pipelines at their different Facilities. as per API - 5L and API - 1104, ASME Section IX.
7 Quality Control of Application of Insulation at Process Piping, Storage Tanks and Process Equipments.
8 Supervision of Fabrication and Installation of WELL _ HEAD
Piping along with X - MISS TREE equipments.8 Coating and Wrapping of Line Pipes for Buried pipelines.
June 1999 - Jul. 2000 Worked as Q/A - Q/C CONSULTANT with ENAR PETROTEC at their
PARCO Mid Country Refinery Project in the following Fields of Expertise
1. To Monitor and Control of Quality of Fabrication of Pressure Vessels, Spheres, Steel Storage Tanks as per ASME - API CODES and Standards.
2 Fabrication and Installation of Process Piping Network as per API Standard B- 31.3 and API - B 34.4.
2 Fabrication and Laying of Buried Pipe Lines
2 Coating and Wrapping of Piping and their Holiday Test of Buried Pipe Lines along with their Hydrostatic Test and Pig Launching
Oct. 1997 - Nov. 1998 Worked as SENIOR ENGINEER CONSTRUCTION with MARATHON Construction Co. (Pvt.) Ltd. At their Gas Pipeline Project for Liberty Power and Engro Chemicals Pakistan 850 Expansion Project at Dherki For Following responsibilities: 1 Supervision and execution of Gas Supply Pipe Line Project from Qadir Pur Gas Facility to Liberty Power House (Aprox.29 Km.)
Complete from ROW Preparation to Holiday Test .and dealing all Technical matters with Client and Consultant.
2 -Supervision and Execution of Aces - 850 Expansion Project and completed their following Projects: 3 Erection and Installation of Hydrolyser and Stripper complete with its all its related Piping, Steel Structure, Hydro Static Test, Chemical Cleaning and Steam Blowing of Process Piping
4 Erection and Installation of C2E Gas Compressor along with all its Process Piping, Steel Structure.
Nov. 1998 - 1992 Worked as Project Engineer with Speedways Engineering (Pvt.) Ltd.
At their Jamshoro Power Station Project, for following Responsibilities: 1 Supervision of Erection and Installation of Process Equipments, Process Piping and related Steel Structure for Water Chemical Treatment Plant and Cooling Tower.
2 Blasting and Painting of Storage Tanks, Steel Structure, and Process Piping.
2 Lifting and Placement of 280 ton Generator Stator in Turbine Hall.
May 1997-Sep.1997 Worked as Project Engineer with SEFEC Engineering (Pvt.) Ltd. at their Liberty Power Plant Project, for following responsibilities: Erection and Installation of 200 Ton per day capacity Waste Heat Recovery Steam Generator (HRSG) along with its all Steel Structure, Process Piping, and all axillaries including Hydrostatic Testing of its Process Piping.
April 1992 - April 1997 Worked as Project In charge with M&J Engineering (Pvt.) Ltd. At
Their following Projects: Chirat Cement, Pakland Cement, Saadi Cement
1 Fabrication and Erection of Conditioning Tower, Electrostatic Precipitator, Pre - culcimer, Pre - Heater, Raw Mill, Rotary Kiln, Grate Cooler, and Conveyers., Bawani Metals Ltd.
1 Supervision of Erection and Installation of Aluminum Melting Furnace, Bar Rolling Mills, & Quenching Plant.
Indus Valley Solvent Oil Extraction (Pvt.) Ltd.
3 Supervision of Fabrication and Erection of Steel Storage Tanks, Seed Godown, DE - Linting and Pre - Press Plant, Meal Godown and Produced Oil Refinery.
4 Sand Blasting and Painting of Steel Structure and Storage Tanks.
Siddique Sons Tin Plate Ltd.
5 Erection and Installation of Complete Tin Plate Manufacturing Plant including Rolling mill, Pickling Plant and all its Process Piping Network, Storage Tanks, and a R O Plant For Water Treatment.
P.P.L. KASHMORE
6 Construction of 11 No. of Steel Storage Tanks complete with Fabrication, Erection, Blasting, Internal and External Linings as per API 650 Standards and Project Specifications.
Feb. 1980 - Aug. 1988
Worked as Mech. Foreman with Al-Fadal Maintenance and Operation Ltd. at their Jeddah Oil Refinery and Jeddah AirPort.Projets.
1 Maintenance and Repair of Storage Tanks with Blasting and Painting.
1 Repair and Maintenance of Process Piping Network and Buried Pipelines.
1 Fabrication and Installation of HVAC and Sprinkler Fire Fighting Piping along with Its Equipments.
1 Repair and Maintenance of Static Equipments such as Heat - Exchangers, Condensers, and Tanks.
1978 to 1980 Worked as Erection Superintendent with ICC (Pvt) Ltd at their TPP&- TBS Project for Pakistan Steel
1 Supervision of Erection and Installation of Feed water Pump, Lifting / Placement of Turbine Condenser, Turbine lower half, Installation and alignment of. Rotor, and Turbine upper Half of 110 MW Steam Turbine along with its Process Piping and steel Structure.
!976 to 1978 Worked as Erection Engineer with Mahboob Sons at their Repair shop
Complex and Coke Oven & By Product Complex at Pakistan Steel.
2 Erection and Installation of Heavy Machine Tools at Repair Shop.
2 Fabrication and Erection of Steel Structure, Process Piping, Erection of Two No. of Saturators and Three Nos. Cooling Towers. Along with its Steel Structure.
1973 to 1976 Worked as Supervisor with Peoples Steel Mills Ltd. For following
Responsibilities: 1 Installation and Erection of Re - Heating Furnace, Annealing Furnace,
And Bar Strengthener.
2 Complete Installation and Commissioning of Bar Rolling Mill under Supervision of IHI (Japan) Expert.
1 Metric 1st. Division with Science & Technical Drawing from SARGODHA Board in session of 1968 2 DIPLOMA OF ASSOCIATE ENGINEER in Mechanical Technology From Sindh Board of Technical Education KARACHI. In the session of 1973.
3 DIPLOMA OF ASSOCIATE ENGINEER in Mechanical Technology from Institute of Management and Technology, Quaid - E - Azam campus LAHORE.