مازن  عمد, QA/QC Manager

مازن عمد

QA/QC Manager

CCC, BACS Riyadh Metro Project (Bechtel, Almabani, CCC and Siemens Consortium)

البلد
فلسطين - الضفةالغربية
التعليم
ماجستير, Electrical Engineering
الخبرات
34 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :34 years, 3 أشهر

QA/QC Manager في CCC, BACS Riyadh Metro Project (Bechtel, Almabani, CCC and Siemens Consortium)
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ سبتمبر 2017

PROJECT SCOPE of work on Lines 1 and 2 encompasses detailed structural, architectural, electrical, mechanical, BMS, SCADA and transit system design together with construction, procurement of all products and materials, integration, testing and commissioning works and all the necessary support for project delivery.
• Submit reports to the Project Controls Manager, on the performance of the self-executed and subcontractors under their remit for inclusion in the monthly report.
• Manage, coordinate and supervise QC Engineers / Inspectors on the project.
• Initiate, review, approve and maintain, as applicable, quality control procedures, inspection testing procedures and plans.
• Supervise the first line inspection and test of constructed assets in accordance with approved Inspection and Test Plans.
• Plan and coordinate with the QC Engineering team on a daily basis to allow for advance planning of the necessary inspections and testing for project activities in their particular section.
• Monitor closely the ongoing work activities under their control and make sure that works are completed in accordance with the approved shop drawings and specification
• Undertake independent inspections and tests to sample the works and the materials being brought to site and BACS store to verify compliance with the obligations of the contract.
• Act as liaison between the Employer, Field Engineering team, Subcontractors QC team and the QC team for the establishing and coordination of inspection activities.
• Manage all quality control staff and activities validating work is completed in accordance with project specifications, to the required quality standards and within prescribed timeframes including the allocation and mobilization of resources and the monitoring of use.
• Attend meetings with Employer, Construction Team, Subcontractors as the Contractor representative on matters relating to quality control.
• Perform inspections and audits of completed records & works and to confirm that they are complete.
• Report Non Conformances identified (NCRs and CRs) within their section of the works as per the project Control of Non-Conforming items procedure.
• Attend factory acceptance tests with owner representative and provide comments, recommendations and sign approvals.
• Identify, and implement, areas of preventive action that will improve quality control on the project.
• Prepare Inspection and Test Plans for work activities and review subcontractors ones in MEP field as per the project Field Inspection and Testing Procedure.
• Share "lessons learned" with relevant persons on the project team.
• Monitor non-conformance system for identification, control and rectification of all nonconforming Items.
• Establish the system for collection, indexing and filing of all QC records required for certification.
• Provide Quality toolbox talks to project staff within their section on a biweekly basis and to their area requirement.
• Assist with the determination of suitable correction, corrective and / or preventive action to address identified Non Conformance on the project.
• Collate and issue Quality Concerns for further analysis, quality performance data as required by the established metrics for the project.

QA/QC Manager في PROGER spa
  • المملكة العربية السعودية - الرياض
  • يونيو 2014 إلى سبتمبر 2017

Consultant - CM (Hired to work on KAP3, engineering consultancy services of design review and construction supervision of some 3, 400 buildings on 600 sites across Saudi Arabia for the implementation of His Highness the King of Saudi Arabia's Security Headquarters Development Project. Value; Works 2, 4 billion EUR, services: 180 million EUR, Buildings: 3, 400, Sites: 600 and Professionals: 800)

Key Responsibilities:

• Preparation and issuance of project Quality Plan, QA/QC processes and procedures in compliance with company and client's quality requirements.
• Performs QA audits (internal and/or external), reviews, surveillances and follow-ups.
• Verification and validation of the effective implementation of the quality plans by means of surveillance and audit of project activities and the associated records.
• Create, update and maintain all project submittal platforms and all other project specific quality control reports.
• Manage and delegate tasks to a team of site quality control engineers.
• Manage and control quality system requirements for the project, develop and maintain requirements of inspection and testing quality control in order to achieve consistent product quality and standard of workmanship
• Support the review of Electro-mechanical shop drawings and submittals for conformance with project specifications by assisting the technical department manager with reviewing submitted documents, and by leveraging the knowledge and experience of others in the project team when necessary.
• Provide technical support to Construction Team, identify and communicate product quality requirements / relevant standards to maintain consistency of product quality.
• Create and improve quality awareness within the organization; and identify areas for improvements.
• Manage the non-conformance process for effective resolution and process improvement, the formal review and approval, of all participating parties with regards to quality assurance and quality control.
• Supports implementation of appropriate corrective action to quality issues (internal and Contractor's)
• Provides input on projects performance metrics, and improve process and procedural of system.
• Identifies and reports to the Program Director on quality issues or trends based on data from a variety of sources
• Advise on the stoppage of work if necessary to resolve matters that affect safety, quality and/or inhibit the logical progress of work.
• Coordinates Lessons Learnt process for the Project.
• Develop a quality & inspection program that meets the provisions of the Operations & Maintenance Activity at project closure phase.
• Assist in assembling and forwarding project closeout documents that include O&M manuals and as-built.

