Supervisor
Ponticelli Nigeria Limited GMC Trans Amadi Industrial Layou
Total years of experience :17 years, 6 Months
, Plot104- 105 RIVOC RD, Port Harcourt, Rivers State.
Instruments/ICSS
A & B; Heating Medium System Furnaces Ham-worthy type (A & B);
• Liquid Analysers and Gas Analysers (GD402) Yokogawa type;
• Circulation Tanks & Circulation Pumps Cooling Circuit (Heating Medium Devices);
•Crude Oil Heaters A & B and Heat Exchangers EC300A & EC300B;
•Tanks Washing Heaters A & B;
• Fuel Gas System Package (Fuel Gas Scrubber, Fuel Gas Heater, & Overall Percentage Regulation);
•Electro-chlorination Unit Package;
•Boost Pump/Booster Pump (Export Offloading Pump /Crude Export Booster Pump);
•Metering Skid are four Streams lines A, B, C, D linked to one Four-way Valves :(Crude Oil Export Run Streams lines);
•Diesel Oil Storage Tanks Pumps Starboard side, Port side (Transfer & Recycle Pumps) and Diesel Oil Purifier Package A & B;
•Emergency Diesel Generator CAT 3516 Engine Package Unit (EDG);
• Carryout F & G functionality checks, calibrations, leaks check for tubing’s and hoses, corrosion checks, grounding wires, Junction boxes inspections where applicable, greasing, on the entire Facility FSO F&G Equipment’s;
•F&G Detectors as follows:
Fire Water Pumps A&B (Safety Critical Equipment’s), Foam Pumps A&B, Deluge System (Fusible loop System, Fusion plug system panels, Actuators, Valves, Foam deluge valve control boxes, Water Deluge Valve control boxes, Fire water deluge system, Sprinklers spraying status, sprinkler piping network), MAC for ESD 1 & ESD 0, General monitor gas detectors 4100 series, IRS4000S series, Smokes detectors, Heat detectors, FM 200 F & G prevention package, CO2 F & G prevention package;
Inhibitions and overrides are implemented with strict adherence to procedures, to avert shutdown or sounding of muster alarms during and after PMs or CMs have been completed;
Fresh Water Maker Package A & B;
•PAGA A&B Package Systems;
•OWT Package and Open Drain;
•Infirmary Oxygen bottles A, B, C package System for Medic;
•Turret;
•Implemented FAT, SAT, ISAT during Upgrades and MOC;
•Gas Compressors Package for LP and HP
•Daily service / maintenance reports and time sheets for the team, documented were sent to relevant and appropriate authorities
Exterran Nigeria, KM 14 Aba-Port Harcourt Expr-way, Port Harcourt, Rivers State
Automation, Instrumentation & Electrical Field Service Engineer (Rotator): Addax -NNPC Gas Flare downflow Station Izombe, Imo State: (Onshore)
section dedicated production flow station operation maintenances.
•Steps and Procedures the same as above.
•NNPC/Shell Gbaran Ubie Dewpoint Gas Processing Package plants: 85mmscft/d
•Exterran Instrumentation & Control
engines zero overhaul work-orders
•Generation of the zero overhaul parts lists from the OEM part manuals for mechanical parts, instruments, ignition firing system for the engines.
•Posting of labour man-hours on job work-orders.
•Writing of operation and service reports.
•Engines disassembling, and overhaul assembling stage by stage procedure for gas engines Caterpillar engines G399, G398, G3412, G3512, G3516 and Waukesha engines 5790, 7044GSI, 7042GSI, L7042, L7044GSI, H24, and others Waukesha engines.
•Engines Crankshaft timing at angles BTDC (Before Top Dead Centre)
•Ignition crank timing to engines BTDC of the instruments.
•Wiring of the ignition harness to ignition coils, ignition firing system controls.
•Wiring pyrometers sensors, temperature sensors, and other transducer sensors in the engines.
•Engine’s test running to checks and confirmation
•Components rebuild: Complete overhaul magnetos rebuild for Cat 3412, Cat3512, Cat3516, Cat399 gas engines and Waukesha engines, Regulators rekit, Impco Carburettor rekitting, Compressors Inlet and discharges valves rekit for compressors cylinders.
•Perform Servicing of pneumatic air supply to Blow-down Valves and rekitting
National Metallurgical Training Institute Onitsha, Anambra State
AutoCAD Designs, O&M, Project Construction & Commissioning, Calibration of instruments, Implementation of EPC or FEED, P&ID and Process plants diagrams from Greenfield plant to full Exiting plant Commissioned, PLC and DCS, Automation Controls, Full compliance to Safety shutdowns no bye-pass, Computer Maintenances and upgrading.
General Maintenances Services of Gen-sets,
Compressors, Heavy-duty equipment’s, Fabrication and Metal Machining of spare parts, Reconditioning of Engine Blocks and Top Cylinder, General Electrical & Electronic Equipment Maintenances
,
, Oko-Afo Badagry.
courses: WAEC SSCE May/June 1992 WAEC SSCE Nov/Dec. 1995 WAEC Craft, FCC and Trade Test II & III
,
-Agu.