Project Controller في Salini Impregilo
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ يناير 2015

Project Controller for Salini-Impregilo for Etihad Rail Project Stage 2 Package C & F (Abu Dhabi). In this position my work is aimed at completing the first revision of the budget and the first step of deliverables to be submitted after the Project’s Commencement Date.

Planner for Tender Department في Salini Impregilo
  • الإمارات العربية المتحدة - دبي
  • يناير 2014 إلى ديسمبر 2014

My task was dedicated to preparing Gantt & time chainage programme of works and cost analysis for several Tenders in GCC Countries. Amongst the submitted tenders I was involved with: Sheikh Jaber al Ahmad Al Sabah Causeway - Doha Link -RA/214 (Kuwait), Construction of New Road from Industrial City in Musaffah to Hamin Intersecrion at E-11 (Abu Dhabi), Design and Construction of Main Trunk Sewer (Contract MTS-03 & MTS-02) (Doha), Comprehensive Improvement of The Parallel Roads (Contract R881-2A1) (Dubai).

Cost Controller في Todini Costruzioni Generali
  • الإمارات العربية المتحدة - دبي
  • نوفمبر 2012 إلى ديسمبر 2013

The firm’s assignment was the realization of ramps and bridges (Lot 881/3A) in Dubai. My job was mainly focused on preparing cost control reports and budget monitoring. In this position, my assignment was also to control the project execution and assess measures to recover cost/time.

Planner and Cost Controller في Toto Costruzioni Generali
  • إيطاليا
  • مارس 2008 إلى نوفمبر 2012

The firm’s assignment was the realization of a new stretch of the Highway. The project (worth around 400M€) includes the excavation of 4 tunnels with an overall length of about 11, 200 m, 2 viaducts with an overall length of 2, 000 m. Around 5.000 m of the Sparvo Tunnel are being excavated with the Herrenknecht S-574 EPB TBM (diameter of 15.62m) currently the world’s largest earth-pressure-balance (EPB) TBM.
My task in the jobsite was the planning -thus monitoring- of the works, in particular, I gainied experience in assessing: time, manpower and cost of mechanised tunnel boring, along with the traditional traditional tunnel boring technique.
Part of the job involved cost analysis and budgeting, including -on a monthly basis- preparing budget tracking reports.
As planning software I use mainly Primavera, occasionally MS Project.

Planner في Todini Costruzioni Generali
  • إيطاليا
  • نوفمبر 2007 إلى فبراير 2008

This was a tunnelling project along the main Italian Highway (A1: Bologna-Firenze). The project, worth around 600 M€, comprises 18 km of tunnels and several viaducts. My task was to prepare the program of works (Gantt with Primavera Project Planner) and, on a monthly basis, schedule it in order to track the progress and forecast problems.
During my stay in the Company I spent a month on the assignment: Comprehensive Improvements of the Parallel Roads PROJECT R881/3A CONTRACT 3A in Dubai (worth around 450M AED). My job there consisted in defining the initial planning of the works the Client -Parsons for RTA- required after the contract assignment.

Hydraulic Engineer في ACEA LaboratoRI SpA
  • إيطاليا
  • يونيو 2007 إلى أكتوبر 2007

This assignment was aimed at designing aqueducts. In this role I make the hydraulic calculation and through the software WaterCAD assess the project scenario on the pressure pipe network.

Planner في Salini Nigeria Ltd
  • نيجيريا
  • يوليو 2006 إلى أبريل 2007

Construction site Development of Idu Industrial Area (Abuja -Nigeria). This project was aimed at building more than 20 km of industrial roads with 8 bridges, deep drainage and sewerage system, electrical and hydraulic facilities.
I prepared the site program of works through the software Primavera Project Planner (after a training course in this project management software) .
I had the task of constantly updating the program in order to give an understanding of the actual vs. planned. I also managed the local/foreign purchase of basic materials (steel, cement, etc…) according to the planned activities. I personally oversaw some local subcontractors of minor activities.

Junior Engineer في Salini Costruttori S.p.A.
  • إيطاليا
  • سبتمبر 2005 إلى يونيو 2006

In this construction Company I manage the site requirements in order to expedite and optimize the supply of machinery, spare parts and equipments not available locally. Among these tasks, and in liaison with external consultants, I assess project reports sent by the site.

Engineer Junior & Ph.D Student في Various
  • إيطاليا
  • يناير 2002 إلى أغسطس 2005

After graduating from civil engineering I worked part time as junior designer in several technical offices while completing my Ph.D in the Italian Ministry of Environment

الخلفية التعليمية

دكتوراة, Ph.D
  • في Ph.D in Environmental Impact Analyses
  • يناير 2005

Ph.D. in Industrial Engineering from the Faculty of Engineering of Perugia. The research was carried out at the Italian Ministry of the Environment.

ماجستير, M.Sc in Civil Engineering
  • في University of Roma Tre
  • يوليو 2001

M.Sc Degree in Civil Engineering from the Department of Hydraulics at the University of Roma Tre (110/110 cum laude). The final thesis investigated and assessed the risk of inundation in Rome.

Specialties & Skills

Microsoft Excel
Microsoft PowerPoint
Reporting
Site Engineering
Primavera
Primaver
work in team

اللغات

الايطالية
متمرّس
الانجليزية
متمرّس
الفرنسية
مبتدئ

العضويات

Member of UAE Society of Engineers
  • N/A
  • April 2013
Member of Italian Society of Civil Engineers
  • N/A
  • March 2002