QC Manager في CDM Smith
  • فلسطين - رام الله و البيرة
  • أبريل 2013 إلى يونيو 2014

Contractor - EPC (Hired to work on Well Flow Monitoring SCADA Project for 48 potable water wells located at sites throughout the West Bank and transmission of the flow monitoring data to a DATA CENTER (Central Control Building) including Radio Communication System, Well Sites Mechanical & Electrical Systems, Site PLCs & RTUs, SCADA Server Building)
Key Responsibilities:
• Prepared estimated project budget of $8 million USD for the project.
• Developed and oversaw QA/QC program implementation; analyzed and audited quality throughout project; reviewed drawings, materials, documentation and site to ensure international quality standards were met.
• Delivered project two months ahead of schedule despite problems with original design; collaborated with team on developing solutions that kept project on time and maintained required levels of quality.
• Led QA department staff of five; monitored work performance and guided in project completion.
• Orchestrated RFP process; directed team in identifying suppliers and sourcing materials.
• Discussed non-conformance reports with manger and implemented “fixes” according to QA/QC plan.
• Created and implemented testing, start-up, commissioning and training plans.
• Reviewed processes of quality control systems and refined accordingly to increase efficiency of operations and ensure project met milestones.
• Delivered QA/QC reports to senior management.

Head QA/QC Manager في IRD (International Relief & Development
  • فلسطين - رام الله و البيرة
  • أكتوبر 2011 إلى فبراير 2013

Contractor ( Hired to work on Three projects funded by USAID, Drilling and Pump Testing of Four (4) Water Supply Wells of Depths up to 1000m, Well #17 Pump Station and Conveyance System and Al Jaba’ Nuba Main Transmission Pipeline.)
Key Responsibilities:
• Developed and oversaw QA/QC program implementation; analyzed and audited quality throughout project; reviewed drawings, materials, documentation and site to ensure international quality standards were met.
• Prepared estimated project budget of $14 million USD for Well #17 Pump Station and Conveyance System.

• Delivered project two months ahead of schedule despite problems with original design; collaborated with team on developing solutions that kept project on time and maintained required levels of quality.
• Led QA department staff of five; monitored work performance and guided in project completion.
• Orchestrated RFP process; directed team in identifying suppliers and sourcing materials.
• Discussed non-conformance reports with manger and implemented “fixes” according to QA/QC plan.
• Created and implemented testing, start-up, commissioning and training plans.
• Reviewed processes of quality control systems and refined accordingly to increase efficiency of operations and ensure project met milestones.
• Delivered QA/QC reports to senior management.

Qa/Qc Manager في MWH Americas Inc. (Montgomery -Watson - Harza),
  • فلسطين - رام الله و البيرة
  • أبريل 2009 إلى أغسطس 2011

