Mamoun Abuagla, Senior Project Engineer

Mamoun Abuagla

Senior Project Engineer

wiconnect

Location
Saudi Arabia - Jeddah
Education
Bachelor's degree, IT
Experience
17 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 8 Months

Senior Project Engineer at wiconnect
  • Saudi Arabia - Jeddah
  • My current job since January 2011

Responsibilities:


 Involve in planning, installation, and troubleshooting of PMP, PTP Telecom Site.
 Sites Survey (summarize the result of all sites survey).
 Involve in design (support planing to get the design).
 Calculate the expenses of the project.
* finally commission the project and hand it over for operation

Senior project Engineer at Wiconnect, UAE/KSA at PTP Telecom Site
  • January 2011 to January 2013

Senior project Engineer at Wiconnect, UAE/KSA Jan 2011 - Jan 2013

Responsibilities: * Involve in planning, installation, and troubleshooting of PMP, PTP Telecom Site.
* Sites Survey.
* Involve in design.
* Calculate the expenses of the project.
• Handling VSAT hub installation (teleport and Antenna) with redundancy.

Project coordinator, UAE at KSA
  • Iraq
  • January 2009 to January 2011

Project coordinator, UAE/KSA Jan. 2009- Jan. 2011
Responsibilities: * Single channel with costumer (Mobily)
* Prepare for new project (design, reassures and materials)
* Organized the reassures according to requirement and priority.

project coordinator at wiconnect
  • Saudi Arabia - Jeddah
  • January 2009 to January 2011

Responsibilities:


 Single channel with costumer (Mobily) and our company.
 Prepare for new project (design, reassures and materials).
 Organized the reassures according to requirement and priority.

dispatch the filed engineers

Failed Engineer, Sudan/UAE at KSA
  • Iraq
  • September 2006 to December 2009

Failed Engineer, Sudan/UAE/KSA Sept. 2006 - Dec. 2009
Responsibilities: * Involve in installation.
* Troubleshoot of Power, MW (PTP&PMP) Telecom Site.
* Site Survey.
* Involve in design (PathLoss) and installation of PMP WH


Practical Training:
VectaStar PMP VII-Malaysia-KL June 2009
Training areas: * Site survey
* Safety procedure
* Installation of BS and CPE.
* Configuration
* Design.
* EMS.

Aperto (packetWave & PacketMAX) KSA-Riyadh July 2008
Training areas: * Monitoring
* Installation for (WH and remote site)
* Configuration
* Alarm investigation

Award Solution KSA-Jeddah
Training areas: * Exploring Ethernet backhaul.

VSAT IDirect UAE-Dubai
Training areas: * Configuration of remote and hub.
* Installation of remote and hub as well.

VSAT teleport & Antenna installation and alignment.
Training areas: * Troubleshooting & maintenance for the teleport.
* Installed and align the antenna.
* Installed the teleport.


Skills & Experience Areas:
* Hand on practical experience with PMP VectaStar microwave.
* Hand on practical experience in Aperto WIMAX installation and troubleshooting.
* VSAT experience in HW and RT (installation, configuration and troubleshooting)
* Computer Hardware/Software installation and troubleshoot.
* Familiar with ITU, IEEE and other International Standards applicable to Telecom and IT fields.
* Proven knowledge in mobile Telecommunication Systems GSM, CDMA.

Failed Engineer at WiConnect
  • Saudi Arabia
  • September 2006 to December 2008

Responsibilities:

 Involve in installation.
 Troubleshoot of Power, MW (PTP&PMP) Telecom Site.
 Site Survey.
 Involve in design(PathLoss) and installation of PMP WH

Education

Bachelor's degree, IT
  • at Sudan open university
  • November 2014

i will complete this program ASAP i have 5 courses remaining.

Bachelor's degree, Information Technology
  • at Juba University
  • January 2006

• Bachelor Degree (honors) in (Information Technology) From Academy Sudan University remaining one year for graduate. • Three years diploma in electric and power from Juba University 2006.

Diploma, electrical and power
  • at Juba university
  • January 2006

Languages

Arabic
Beginner
English
Intermediate

Training and Certifications

 Site survey  Safety procedure  Installation of BS and CPE.  Configuration  Design.  EMS. (Certificate)
Date Attended:
January 2009
Valid Until:
January 2009
Exploring Ethernet backhaul (Certificate)
Date Attended:
April 2010
Valid Until:
April 2010
Configuration and installation for remote and hub (Certificate)
Date Attended:
January 2012
Valid Until:
January 2012
Monitoring, installation, configuration, alarm investigation (Certificate)
Date Attended:
July 2008
Valid Until:
July 2008

Hobbies

  • Surfing web.. Free reading about computer, playing Chess, keep fit.