مينا عبد الملاك, Planning Engineer

مينا عبد الملاك

Planning Engineer

Arada Developments

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Structural Engineering
الخبرات
12 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 2 أشهر

Planning Engineer في Arada Developments
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يونيو 2018

1- Reviewing & approving the contractors’ baseline programs in line with scope of work, Issued for Construction drawings, Bill of Quantities, Signed Contract, ensuring the implementation of all authorities’ approvals, defining long lead items, advising the missing items and recommendations on it.
2- Providing and amending the planning & controlling requirements documents; ensuring all the Contractors comply with and are providing all the progress Key Performance Index (KPIs) as required.
3- Monitoring the Contractors’ weekly Updated Baseline Programs, Contractors and Consultants progress reports, tracking the procurement logs and highlighting any delays related to Provisional Sums/ Prime Cost Materials/ long leads items.
4- Producing biweekly progress reports for the high management highlighting all Project components progress status, realistic forecast completion based on Contractors performance, risks register, area of concerns, cost/time variances, EOT claims status along with exposed EOT Claims, studying root cause analysis for project delays and suggesting solutions for their mitigation.
5- Requesting, reviewing and approving mitigation/ recovery plans submitted by the Contractors.
6- Reviewing the Contractors’ EOT claims in detail, ensuring they are following the suitable delay analysis technique based on the Contract, reviewing the Consultants determination and raising the fair recommendation for high management.
7- Conducting daily/ weekly site visits with the Project Director/ High management, auditing all the construction works progressed to ensure they are all progressing in line with early planned dates, in sequence, and with the required quality.
8- Following up on daily basis the Authorities approvals status, and raising concerns on time for high management required involvement.
9- Representing the Company in Contractors’ Weekly Progress Meetings, Suppliers Meetings and high management decision making meetings.
10- Assisting the Contracts department in amending the Contract especially for the Clauses related to baseline program, extension of times and progress reports.
11- Assisting the Development Director in site micromanagement such as but not limited to testing & commissioning repetitive defects, de-snagging status, commissioning & handing over status, general coordination between different parties, assigning the reviewing responsibilities on functional departments’ in the Company.

Planning Engineer في Consulting Engineers EHAF
  • الإمارات العربية المتحدة - أبو ظبي
  • أبريل 2014 إلى يونيو 2018

Site Supervision Tasks:

1- Reviewing the contractor baseline program in detail with scope of work, drawings, BOQ, contract, ensuring the implementation of all authorities’ approvals, defining long lead items and giving the consent on it.
2- Establishing the planning & controlling documents at project initiation; such as the procurement & Engineering Logs, Weekly & Monthly progress reports format, and Dashboard Executive Presentation.
3- Monitoring the Updated Baseline Program in parallel with Contractor.
4- Monitoring the project progress with different types of S-Curves: Manpower (effort) S-Curve, Cost S-Curve, report & update it on weekly basis.
5- Producing weekly/monthly progress reports to the Client highlighting the status of progress on site, 3 months look-ahead, probable risks, area of concerns, cost/time variances and forecasts.
6- Tracking the critical path on monthly basis, providing Management early warning of potential overruns to project time, making root cause analysis for project delays and suggesting solutions for their mitigation.
7- Reviewing submitted EOT (Extension of time) claims, raise up recommendation to Client, and assist the contractor in recovery plans/ revised schedules.
8- Preparing and attending Weekly Progress Meetings.
9- Providing assistance in any technical difficulties on latest Primavera version.