• Prepared design for: new facilities, rehabilitation of existing eater pipe lines, construction of New Buildings, upgrade the 33KV, 3.3KV and 400V electrical systems, low current electrical systems, booster and deep Well pumps, water surge protection system, power panels and MCC’s, buildings MEP Systems ( Lighting, AC Systems, Earthing, Fire Alarm, Lightning Protection, etc), instrumentation, control system, PLC & SCADA Systems.
• Coordinated with US based Engineering and LEED teams in the review of the design.
• Verify the accuracy of Prices and Quantities included in the Contract Documents for MEP work
• Collaborated with Client in expediting all critical aspects of site development and building construction,
• Assisted Contractor with local utilities - sanitary waste, storm, natural gas, domestic water and irrigation water systems work permits, witnessing and inspections, and documentation such as permitting, coordination, and start-up procedures on all aspects of tie-in work for new equipment, connections, or additions to existing systems.
• Reviewed all contractor submissions, i.e. work method plans, materials, shop drawings, etc.
• Provided leadership to the Contractor in the construction of the project through technical expertise and diplomatic persuasion.
• Prepared and delivered status updates and construction reports to Construction Manager.
• Resolved issues associated with project and ensured project met designated milestones.
• Witnesses contractor’s quality control inspections to ensure that the permanent works are constructed per the applicable codes, standards, and approved drawings and specifications, Inspected materials, completed work, issued site instructions and memos.
• Witnessed all testing, pre-commissioning, commissioning, and start-up activities to assure contractor’s compliance with the approved plans and procedures. Reviewed tests results generated by the independent test agencies, and approveg those complying with the specification requirements.
• Review cost proposals and applications for payment submitted by the Contractor for Mechanical work. Verifies that mechanical items submitted for invoice billing or Work Estimates are justified. Determines percentage of work completed for mechanical trades and design disciplines.
• Performed conceptual and detailed estimates of potential changes to the project’s work.
• Led weekly progress meetings with various stakeholders.
• Initiated and prepared for PM’s or CM’s signature on MEP related letters, memos and correspondence.
• Enforced site safety and HSE plan.
• Oversaw pumping station system final testing, final commissioning and hand over.

Construction Manager في Future Iron Pipes LTD
  • فلسطين - الضفةالغربية
  • نوفمبر 2008 إلى أبريل 2009

• Recruited to manage construction of large scale 9, 961 square meter factory of Steel Pipes, PE Coating and internal cement lining of Steel Pipes.
• Liaised between owners, authorities, factory equipment manufacturers, suppliers and utilities.
• Orchestrated schedule of contractors to ensure project stayed on designated timeline.
• Selected materials and equipment; identified sub-contractors and procured resources.
• Ran all checks on equipment compatibility, functionality and interactivity; directed and oversaw equipment installation, final testing and commissioning.

Project Manager في Saqqa and Khoudary General Contracting Co. (SAK).
  • فلسطين - الضفةالغربية
  • أغسطس 2007 إلى أكتوبر 2008

Project to Credit:
• Package 4C - West Bank Water Resources Program, Eastern Hebron Bulk Water Supply Project
The project was designed to improve quality/quantity of drinking water in the Southern West Bank and was funded by USAID. It includes the construction of 2 new well pumping stations, 2 new booster pumping stations, water transmission pipe lines, 33KV power overhead line, 33KV underground power line, 1 reservoir and 1 power substation of 33KV.

Key Responsibilities:
• Conceptualized/designed electrical/mechanical systems for the project, reviewed construction processes and conducted value engineering exercise.
• Monitored project operations of Power Distribution System, Instrumentation and Control System, utilizing PLC and SCADA Control Systems.
• Supervised/controlled the activities of workforce under purview, executed designing, maintenance, programming, troubleshooting, installation and commissioning of Main Water Pipe Lines, Water System Surge Analysis, Valves/Operators and conducted Hydrostatic and Leakage tests.
• Handled the whole gamut of activities including supervision, programming, testing and commissioning of sanitation/drinking water networks/pumps, HVAC Systems, etc.
• Explored a schematic layout in view of key quantifiable parameters encompassing estimation of takeoff costs, reviewing project constructability, scopes of work, sub-contracting requirements, project profitability and scheduling.
• Scrutinized project inception plan and coordinated all process/functions with construction managers, supervisors, planners, quantity surveyors and workforce. Liaised with client representatives, consultants, architects, engineers and surveyors to provide timely deliverables.
• Appraised quality standards, safety measures on the site and ensured that all operational regulations are adhered to.
• Tracked/controlled project schedule and associated costs to accomplish project completion within allocated time/budgets.

Resident Engineer في CH2M HILL INT.
  • فلسطين - رام الله و البيرة
  • ديسمبر 2004 إلى فبراير 2007

Project to Credit:
• Package 4B - West Bank Water Resources Program, Eastern Hebron Bulk Water Supply Project, Phase 3
The project was funded by the USAID, and was designed to improve water resources in the West Bank by constructing 2 new well pumping stations, 2 new booster pumping stations, water pipe lines, 1 power substation, 33KV power overhead line (30 Km), 33KV underground power line(100)km and 1 reservoir.

