Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
manish salvi, Quantity Surveyor (Civil Engineer)

manish salvi

Quantity Surveyor (Civil Engineer)·Al-Osais Contracting Co

Kuwait

Diploma, Civil Engineering

Work experience

Total years of experience: 6 years, 3 months

Quantity Surveyor (Civil Engineer)

November 2012 - July 2013

Al-Osais Contracting Co

Jubail, Saudi Arabia

November 2012 - July 2013

1. M/s: Al-Osais Contracting Co.: From November 2012 to Till Date

❖ Business Profile: Construction project

❖ Designation: Quantity Surveyor (Civil Engineer)

❖ Job Profile (Role): • BOQ estimation/ Quantity estimation for IFC/Final/Procurement. As per IFC/ Shop& as-built drawings.
• Preparing all required hardcopy/soft copy markups for estimation purpose.
• Submitting IFC/Forecast/Final BOQ to client for their approval, in their required format. With proper calculations, drawings & markups.
• Verifying sub-contractors/suppliers Bill or material Quantity Claimed by invoices.
• Keeping all records of calculation & submittals in soft & hard copy with proper directory structures.
• Cost comparison with respect to contract unit rates &Rates of PO issued.
• Keeping detail logs & all records of Quantity.
• Preparation of Technical submittal document to get Approval of material.
• Preparation of conceptual drawing based on standard drawings available from client for the purpose of proposal BQ.

❖ Software's: • MS Office 2010,
• AutoCAD 2014/2007/2004,
• Excel VBA Programming.

❖ Worked on: ➢ Projects: • JAZAN, Gas oil Project (Proposal)
• RasTanura oil Refinery (Proposal)

Company industry:
Construction & Building
Job role:
Civil Engineering

Asst. Designer

November 2007 - August 2012

Toyo Engineering India Ltd

India

November 2007 - August 2012

2. M/s:Toyo Engineering India Ltd.: From November 2007To August 2012 (4.9Yrs)

❖ Business Profile: HandlingEngineeringProjectas Oil & Gas, Refineries,
Fertilizer, Petrochemical Plants)

❖ Designation: Asst. Designer

❖ Job Profile (Role): • Administrator of QS Teams. Assigning work to QS's. Periodically checking their calculations. Resolving problems in calculation.
• Control & Monitoring complete Proposal BOQ of civil works. Operating Database software's.
• Studying ITB documents (specification & special requirements) . & explain to co-estimators to work with ITB information & requirements.
• Raise query with the help of senior engineer or proposal manager.
• Linking all calculation to the main proposal or project summary.
• Preparing champion BQ & Indices sheet for the review of HOD or senior proposal manager.
• Making general adjustments in proposal summary as per senior's instructions.
• Estimation for Proposal BQ, AFC BQ, Tender BQ.As per standards of method of measurement. TOYO (India) & TOYO (J) . Toyo India / Toyo japan
• BQ Estimation for Civil, Structural, Architectural & Genera Civil work.
• Prepared standard MS Excel templates for the regular use. (Isolated/ spread footing foundations, Trenches', Equipment foundations, Boundary wall etc.)

❖ Software's: • MS Office 2007/2003,
• PARADB (BOQ software for equipment foundation)
• CBQ2006 (Database software for BOQ)
• AutoCAD 2007

❖ Worked on: ➢ Projects: • 5139-SHEL ECC (Singapore) . (IFC BQ)
• 6237-IPNC Panipath Naphtha Cracker Project. (As built BQ)
• 6265-KSRU Sulphur Recovery Unit Project. (As built BQ)
➢ Proposal: • 4705- Indogulf Fertilizers ltd (IGFL)
• 4706- Chambal Fertilizers (CFG3)
• 6260-CCR Regeneration Package GGSR, Bhatinda
• 4658-Cairn Bhogat Terminal
• 4665 -PLDSJ - Dahej Stand By Jetty
• 4668-SRU-IV IOCL Mathura
• 4671-MRPL CDU VDU Revamp
• 4677-Hydrogen Generation Unit-CPCL
• 2269-Crude Stabilization Unit- Oman/EP
• 5150-TIRE
• 2275- TAKREER_BOU
• 4697- ONGC Petro Additions Ltd. (OPAL)

Company industry:
General Engineering Consultancy
Job role:
Engineering

CAD Engineer

March 2007 - October 2007

DFX System Pvt. Ltd

Mumbai, India

March 2007 - October 2007

3. M/s DFX System Pvt. Ltd.: March 2007 To October 2007 (8 Months)

❖ Business Profile: Organization is engaged in Design and drawing
Preparation for Engineering Projects, with clientlikeasAfcons which EPC for projects of RVNL (Rail VikasNigam Limited)

❖ Designation: CAD Engineer.

❖ Job Profile (Role): • Preparing drawings forFormworks. (Bridge girders & columns)
• Estimating quantity for formwork.

❖ Software: • AutoCAD 2004.
• MS Office 2003.

❖ Worked on: • RVNL project. Formwork design & drawing preparation of RVNL bridge's

Company industry:
Business Consultancy Services
Job role:
Engineering

Education

Government Polytechnic, mumbai

May 2006

May 2006

Diploma, Civil Engineering

India

GPA (percentage): 82.64%

GPA (percentage): 82.64%

• Diploma in Civil Engineering from Government Polytechnic, Mumbai (Mumbai University), Passed with 82.64 % (First Class with Distinction)

New English School

June 2003

June 2003

High school or equivalent,

India

GPA (percentage): 70.13%

GPA (percentage): 70.13%

• S.S.C. from New English School, Valang.Passed With 70.13 %. First Class

Skills

AUTOCAD
Expert
AUTOCAD
Expert
DATABASE
Expert
DATABASE
Expert
EXCEL
Expert
EXCEL
Expert
MS OFFICE
Expert
MS OFFICE
Expert

Languages

Hindi

Expert

Marathi

Expert

English

Intermediate