Project Manager / Sustainability Professional
Material Innovation Center
مجموع سنوات الخبرة :7 years, 8 أشهر
- Guided companies on double materiality and created the framework for implementation.
- Prepared reports on non-financial performance of operations that adhere to recognized standards.
- Ensured compliance with sustainability regulations, CSRD and GRI, and executed gap assessments.
- Evaluated the impacts of the company's operations on the environment and society, and how these impacts translated into financial risks and opportunities.
- Reported on the sustainability strategy, translates them into action plans and provides time horizon of completion.
- Analyzed upcoming regulations and disclosures requirements and identifies possible gaps in reporting (CSRD, TCFD, CDP).
- Supported the creation of Signify climate-related risks assessment roadmap and ESG action plan.
- Contributed to the collection validation, analysis, and visualization of climate risks data .
- Cross-disciplinary coordination on a daily basis with Urban Planners & support engineers (road design, utility, hydrology engineers) ensuring final designs comply with regulations & quality standards.
- Creates standards for all visuals with computer-aided design (CAD) software.
- Assist in the preparation of conceptual, preliminary & detailed urban designs, site layouts & supporting materials (reports, maps, drawings) for master planning & urban development projects.
- Increases efficiency of work by 20% through different organizational strategies.
- Performed quality control reviews on files received from planners (structural plan, detail planning…).
- Works on data collection, analysis, & investigations of parcels & properties for different expropriation/affection studies.
- Setting up primary and distribution substation locations.
- Compiled the electrical grid plan report detailing CAPEX & OPEX, & corridor implications of each HV layout.
- Responsible from the design development stage & construction drawings till the project handover.
- Lead brainstorming sessions to organize clients’ ideas & turn them into a concrete design.
- Developed complex technical designs to ensure an exemplary solution is delivered that meets quality parameters, project timelines & budgetary requirements.
Projects:
- Numerous Residential apartments from design to construction phase.
- International College (Ain Mrayseh): Entrance Re-Design, Alumni Offices Re-Design, Administration Re-Design, Steam Lab for both Campuses, as well as some Graphic Design Projects
- Extract precast element quantities from construction drawings
- Draft installation accessory detail for precast elements
- Take on-site as built measurements in order to prepare shop drawings
- Draft as built Shop drawings and cutting lists for precast item production and installation
- Prepare production orders for precast elements
- Synchronize production schedule with client needs and site progress
- Ensure that dimensions and specifications of production orders to be in compliance with drawings
- Monitor installation QA/QC
- Monitor progress of the production/installation on site to be in compliance with shop drawing plans and project deadlines
- Synchronize and supervise third party sub-contractors.
- Performed technical review & created architectural drawings to support constructions projects.
- Coordinated between suppliers & engineers in order to complete works in a timely fashion; Directed & supervised over 15 employees.
- Improved schedule of material & equipment purchases & delivery by 20%.
- Suggested a new tactic to managing all employees, resulting in a 15% increase in productivity.
- Ensured that all works are completed on time & within agreed budgets, as well as all works are in accordance with drawings & specifications.
- Prepared BOQs & Architectural drawings for multiple projects.
- Worked between the office and 2 construction sites (main: One Oak - Marfaa Solidere,
Sursock Yards - Achrafieh).
- Made sure that the Payment Request Forms are done precisely with the required
documents attached
- Prepared templates reflecting the comparison between the original quotation and the VO
proforma. As well as templates of cost estimation of the VO of the client.
- Worked in tandem with suppliers and engineers to coordinate design development and
construction documents.
- Adapted plans according to circumstances and resolved any problems that may arise
during construction; prepared shop drawings of these modifications on site to get the
approval of the concerned interior architect.
- Conducted and documented field observations to monitor progress of construction.
- Helped to monitor the flow of development activities to ensure completion of architectural
work for new construction projects through regular worksite visits.
- Interpreted and explained plans to administrative staff, suppliers, and clients.
- Performed Quantity Surveying (Assessments and cost preparation of internal finishes).
“Beirut Terraces” Site by Herzog & De Meuron - Downtown, Beirut
- Conducted daily Site Inspections (Blockwork, Tiling, Waterproofing, Door Installation...)
- Reviewed architectural documents for potential conflict with other disciplines
- Corrected Shop drawings and validated their implementation
Designer, Journalist of the First issue of the LAU Architecture Magazine - a Student Publication. 2014
–