Mohamed  Marghany, Resident Engineer PMC

Mohamed Marghany

Resident Engineer PMC

ILF Consultant Engineers

Location
Egypt - Cairo
Education
Bachelor's degree, Civil Engineering
Experience
16 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 9 Months

Resident Engineer PMC at ILF Consultant Engineers
  • Saudi Arabia - Jubail
  • My current job since March 2020

Client MARAFIQ | Royal Commission
Project New Pump Station PS 56A & Force Main Line.
Project Value 145 Million Saudi Riyals.
Ø Construct a sanitary waste water pump station and forcemain line GRP
DI 900&1200 mm in Jubail Industrial City.
Summary of Main achievements & Duties.
1. Client Representative and consultant with all Engineering Disciplines covering a range of
project requirements during Design and Supervision.
2. Full coordination between all disciplines.
3. Manage weekly meeting and monitor contractor's quality procedures implementation
accordance with the Royal Commission Standards.
4. Check and review contractor’s submissions and alternatives solutions.

Construction Manager PMC at ACE Project Management
  • Egypt - Cairo
  • July 2019 to March 2020

Project ICity - Mountain View.
Project value Fifty Billion Egyptian Pound.
Ø Establishing an integrated City on an area of 470 acres consisting of villas, Residential
apartments, landscape and lakes, etc.
Summary of Main achievements & Duties.
1. Responsible for Work Progress, quality and workmanship of every activity.
2. Ensure Civil Construction coordination liaison between design engineering and site
construction teams.
3. This Responsibility is in accordance with the overall targets (Safety, Staffing, Planning,
Quality, schedule, Cost and Delivery) defined for the Project and in line with the functional
requirements and standards set forth by Mountain View.

Sr. Construction Engineer at Arab Designers Engineering Consultants
  • Egypt - Cairo
  • January 2018 to July 2019

AVARIS Mall-Commercial & Administration Complex.
Project value 800 Million Egyptian pound.
Ø Commercial Mall consist of 2 Basement, Ground, 2 Repetitive floors
&Electrical Substation.
Summary of Main achievements & Duties.
1. Review method of statement, shop drawing, ITP's, invoices and all related documents
2. Monitoring site activities to ensure that construction is progressing according to Time
schedules, meet quality standards and comply with statutory and regulatory requirements.
3. Responsible for resolving any issues and problems arising onsite, offering expert advice,
closing out any possible gaps and addressing any unforeseen risks.
4. Completion Skeleton of Mall on time within budget.

Senior Viaduct Engineer at FAST Consortium
  • Saudi Arabia - Riyadh
  • December 2014 to December 2017

Ø Riyadh Metro It is a part of King Abdulaziz's public transport project in Riyadh, It is
considered one of the largest and leading projects in the world.
Ø FAST Consortium, Companies is led by Spanish construction group FCC and includes
partners Samsung C&T, Alstom, Strukton, Freyssinet Saudi Arabia, Atkins, Typsa and
Setec.
Main Achievements
Ø Completion 9.0 km (238 Piers) of Viaduct & Track on time according to the time schedule.
Ø Built some piers in the middle of the two most busy roads of Riyadh - It was all done on
time with zero accident.
Ø Develop and improve Exit 8 in the North Eastern Rring road at Riyadh according to
specifications of MOT
Ø Construct Intermediate Traction Power Substation (ITPS).
Duties
1. Monitoring and Supervise the construction works at Viaduct 6.1 with total length 9.0km with
intermediate Traction Power Substation and coordinating all contractors' activities for
assigned area (from site preparation to Track).
2. Ensures that all construction works are undertaken to required designs, specification,
standards and QHSE (Permits, PPE, Safety Induction, Tool Box Attendance, etc.).
3. Responsible for reporting progress of site works to Site Manager and Coordination work for
traffic diversions.
4. Investigate damage, accidents, or delays at being Construction sites, to ensure that proper
procedures are carried out.

Construction Manager at Saudi Tumpane Company
  • Saudi Arabia - Riyadh
  • November 2011 to November 2014

Project Strategic Execution Of first Phase of the water StrategicScheme.
Client National Water Company.
Consultant TYPSA GROUP.
Project value 150 Million Saudi Riyals.
Main Achievements
Ø Redesign of the project schemes (40 km), choose alternative routes compatible with the
bill of quantities and time schedule on the time limit from the owner.
Ø Implementation and construction of water transmission lines ( DI 300 mm - 1200 mm)
in the west of Riyadh with a total length of 40 km including 250 types of chambers and
thrust boring DI 300 mm below the Western Ring Rroad .
Duties
1. Attend the meeting with all stakeholders and coordinate with all concerned people to meet
project requirements.
2. Evaluation of contractors’ submissions, the preparation of tender analyses reports and
Follow-up to the company's invoices.
3. Supporting the tender process, including the development of responses to tender queries
related to Bills of Quantities and conditions of contracts.
4. Preparation of project time schedules in coordination with the Planning Engineer.
5. Identify problematic design issues and make Recommendations for alternative and cost
effective Re-design solutions.

Civil Project Engineer at Mutlaq Elghewary Company
  • Saudi Arabia - Hail
  • June 2010 to September 2011

Project Completion stages of the water project villages at Hail
Client Water and Electricity Ministry.
Consultant Engineering Consultants Aja Office.
Project value 65 million Saudi Riyals.
Summary of Main achievements & Duties.
1. Implementation transmission lines between villages of Hail (60 km pipeline).
2. Supervising the construction engineering work and provide technical expertise for one or
more of the construction engineering disciplines, as well as survey personnel.
3. Coordinate with traffic, municipality, NWC and with all concerned authorities and Hold
meetings before start excavations work.
4. Prepare invoices and review with the

Construction Engineer at Al-Nasr General Contracting Company
  • Egypt
  • January 2010 to May 2010

Project Dirot west water treatment plant at Egypt.
Client National Authority for drinking water and sanitation.

SITE ENGINEER at SAUDI NESCO GROUP
  • Saudi Arabia - Hail
  • July 2007 to December 2009

Project Rehabilitation of old Hail water supply project.
Client Water and Electricity Ministry.
Consultant Engineering Consultants Aja Office.

Education

Bachelor's degree, Civil Engineering
  • at Assiut University
  • June 2006

Graduation project - Surveying (Excellent).

Specialties & Skills

Infrastructure Projects
Landscaping
Quantity Surveying
Construction Management
CONSULTING
CUSTOMER RELATIONS
BUDGETING
CLOSING
CONTRACT MANAGEMENT
ENGINEERING

Languages

Arabic
Expert
English
Expert
Spanish
Expert

Training and Certifications

Institution of Occupational Safety and Health (Certificate)
Date Attended:
August 2017
PMP (Certificate)
Date Attended:
August 2020
Valid Until:
August 2023