Melvin Estrada, MEP Coordinator

Melvin Estrada

MEP Coordinator

Hennessey LLC

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, Civil Engineering
الخبرات
14 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 7 أشهر

MEP Coordinator في Hennessey LLC
  • الإمارات العربية المتحدة - دبي
  • مايو 2016 إلى مايو 2018

Review MEP subcontractor shop drawings prior to submittal for service coordination and coordination with other construction elements.
•Review then monitors actual progress at site against the targeted dates on the latest approved MEP Program (to be generated by MEP Sub-Contractor in-line with the Main Contractor’s Program).
•To advice on any impact on services caused by Architectural changes and raise Query to MEP Manager & Consultant.
•Review material/equipment technical submittals from MEP subcontractor for specification compliance.
•Review of method statements from MEP subcontractor with respect to installation works and logistics for equipment’s positioning.
•To liaise with MEP Manager on matter seeking advice/requiring assistance.
•To assist internally QS and Planning department for update MEP system progress.
•Ensuring that services provisions clearance is provided in time for structure.
•To oversee MEP service installation under civil contractor scope of works.
•Close inspection for MEP subcontractor’s installation works.
•Carry out inspection for MEP Contractor material along with QA/QC and Consultant.
•Ensure that MEP site instruction / NCR are closed out
•Inspect concealed MEP service installation prior to closure of void /riser etc. inconjunction with QA/QC and obtaining consultant sign off
•Ensure that Company HSE policies are implemented at site in coordination with HSE Department.

MEP Coordinator في Qalat Al Jabal Est./ MM Facilities Mngt.
  • الإمارات العربية المتحدة - العين
  • ديسمبر 2013 إلى مايو 2016

• Review MEP subcontractor shop drawings prior to submittal for service coordination and coordination with other construction elements.
• To advice on any impact on services caused by Architectural changes and raise Query to MEP Manager & Consultant.
• Review material/equipment technical submittals from MEP subcontractor for specification compliance.
• Produce equipment &builder’s work scope Schedule for all MEP equipment detailing construction and maintenance requirement for equipment.
• Review of method statements from MEP subcontractor with respect to installation works and logistics for equipment’s positioning.
• To liaise with MEP Manager on matter seeking advice/requiring assistance.
• To assist internally QS and Planning department for update MEP system progress.
• Ensuring that services provisions clearance is provided in time for structure.
• To oversee MEP service installation under civil contractor scope of works.
• Close inspection for MEP subcontractor’s installation works.
• Carry out inspection for MEP Contractor material along with QA/QC and Consultant.
• Ensure that MEP site instruction / NCR are closed out
• Inspect concealed MEP service installation prior to closure of void /riser etc. in conjunction with QA/QC and obtaining consultant sign off
• Ensure that Company HSE policies are implemented at site in coordination with HSE Department.

MEP Coordinator في R.S. Labos and Associates
  • الفلبين
  • يوليو 2009 إلى سبتمبر 2013

Review then monitors actual progress at site against the targeted dates on the latest approved MEP Program.
•Schedule the Drawings & Material submissions so that to ensure all the approvals/deliveries will be achieved in advance enough prior to the progress of the respective activities.
•Ensure that all Shop Drawings are well coordinated with MEP services and with the Architectural / Structural Drawings.
•Feedback the QS Department about any Time and/or Cost implications caused by the Consultant or due to Sub-Contractors’ lack of progress.
•Ensure that all IN/OUT communications and instructions issued from Client / Consultant are informed to the relevant Sub-Contractors through the proper channels.
•Oversee the progress from all aspects to ensure completion on time. Alert the Management about any expected delay and point out the reasons.
•Ensure that all Sub-Contractors are carrying out their Scope of Work as per the awarded Contract. Issue contractual letters whenever lags or deviations from the Scope are noted.
•Conduct regular meetings with Sub-Contractors to maintain close coordination and to mitigate any obstacles that may obstruct or affect the progress at site.
•Make sure that all Builder’s Work Drawings are prepared based on the latest Approved Coordinated services, Architectural and Structural Drawings.
•Follow-up with QA/QC team to expedite the progress of work inspections & approvals.
•Coordinate with Safety Officer in site and help them in implementing Safety Rules and Regulations.
•Inspects and assures that the work being carried out complies with the Material Specifications, Approved Drawings and Method Statements.

