Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Md Mosharraf Hossain, Project Engineer

Md Mosharraf Hossain

Project Engineer·Saudi Aramco

Saudi Arabia

Master's degree, Mechanical Engineering

Work experience

Total years of experience: 14 years, 8 months

Project Engineer

August 2013 - March 2014

Saudi Aramco

United Arab Emirates

August 2013 - March 2014

Saudi Aramco, Dhahran, Saudi Arabia, 08/2013 - Present
Project Engineer
• Responsible for initiating Bid package for new project
• Responsible for managing engineering and construction contractors
• Responsible for managing offshore projects comprising pipeline, cable, tie-ins, topside structures, and instrumentation.
• Experience in offshore pipeline construction that includes welding, inspection, and installation.

Company industry:
Oil & Gas
Job role:
Engineering

Project Engineer

August 2013 - March 2014

Saudi Aramco

Eastern Province, Saudi Arabia

August 2013 - March 2014

• Responsible for initiating Bid package for new project
• Responsible for managing engineering and construction contractors
• Responsible for managing offshore projects comprising pipeline, cable, tie-ins, topside structures, and instrumentation.
• Experience in offshore pipeline construction that includes welding, inspection, and installation.

Company industry:
Oil & Gas
Job role:
Engineering

Pipeline Integrity Engineer

May 2011 - August 2013

British Petroleum

United States

May 2011 - August 2013

British Petroleum (BP), Houston, Texas, U.S.A., 5/2011 - 08/2013
Pipeline Integrity Engineer
• Developed and maintained Pipeline Integrity Management System (PIMS) for two BP (British Petroleum) Assets - Marlin and NaKika
• Managed and interfaced with contractor dedicated for the integrity management of Subsea Pipeline, Risers, and equipment.
• Managed integrity of subsea pipeline, risers, umbilical, and equipment of two BP Assets.
• Develop Integrity Management Program (IMP) for pipeline, risers, and subsea equipment based on RBI and inspection.
• Planned and Executed inspection activities comprising ROV, AUV, Intelligent and maintenance pigging.
• Planned and Executed General Visual and Close Visual Inspections (GVI & CVI) for topside piping of subsea platforms
• Interfaced with technical discipline such as corrosion and piping engineers to develop corrosion mitigation strategy.
• Regularly conducted and facilitated risk assessment of subsea assets
• Oversaw and performed Pipeline Defect Assessment such as wall loss (due to general corrosion, pitting), dent. Defect Assessment is perform based on Modified ASME 31.8 and API 579
• Proposed free span correction method where VIV may cause fatigue failure.

Company industry:
Oil & Gas
Job role:
Engineering

Pipeline Integrity Management Engineer

May 2011 - August 2013

British Petroleum

United States

May 2011 - August 2013

• Developed and maintained Pipeline Integrity Management System (PIMS) for two BP (British Petroleum) Assets - Marlin and NaKika
• Managed and interfaced with contractor dedicated for the integrity management of Subsea Pipeline, Risers, and equipment.
• Managed integrity of subsea pipeline, risers, umbilical, and equipment of two BP Assets.
• Develop Integrity Management Program (IMP) for pipeline, risers, and subsea equipment based on RBI and inspection.
• Planned and Executed inspection activities comprising ROV, AUV, Intelligent and maintenance pigging.
• Planned and Executed General Visual and Close Visual Inspections (GVI & CVI) for topside piping of subsea platforms
• Interfaced with technical discipline such as corrosion and piping engineers to develop corrosion mitigation strategy.
• Regularly conducted and facilitated risk assessment of subsea assets
• Oversaw and performed Pipeline Defect Assessment such as wall loss (due to general corrosion, pitting), dent. Defect Assessment is perform based on Modified ASME 31.8 and API 579
• Proposed free span correction method where VIV may cause fatigue failure.

