Commissioning Manager
JACOBS
Total years of experience :40 years, 3 Months
from Jacobs(Worley), for 3, 300 MTPD Ma’aden 3 Ammonia Project. The location of the project is in Ras Al Khair, Saudi Arabia.Process is based on TKIS(UHDE, Germany) Ammonia dual pressure technology. Daelim, South Korea is working as
JOINED JACOBS ENGINEERING AS ENGINEERING MANAGER IN NOVEMBER 2018 FOR MA'ADEN AMMONIA 3 PROJECT AS PMC. COMPLETED ENGINEERING ONE MONTH AHEAD OF SCHEDULE AND JOINED AS COMMISSIONING MANAGER.
BEFORE THAT WORKED AS Manager Process and Commissioning Manager for Ma'aden 2 Ammonia project.
Worked as Process and Commissioning Manager for Ma'aden 2 Ammonia project from FLOUR as PMC.
During this period was responsible for Ammonia2 Project basic and detail engineering and later as Commissioning Manager. Helped to get first production one month ahead of schedule.
Later was assigned as Senior Manger Commissioning for Ma'aden DAP project. Commissioned all four units of DAP successfully and in time.
Worley Parsons, Abu-Dhabi, U.A.E.
Worked as PMC Process and Commissioning Manager for Fertil-2 Ammonia /Urea Project. I was posted to UHDE Germany office for Basic Engineering and then to Samsung Korea office for Detail Engineering. Summary of major activities carried out during the various stages of project were as under.
•Managing Basic / Detail Engineering.
•Assist with the HAZOP, SIL, 3-D Model Review
•Review and Approval of P&ID and Plant Layout
•Selection of Major Equipments and Plant Control System
•Assist and Attended FAT, IFAT and SAT
•Managing and Leading the total plant Commissioning Activities of above projects
•Managing Plant Mechanical Completion and Performance Guarantee
Joined to Saudi Arabian Fertilizer Fertilizer company(SAFCO/SABIC) to Commissioned their Ammonia / Urea project IN September 2 as Manager.
Later on was Operation Manager for Safco2 and Safco 3 Ammonia plants. Later was promoted to Senior Manager for Safco-4 and was responsible for 3300 MTPD Ammonia/ 3500 MTPD Urea /100 MTPD Formaldehyde and Utilities(includes 2 150 mt boilers, DM plants, Cooling tower etc.)
Joined GNFC Bharuch to commission their Ammonia/ Urea project in 1980.Later on worked with their Methanol project from ITB stage and then after commissioning that plant was promoted as Manager operation of Methanol plant.
Left GNFC in 1992 to Join SAFCO, Saudi Arabia in 1992.
PROJECT DURING STUDY- ETHYLINE TRICHLORIDE.