Key Responsibilities:
• Steered the instrumentation/electrical processes for construction projects, monitored key performance indicators and implemented continuous amendments to the maintenance work.
• Administered various elements of the maintenance program, including PLC, Instrumentation/Control system, SCADA system, etc. and analyzed device calibrations as well as spare parts availability.
• Interfaced with operators, mechanics, vendors, contractors, management and other groups to meet project objectives. Constructively resolved conflicts among the project team thus fostering their cooperation/collaboration.
• Streamlined procedures, equipment tools and evaluated project overview for testing/commissioning of high, medium/low voltage power systems/networks, Overhead Lines, Underground Cables, Switchgear, Transformers, Distribution Stations, etc.
• Oversaw the functioning of Instrumentation/Control Systems to verify the maintenance of water stations piping/pumping, Main Electrical Networks, Main Electrical Distribution Stations/Substations.
• Ensured compliance to environmental, safety and health requirements thus promoting a secured working environment. Managed quality activities at site, including supervision of QC/QA inspectors/administrators.
• Accountable for execution of quality contract management system at site and specific project quality control plans.
• Coordinated with the site QA/QC team to ensure deployment of inspection/surveillance program. Submitted project quality reports to senior management.

Lead QA/QC Electrical Engineer في Camp Dresser & McKee Incorporated (CDM).
  • فلسطين - رام الله و البيرة
  • ديسمبر 2003 إلى ديسمبر 2004

Project to Credit:
• Environmental Health Project (EHP) - Task Order 804
Funded by USAID, the program was intended to provide safe/sustainable water and sanitation services to rural towns and Task Order 804 was for engineering designs.

Key Responsibilities:
• Envisaged engineering designs for the construction of restructured Pump Stations, Water Systems, Waste Water Treatment Plans(WWTB) and Sanitation Systems, assisted in the establishment of site EH&S plan and monitored all aspects of EH&S at site thus promoting project maintenance/operations.
• Analyzed/executed project requirements and reviewed projects to monitor compliance with safety codes and company policies/procedures. Resolved any unexpected technical difficulties, identified bottlenecks and effected systems reengineering.
• Engineered construction/maintenance of structures and perpetuated maintenance/commissioning of computer networks, fire systems, security systems, etc.
• Ascertained apposite construction means/methods and optimal cost effective plans/schedules. Oversaw the selection and requisition of materials for use in construction, quality control and safety matters on the site.
• Supervised, executed and authorized critical pre-inception surveys of existing / proposed infrastructure, with associated modalities pertaining to project construction and maintenance.
• Assured clear channel of communication between various participating contractors and sub contractors to negotiate contracts, ensure strict adherence to quality standards, deliverables, schedules and budgets.

QC Electrical and Instrumentation Engineer في Contrack International Inc.
  • فلسطين - بيت لحم
  • أبريل 2001 إلى نوفمبر 2003

Project to Credit:
• West Bank Water Resources - Program 2
The project funded by USAID was designed to provide a reliable source of clean water across the West Bank and Gaza. It included construction of 4 pump stations, drilling deep wells and 5 power pump stations.

Key Responsibilities:
• Spearheaded the overall department activities like quality control techniques, quality assurance, inspection, testing and commissioning of electrical systems.
• Interacted with production department to ensure compliance of QA/QC structures. Proffered overall technical support during construction processes of pumping stations, drilling deep wells and installing high-pressure transmission lines, thus galvanizing service.
• Assessed suppliers’ bids in view of company's QA standards and analyzed safety inspection report. Enforced waste water control measures and supervised sample analysis.
• Presented monthly data of project performance parameters, along with O&M manuals, to the senior management to eliminate bottlenecks in maintenance. Notified possible avenues of improving the process / safety procedures.
• Directed daily QA staff activities/needs, interfaced with project work teams and acted as facilitator / coach in areas of quality control techniques.
• Preparing O&M Manuals and Trainingof Technical Team Training

Other Professional Experiences: في Others
  • غير ذلك
  • يوليو 1989 إلى مارس 2001

Other Professional Experiences:
Jul 95 - Mar 01: Center for Engineering and Planning, Ramallah Construction Manager and Senior Electrical Engineer
Projects to Credit:
Falcon Project
• The project included construction/rehabilitation of 12 telecommunication centers in West Bank and Gaza Area and was supported by Lockheed Martin Corporation.