Company industry:
Oil & Gas
Job role:
Engineering

Project Lead

July 2010 - May 2011

Aker Solutions

United States

July 2010 - May 2011

Aker Solutions, Houston, Texas, U.S.A., 7/2010 to 5/2011
Project Lead
Clove project, Total, pressure cap qualification, Expat Assignment, Oslo, Norway
• Scheduled manhours and project deliverables.
• Communicated with suppliers to get the product delivered on time
• Created MDL for the project
• Participated in material selection of pressure cap.
• Prepared qualification procedure in accordance with API 6A and 17D
• Performed qualification test and prepared test report.
Hibernia Southern Extension Project (Tender Phase), Exxon
• Prepared technical writing for subsea Tie-in structures that include flexible jumper, gooseneck, vertical connection system (VCS) and manifold in accordance with Exxon's PDB and Global Practice Documents
• Created Master Equipment List (MEL) for VCS and Gooseneck
• Selected material grades for Tie-structures in accordance with Exxon's PDB and recommendations
• Developed Inspection and Test Plan (ITP) for Gooseneck and Vertical Connection System (VCS)
• Developed Product Qualification Sheet (PQS) for Gooseneck and Vertical Connection System (VCS)
• Selected SIT Plan for Manifold, and Vertical Connection System (VCS)
Longhorn Phase Iii Development Project (Tender Phase), ENI
• Prepared technical writing for Vertical Connection Module (VCM) and Long-term Pressure Cap
• Participated Technical Clarification and Exception (C & E) of RFQ with clients
• Created Master Equipment List (MEL) in accordance with RFQ
• Participated in identifying scope of work and estimating hours accordingly
Marine Well Containment System (MWCS), Joint Industry Project (JIP)
• Prepared technical write-up and proposed various connection systems for MWCS for concept development
• Prepared technical write-up for single header 4-slot manifold system to be used for Marine Well Containment System
• Participated Technical Clarification and Exception (C & E) with clients

Jubilee Field Development Phase I, Tullow Ghana LTD.
• Designed the interface between Aker stroke tool and Jubilee Plet to push and pull a pin Subsea
• Helped Prepared SIT procedure
• Participated in conducting SIT

Company industry:
Oil & Gas
Job role:
Information Technology

Project Lead

July 2010 - May 2011

Aker Solution

United States

July 2010 - May 2011

Clove project, Total, pressure cap qualification, Expat Assignment, Oslo, Norway
• Scheduled manhours and project deliverables.
• Communicated with suppliers to get the product delivered on time
• Created MDL for the project
• Participated in material selection of pressure cap.
• Prepared qualification procedure in accordance with API 6A and 17D
• Performed qualification test and prepared test report.
Hibernia Southern Extension Project (Tender Phase), Exxon
• Prepared technical writing for subsea Tie-in structures that include flexible jumper, gooseneck, vertical connection system (VCS) and manifold in accordance with Exxon’s PDB and Global Practice Documents
• Created Master Equipment List (MEL) for VCS and Gooseneck
• Selected material grades for Tie-structures in accordance with Exxon’s PDB and recommendations
• Developed Inspection and Test Plan (ITP) for Gooseneck and Vertical Connection System (VCS).
• Developed Product Qualification Sheet (PQS) for Gooseneck and Vertical Connection System (VCS).
• Selected SIT Plan for Manifold, and Vertical Connection System(VCS)
Longhorn Phase Iii Development Project (Tender Phase), ENI
• Prepared technical writing for Vertical Connection Module (VCM) and Long-term Pressure Cap
• Participated Technical Clarification and Exception (C & E) of RFQ with clients
• Created Master Equipment List (MEL) in accordance with RFQ
• Participated in identifying scope of work and estimating hours accordingly
Marine Well Containment System (MWCS), Joint Industry Project (JIP)
• Prepared technical write-up and proposed various connection systems for MWCS for concept development
• Prepared technical write-up for single header 4-slot manifold system to be used for Marine Well Containment System
• Participated Technical Clarification and Exception (C & E) with clients

Company industry:
Manufacturing
Job role:
Engineering

Senior Design Specialist

July 2008 - July 2010

Technip Offshore, Inc

United States

July 2008 - July 2010

Technip Offshore, Inc., Houston, Texas, U.S.A., 7/2008 to 7/2010
Senior Design Specialist

Ozona Development, Marathon
• Provide guidance and recommendations on engineering designs to ensure that they meet applicable industry codes and best design practices.
• Complete design of the gooseneck.
• Performed all structural calculations pertaining to gooseneck design.