Design Management Tasks:

1- Developing, Updating and Maintaining the Consultant time schedules for the head office Design Projects.
2- Collecting, managing all sub-consultants time schedules and reflecting them within the project’s master schedule.
3- Estimating the consultancy resources based on the In-house productivity rates and the duration of the project in conjunction with team members.
4- Prepared various flow charts related to design management and authorities’ approvals.
5- Monitoring the project progress with different types of S-Curves: Manpower vs time, Cost vs time.
6- Preparing & submitting weekly/monthly progress report to the Client highlighting the Design Progress, risks, invoices status, design changes and areas of concerns.
7- Providing Management early warning of potential overruns to project time, assisting in their mitigation, and preparing the EOT claims with associated cost for client review & approval.
8- Prepare & submit the extension of time claims, using the suitable delay analysis method, collecting substantiation documents for historical records, calculating the associated cost and basis of estimation.
9- Assisting the business development team in proposals preparation, preparing fee estimation based on expected teaming strategy and issuing adequate Time Schedule for it.
10- Preparing Site Supervision Deployment based on expected construction works sequence and activities breakdown.
11- Giving support for other sites teams, in planning services, such as reviewing baseline schedules, progress report template, reviewing submitted EOT claims, and annual holiday’s replacement.
12- Assisted the Company in achieving compliance with ISO 9001-2015 QMS, ISO 14001-2015 & BS OHSAS 18001-2007 HSE, and direct responsibility on their annual renewal and internal auditing.

Planning Engineer في Al Mobty for contracting
  • المملكة العربية السعودية - الرياض
  • سبتمبر 2012 إلى فبراير 2014

1-Preparation of Clause‐14 / Clause 8.3 Baseline Program with resource and cost loading using Primavera P6; based on scope of work, extracted from IFC drawings, BOQ, Specs and signed contract.
2-Determining with the construction manager and project engineers the appropriate method statements, construction sequence.
3-Preparing internal target time schedules with clear KPI’s for project team and tracking each team
performance.
4-Updating approved baseline, monitoring the project progress and issuing the Effort & Cost S‐Curves.
5-Keep an eye - weekly basis on the critical path activities & near critical activities, reporting the delays to PM & team members, making related recovery/ mitigation plans.
6-Preparing revised programme for time extension proposal and present it to the consultant and client.
7-Preparing & submitting daily, weekly and monthly basis progress reports for consultant, client and company’s high management.
8-Attending weekly, monthly site progress meetings, dashboard’s meeting and preparing MOM’s
9-Assisting commercial manager in controlling quantities & cost of materials, equipment and labor to determine project cash flow constantly using Earned Value Management Technique.
10-Scheduling, coordinating & following up material delivery with suppliers, maintaining all requirements
needed as per consultant instructions following specs and submitting it for consultant approval

Quantity surveyor and cost estimator في Confidential Company for cost consultant & project management
  • الإمارات العربية المتحدة - أبو ظبي
  • سبتمبر 2011 إلى مارس 2012

Obtaining BOQ's for large engineering projects and estimating the initial cost of each item

الخلفية التعليمية

بكالوريوس, Structural Engineering
  • في Ain Shams University - Faculty of Engineering
  • يوليو 2011

The total bachelor's degree was GOOD

Specialties & Skills

Primavera P6
Project Reporting
Project Control
Microsoft Excel
AutoCAD
Microsoft Office
AutoCAD
CSI Columns
SAP V14.2
Microsoft Project 2013
primavera P6 R16.2

اللغات

الانجليزية
متمرّس
الفرنسية
متمرّس
العربية
متمرّس

العضويات

Egyptian Syndicate Of Engineering
  • Civil Engineer
  • October 2011
Saudi Council Of Engineers
  • Civil Engineer
  • September 2013
Project Management Institute (PMI)
  • PMI member
  • October 2014

التدريب و الشهادات

Full Forensic Planning /Delay Analysis for Construction (الشهادة)
تاريخ الدورة:
September 2018
Claims Management and Delay Analysis (الشهادة)
تاريخ الدورة:
November 2016
Certificate of Achievement in Forensic Schedule Delay Analysis (الشهادة)
تاريخ الدورة:
March 2019
Project Management Professional - PMP® #1872920 (الشهادة)
تاريخ الدورة:
November 2015
صالحة لغاية:
November 2021
PMI-Scheduling Professional (الشهادة)
تاريخ الدورة:
July 2016
صالحة لغاية:
July 2022

الهوايات

  • Sports in general going to the Gym, swimming , running - Reading - Outings and making new friends