Water Projects
• Ein As-Sultan Irrigation Rehabilitation Project
• Ein As-Sultan Refuge Camp Water Distribution System
• West Bank Municipal Services Project-Water Resources Program
• Khan Younis Water Supply and Distribution Master Plan

Public Sector Buildings
• Construction of School Facilities for Basic Education in the West Bank - Japan International Cooperation Agency (JICA)
• Extension of School Facilities in the West Bank - UNDP
• Awdah Housing Project

Private Sector Buildings
• Jericho Resort Village
• Palestine Securities Exchange
• Palestine International Bank
• Commercial Bank of Palestine
• Ministry of Economy-Trade-and Industry

Apr 94 - Jun 95: Jerzeem Trading & Contracting Ltd., Nablus, Resident Engineer
Projects to Credit:
• Tammimi Petrol Station
• Jordan Bank
• Cairo Amman Bank
• Zalmut Building
• Palestinian Housing Council Projects

Mar 93 - Mar 94: Modern Consultant, Amman, Jordan, Junior Electrical Engineer
Projects to Credit:
• Al Zarqa Industrial Zone
• Al Aqaba Industrial Zone
• Group of Private and Public Sectors Schools

Aug 92 - Feb 93: Busileh Trading & Contracting Ltd., Amman, Jordan, Resident Engineer
Projects to Credit:
• Queen Alia International Airport
• Ma’an Stadium
• Al Basheer Hospital

Jul 89 - Jul 92:
Junior Electrical Engineer
Zuhdi Karageh Engineering Office,
Amman, Jordan

الخلفية التعليمية

ماجستير, Electrical Engineering
  • في University of Jordan
  • يناير 1994

Other Professional Courses/Trainings: • Project Management, Al Offuq Institution, Nabulus, Palestine (February 1995) • Power Flow and Power Distribution (1995) • Electronics (1994)

بكالوريوس, Electrical Engineering
  • في University of Jordan
  • يونيو 1989

Specialties & Skills

Instrumentation
Inspection
Commissioning
Rehabilitation
Inspection /Installation/ Programming/Troubleshooting of Mechanical Systems,Operations & Maintenance
Implementation of Electrical/Instrumentation Systems, Turnkey Commercial Works,Engineering Resources
Project Management,Project Constructability Reviews,Construction Management,Contract Administration
IT Related Skills – MS Office Applications & Internet Usage
Onsite Engineering,Maintenance & Commissioning of Electro Mechanical Equip.,Performance Evaluation
Project Management Softwares: Microsoft Project, Primavera, Computer Languages: C++, Basic, AutoCAD
Client & Supplier Contractual Negotiations, Project Profitability, Scheduling, Critical Path Mgmt
Project Designing, Commissioning of Drinking Water Networks and Pumps, HVAC Systems,Security Systems
Quality Planning, Establishing Standards, Gauge Design, Maintenance of Electrical Equip., Q/A, Q/C
Coordination & Development, Training & Recruitment, Performance Review, Motivational Skills
Communication, Leadership, Analytical, Interpersonal,Team Building & Creative Problem Solving Skills
Operation and Maintenance Management of Electromechanical Systems, utilizing CMMS Systems.
Project Designing, Commissioning of MEP Sytem of Buildings(Residential, Commercial, High Rise, etc).
Preparing of Electromechanical Systems O&M manuals, and training technical teams

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

Jordan Engineers Association No. 4912
  • Engineer
  • June 1989

التدريب و الشهادات

OSHA Construction Industry Safety and Health Standards Course (الشهادة)
تاريخ الدورة:
April 2017
صالحة لغاية:
April 2019
ISO 9001:2015 Internal Auditor course (الشهادة)
تاريخ الدورة:
May 2017
صالحة لغاية:
May 2019
ISO 14001:2015 Internal Auditor course (الشهادة)
تاريخ الدورة:
May 2016
صالحة لغاية:
May 2018
Total Quality Management (الشهادة)
تاريخ الدورة:
May 2015
صالحة لغاية:
May 2018
Testing and Repair of Electronic Systems (تدريب)
معهد التدريب:
Arabia Technical Training and Computer - POTOCOL.
تاريخ الدورة:
August 1994
Construction Project Management (تدريب)
معهد التدريب:
Horizon Institute
تاريخ الدورة:
April 1995
SCADA and Programmable Logic Controllers (PLCs) (تدريب)
معهد التدريب:
Hisham Hijjawi College
تاريخ الدورة:
February 2001
PMP Course (تدريب)
معهد التدريب:
AMIDEAST
تاريخ الدورة:
November 2011
Study & Analyse Load Flow in Electrical Systems and Power Distribution Networks (تدريب)
معهد التدريب:
Jordan Engineers Association
تاريخ الدورة:
March 1995
Primavera P6 Project Management (تدريب)
معهد التدريب:
Al Najah University
تاريخ الدورة:
December 2006