BP King South Development & K2 Expansion, Anadarko
• Responsible for communication with client designated consultant for design verification.
• Responsible for checking and helping the work of other engineers involved the PLET design.
• Prepared design basis of PLET.
• Performed detail design and analysis of PLET.
• Responsible for preparing first and second end PLET installation sequence.

Daniel Boone, W & T Offshore
• Designed and analyzed IN-LINE SLED and PLET
• Performed structural analysis to verify structural integrity of Padeye

Job role:
Engineering

Pipeline Engineer

December 2005 - July 2010

Technip

United States

December 2005 - July 2010

• Performed Lateral buckling analysis of DC-3 (drill center 3) HT/HP flowlines in 7000 ft water depth.
• Performed wall thickness calculation of HT/HP flowline.
• Performed lateral buckling analysis of HT/HP flowline.
• Optimized stabilization pile location on the escarpment to minimize permanent lateral movement.
• Performed fatigue life calculation due to VIV for free spanning pipeline.
• Involved in the Design, development and analysis of PLETS, and PLEMS.
• Designed and selected flowline and well jumpers. Optimized the jumper geometry and API valve location in order to mitigate the stress in the jumper and reaction loads at the connector.
• Prepared flowline design report for the client

Company industry:
Oil & Gas
Job role:
Engineering

Staff Specialist

December 2005 - April 2008

Technip Offshore, Inc

United States

December 2005 - April 2008

Technip Offshore, Inc., Houston, Texas, U.S.A., 12/2005 to 04/2008
Staff Specialist
• Deepwater GoM pipeline FEED and Detailed design.
• Pipeline route selection and optimization, wall thickness determination, pipeline on-bottom stability, thermal fatigue design, span and bottom roughness analysis, VIV analysis, material selection and pipeline/flowline installation analysis.


BP Atlantis Deepwater Development (DC-3 & DC-1), Gulf of Mexico
• Performed Lateral buckling analysis of DC-3 (drill center 3) HT/HP flowlines in 7000 ft water depth.
• Performed wall thickness calculation of HT/HP flowline.
• Performed lateral buckling analysis of HT/HP flowline.
• Optimized stabilization pile location on the escarpment to minimize permanent lateral movement.
• Performed fatigue life calculation due to VIV for free spanning pipeline.
• Involved in the Design, development and analysis of PLETS, and PLEMS.
• Designed and selected flowline and well jumpers. Optimized the jumper geometry and API valve location in order to mitigate the stress in the jumper and reaction loads at the connector.
• Prepared flowline design report for the client

Job role:
Management

Engineering Analyst

August 2002 - December 2005

National Oil Well Varco

United States

August 2002 - December 2005

• Performed conceptual and detailed engineering design of Ram type blowout preventer (BOP), Drilling Riser, Riser Tensioner, and Continuous Circulation System.
• Performed stress analysis of Blowout Preventers (BOP), Drilling Risers, and Riser Tensioners.
• Conducted failure analysis (Failure Modes Effects Criticality Analysis) of pressure equipment and prepared technical reports.
• Simulate blow out preventer’s multi ram rubber seal mechanism using finite element to verify sealing capabilities and performance under high pressure/temperature.
• Develop testing procedures of BOP and Riser Tensioners for successful product development.
• Provide technical support to sales, marketing, and manufacturing.
• Perform Design check of new products against API 16A, 8C, 16R and ASME pressure Vessel Codes.

Company industry:
Manufacturing
Job role:
Engineering

Engineering Analyst

January 2002 - January 2005

National Oil Well Varco

United States

January 2002 - January 2005

National Oil Well Varco, Houston, TX, 2002 to 2005
Engineering Analyst
• Performed conceptual and detailed engineering design of Ram type blowout preventer (BOP), Drilling Riser, Riser Tensioner, and Continuous Circulation System.
• Performed stress analysis of Blowout Preventers (BOP), Drilling Risers, and Riser Tensioners.
• Conducted failure analysis (Failure Modes Effects Criticality Analysis) of pressure equipment and prepared technical reports.
• Simulate blow out preventer's multi ram rubber seal mechanism using finite element to verify sealing capabilities and performance under high pressure/temperature.
• Develop testing procedures of BOP and Riser Tensioners for successful product development.
• Provide technical support to sales, marketing, and manufacturing.
• Perform Design check of new products against API 16A, 8C, 16R and ASME pressure Vessel Codes.


