Senior Mechanical Technician
SABIC Petrochemicals\saudi arabia with jal hr company
Total years of experience :15 years, 8 Months
Maintenance for rotary equipment with auxiliary system and
alignment.
Regular monitoring, disassembly and repair
Overhauling air compressor KOBELCO multistage integrally gear
Overhauling mixer for extruder and water end replaced bearings
Overhauling Gear Reducer for melt pump
Nitrogen compressor is a vertical two stage reciprocating
compressor kobelco 2 stage and 4 stage vertical overhaul and
screw
Steam turbine Coppus RLA single stage Overhauling and trip valve
Catalyst Feeder Overhauling for Reactor
Air coolers (fin fans) induced and forced
Rotary valves, Rotary Feeder, Diverter Valves, Blenders, Classifier,
Agitators,
Augers, Air conveying systems, also worked on Extruder for
replacing Die plat and alignment
PLATE & CUTTER, Screen Changer & related work.
Cycle gas compressor and cycle gas cooler turn around
Pumps such as SNM .EPARA.SUNDYNE, different model
LMV322/LMV311).and NIKKISO
Conduct weekly Safety toolbox meetings
Maintain required record keeping system and provide adequate
documentation on occupational monitoring activities.
Secured and renewed specific permits for plants and other specific
works such as lifting permit, hot work permit, lock out/tag out
permit, confined space entry permit.
Two Turbo Generator 2 X 16 MW “Steam Turbine General Electric
Three Turbo pump for BFW “KSB pump driven by Dresser steam
turbine
Two steam turbine “Elliott “to derive FD fan & ID Fan “CBI “
Assemble Rotor, Stator and End Shield with hydrogen seal for GE
Generators and diesel mechanic
Nat Gas and SYN Gas Compressor “Siemens “
MAN Turbo train supply air for ASU “condensing Steam turbine with
MAC 4- stage overhaul single shaft compressor & BAC vertical
Compressor.
Process and utility pumps “John Crane - Weir Gabionade “pumps
maintenance
Centrifugal Pumps Single & Multi Stages, Sun dyne pumps different
model LMV322/LMV311).
Work in catalyst module saver dryer
Repairs of heat exchanger both floating head and fixed heat
Exchanger test ring
Removed the bundles both in U-T Tube Exchanger
Replaced of the bundle, floating and fixed head Gasket
Worked furnaces. Reformers vessels and replace demisters
Working in distillation Towers).topping column, refinery
Installation and Maintenances
maintenance and testing for boilers
Maintenance and testing for all of valves
Liquid fuel, water injection, water wash and hydraulic systemof
diverter dumper)
Support GE commissioning team at alignment and test of accessory
Module, liquid fuel atomizing air compressor gas separator and gas
scrubber
Participated plant pre commissioning and start up tow TAM
Position: Mechanical Technician
Duration: 20/9/2013 to 9/10/2013
Company: ALzzawiyaoil Refining Company ( Libya ) shutdown
4. Company: MIDOR ( Middle East Oil Refinery company)
From 1/8/2009 to 23/8/2009 shutdown
5. Company:UHDE(pdh / pp, project - port Saied) polypropylene
From 3/3/2009 to 25/7/2009 construction
6. Company:SIDPEC (Side Krir Petrochemical Company- Ethylene olefins
From 6/1/2009 to 28/1/2009 shutdown
7. Company:ELAB (Egyptian liner alky benzene)
From 7/9/2008 to 9/12/2008 commissioning
8. Company: O.P.C.(Oriental Petrochemical Company) reaction area
From 1/8/2008 to 28/8/2008 shutdown
9.Company :VENUS (a Free Zone Grain Circulation and Marin Service)
From 1/2/2008 to 30 /6/2008 shutdown gear boxs
10.company:AF (Ale 10.alexxandria Fertilizer Company- Ammonia unite)
From 5/8/2007 to 25/8/2007 shutdown
11Company: .MOPCO (Misr Fertilizer Company- Ammonia unite)
From 7/6/2007 to 28/6/2007 shutdown
12. Company:HFC (Helwan Fertilizer Company - Ammonia unite)
From 1/3/2007 to 9/4/2007 shutdown
13 Company:.ELNG (Egyptian natural gas) Idco
From 28/8/2006 to 20/9/2006 shutdown
14.Company:ANRPEC (Alexandria national refinery and petrochemical company)
From 1/11/2003 to 7/7/2005
15.company: APC (Alexandria Petroleum Company)
From 7/6/2003 to 25/10/2003 turnaround