MEP coordinator في Murray & Roberts Middle East
  • البحرين - المنامة
  • يناير 2008 إلى فبراير 2009

Coordinate the work of NMR (NASS - Murray & Roberts Joint Venture) with Sub-Contractors (BK Gulf and Mercury) from all aspects.
•Coordination among BKG & Mercury and the other Sub-Contract Packages (i.e.; Kitchens, Water Features, IT, Lifts & Escalators, Finishes...etc.).
•Review then monitors actual progress at site against the targeted dates on the latest approved MEP Program (to be generated by MEP Sub-Contractor in-line with the Main Contractor’s Program).
•Schedule the Drawings & Material submissions so that to ensure all the approvals/deliveries will be achieved in advance enough prior to the progress of the respective activities.
•Ensure that all Shop Drawings of those different packages (i.e.; Kitchens, Water Features, IT, Lifts & Escalators, Finishes...etc.) are well coordinated with MEP services and with the Architectural / Structural Drawings.
•Establish the project construction methodology and sequencing the MEP activities in coordination with other teams to suit the project requirements.
•Systemize and organize the handing-over process among the Sub-Contractors at those interfering / clashing areas.
•Feedback the QS Department about any Time and/or Cost implications caused by the Consultant or due to Sub-Contractors’ lack of progress.
•Ensure that all IN/OUT communications and instructions issued from Client / Consultant are informed to the relevant Sub-Contractors through the proper channels.
•Oversee the progress from all aspects to ensure completion on time. Alert the Management about any expected delay and point out the reasons.
•Ensure that all Sub-Contractors are carrying out their Scope of Work as per the awarded Contract. Issue contractual letters whenever lags or deviations from the Scope are noted.
•Conduct regular meetings with Sub-Contractors to maintain close coordination and to mitigate any obstacles that may obstruct or affect the progress at site.
•Make sure that all Builder’s Work Drawings are prepared based on the latest Approved Coordinated services, Architectural and Structural Drawings.
•Follow-up with QA/QC team to expedite the progress of work inspections & approvals.
•Coordinate with Safety Officer in site and help them in implementing Safety Rules and Regulations.
•Inspects and assures that the work being carried out complies with the Material Specifications, Approved Drawings and Method Statements

MEP Site Engineer في TECHNICAL & TRADING ESTABLISHMENT (Easah Saleh Al Gurg Group)
  • الإمارات العربية المتحدة - دبي
  • فبراير 2006 إلى يناير 2008

• Ensures that all workers / laborers are given Safety Induction before going to Site for Safety purposes.
• Monitors & Supervise site progress.
• Inspects site conditions prior to start of construction activities.
• Verifies the compatibility of the site with the designed permanent works.
• Checks for obstructions.
• Photograph & Document the condition of the existing property that might be damaged by the work.
• Make sure all the existing Structures, Property, Utilities and Landscaping are properly protected.
• Review materials delivered at site for conformance with approved samples materials and equipment and report finding to the Project Engineer or Project Manager.
• Checks all materials delivered at site are properly stored and report discrepancies to Project Engineer or PM.
• Inspects the construction of the temporary and permanent works to ensure compliance with the Contract Documents and Approved Shop Drawings and Submittals.
• Prepares daily logs and reports.
• Checks all works completed are ready before raising inspection in each and every floor/area.
• Responsible for raising Inspection of completed works before casting and getting approval for the same.
• Maintains records of inspections made, tests performed, and works executed, etc.
• Performs all works in accordance with the Contracts Administration Procedures Manual.

Supervisor في A.M. PITPITAN ENGINEERING DESIGN – ENGINEERS - CONSULTANTS
  • الفلبين
  • مارس 2003 إلى نوفمبر 2005

Ensures that all workers / laborers are given Safety Induction before going to Site for Safety purposes.
•Monitors & Supervise site progress.
•Inspects site conditions prior to start of construction activities.
•Verifies the compatibility of the site with the designed permanent works.
•Checks for obstructions.
•Photograph & Document the condition of the existing property that might be damaged by the work.
•Make sure all the existing Structures, Property, Utilities and Landscaping are properly protected.
•Review materials delivered at site for conformance with approved samples materials and equipment and report finding to the Project Engineer or Project Manager.
•Checks all materials delivered at site are properly stored and report discrepancies to Project Engineer or PM.
•Inspects the construction of the temporary and permanent works to ensure compliance with the Contract Documents and Approved Shop Drawings and Submittals.
•Prepares daily logs and reports.
•Checks all works completed are ready before raising inspection in each and every floor/area.
•Responsible for raising Inspection of completed works before casting and getting approval for the same.
•Maintains records of inspections made, tests performed, and works executed, etc.
•Performs all works in accordance with the Contracts Administration Procedures Manual.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Lyceum Northwestern
  • يونيو 2019

الثانوية العامة أو ما يعادلها, Civil Engineering
  • في SECONDARYMary Cause of our Joy Catholic School
  • يناير 1990

: Mother Shepherd School Muntinlupa

Specialties & Skills

Site Supervision
Project Execution
MEP coordination
MICROSOFT WORKS
PROGRESS
CONSULTING
ENGINEERING
INSTRUCTION
LOGISTICS
MEETING FACILITATION
POLICY ANALYSIS
POSITIONING
QUALITY CONTROL

اللغات

الانجليزية
متمرّس