CODES AND STANDARDS: • API RP 1111 - Design, Construction, Operation and Maintenance of Offshore Hydrocarbon Pipelines (Limit State Design)
• API SPEC. 5L - Specification for Line Pipe
• API RP 2RD - Design of Risers for Floating Production Systems (FPSs) and Tension-Leg Platforms (TLPs)
• ASME B31.4 - PipelineTransportation Systems for Liquid Hydrocarbons and Other Liquids
• ASME B31.8 - Gas Transmission and Distribution Piping Systems
• API 579 - Recommended Practice for Fitness-for-Service
• DNV-OS-C101- Design of Offshore Steel Structures, General (LRFD Method)
• DNV-OS-F101- Submarine Pipeline Systems
• DNV-OS-F201- Dynamic Risers
• DNV-RP-F105 - Free Spanning Pipelines

Company industry:
Oil & Gas
Job role:
Information Technology

Research Assistance

August 1999 - December 2001

National Aeronautic and Space Administration

United States

August 1999 - December 2001

Evaluating Process Induced Shape Instability of carbon fiber composite parts after curing.

Developed correlation between molded and post curing shape.

Company industry:
Aerospace
Job role:
Engineering

Education

Wichita State University

December 2001

December 2001

Master's degree, Mechanical Engineering

United States

GPA (point): 3.75 out of 4

GPA (point): 3.75 out of 4

Major in Mechanical Engineering with thesis option.

Wichita State University

January 2001

January 2001

Master's degree, Mechanical Engineering

M. Sc.: Mechanical Engineering, Wichita State University, Wichita, KS (awarded 2001)

Bangladesh University of Engineering and Technology

December 1998

December 1998

Bachelor's degree, Mechanical Engineering

Bangladesh

GPA (point): 3.20 out of 4

GPA (point): 3.20 out of 4

Bangladesh University of Engineering and Technology

January 1998

January 1998

Bachelor's degree, Mechanical Engineering

B. Sc.: Mechanical Engineering, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh (awarded 1998)

University of Houston

Master's degree, Petroleum Engineering

M. Sc.: Petroleum Engineering, University of Houston (Completed 27 credit hours)

Skills

Pipeline Building
Expert
Pipeline Building
Expert
Subsea
Expert
Subsea
Expert
Pipeline Design
Expert
Pipeline Design
Expert
Integrity
Expert
Integrity
Expert
Pipelines
Expert
Pipelines
Expert
Pipeline Engineering
Expert
Pipeline Engineering
Expert
Project Management
Intermediate
Project Management
Intermediate
API
API
BODY ENGINEERING
Expert
BODY ENGINEERING
Expert
CIRCULATION
Expert
CIRCULATION
Expert
ENGINEERING DESIGN
Expert
ENGINEERING DESIGN
Expert
FATIGUE
Expert
FATIGUE
Expert
INSPECTION
Expert
INSPECTION
Expert
MAINTENANCE
MAINTENANCE
OFFSHORE
OFFSHORE
PIPELINE
PIPELINE
PIPING
PIPING
Pipeline Building
Expert
Pipeline Building
Expert
Subsea
Expert
Subsea
Expert
Pipeline Design
Expert
Pipeline Design
Expert
Integrity
Expert
Integrity
Expert
Pipelines
Expert
Pipelines
Expert

Languages

English

Expert

Arabic

Intermediate

Bengali

Expert

Memberships

Texas Board of Professional Engieers

Registered Professional Engineer

September 2012

Training and Certifications

Training
Pipeline BP Way
BP
Sep 2011
Offshore Pipeline
Clarion
Oct 2006
Pipeline Defect Assessment
BP
Aug 2012