Managed end-to-end project planning, execution, and delivery for infrastructure
projects.
• Executed elevated viaduct, metro station, and associated civil works for Dubai
Metro Blue Line in compliance with RTA, Dubai Municipality, and international
standards.
• Supervised piling, pile caps, piers, pier caps, and superstructure works including
precast and cast-in-situ elements.
• Coordinated daily site activities with subcontractors, surveyors, QA/QC, and HSE
teams to ensure work fronts are available as per approved schedules.
• Monitored reinforcement fixing, shutering, alignment, levelling, and concreting
activities to meet approved IFC drawings and method statements.
• Ensured strict adherence to HSE requirements, toolbox talks, permit-to-work
systems, and zero-accident culture in line with Dubai regulations.
• Coordinated with consultants, client representatives (RTA), and third-party
inspectors for inspections, approvals, and handovers.
• Supported utility coordination, traffic diversions, and interface management in
congested urban corridors.
• Ensured construction complies with BS, ASTM, ACI, AASHTO, and local UAE codes.
• Prepared with Client-Planning team complete Project Management Documentation
Set, including Project Directory, Escalation Matrix, Communication Protocol, RACI
Matrix, Delegation of Authority, Project Execution Plan (PEP), Baseline Schedule.
• Prepared weekly and monthly progress reports, MOMs, risk registers, and delay
analysis reports.
• Prepared Baseline schedule & project schedule to track project progress.
Piling & Substructure Elements:
• Executed bored cast-in-situ piling, shoring and piling works including secant piles,
and open foundations for metro piers and stations.
• Managed to Execute750+ bored cast-in-situ piling works friction & end bearing piles,
MONO Pile (2600mm diameter) (750 mm dia-240nos., 1200 mm dia-339nos.,
1800mm dia-54nos.) for viaducts & 50 nos. open foundation, stations, and deep
foundations in accordance with IS 2911 Part 1/2, ensuring compliance with project
specifications and site conditions.
• Coordinated with testing agencies for initial and routine load tests, Pile Integrity
Testing (PIT), Caliper test and Cross-hole Sonic Logging (CHSL) & HSDLT test for
bored cast-in-situ piles in line with internationally accepted standards.
Excavation & Earthworks
• Managed bulk excavation for pile caps, raft foundations, and cut & cover
sections.
• Managed site enabling works, Controlled Excavation, utilities diversion,
drainage & dewatering. And coordinated with utility authorities (water,
power, telecom, sewerage) for relocation.
• Supervised shoring and struting systems to ensure safe excavation in
congested urban stretches.
• Constructed pile caps (10m x 9-13m), piers (4m x 2-3.5m), pier caps (up to 10m
spans) 93 nos. with safe sequencing.
• Coordinated dewatering systems (well points, submersible pumps) for dry working
conditions.
• Supervised 250+ workforce, ensuring zero accidents and QA/QC compliance.
Metro Station
• Executed structural works: pile foundation, pile caps, piers, pier caps,
concourse level slab, lower & upper platform, and roof slabs.
• Constructed abutments, wing walls, return walls & approach slabs as per IS 456, BS
5400, AASHTO LRFD.
• Optimized procurement, reducing material wastage by 15%.
- Company industry:
- Construction & Building