Duty manager
Limak For Agencies And Trading
Total years of experience :16 years, 5 Months
Limak construcation company
Expansion and Rehabilitation of Cairo International Airport Terminal Building-2
Project & taxi ways
Responsible for two building for power &light current installation.
Scope:
1- Controlling Facility team in the shift.
2- Reviewing PM reports.
3- Reviewing CM reports.
4- Preparing Weekly & Monthly reports.
5- Controlling procurement department and control materials delivery.
6- Dealing with CMMS.
1- Controlling Facility team in the shift.
2- Reviewing PM reports.
3- Reviewing CM reports.
4- Preparing Weekly & Monthly reports.
5- Controlling procurement department and control materials delivery.
6- Handling the client, government and sub-contractors.
7- Following SLA (services level agreement).
Expansion and Rehabilitation of Cairo International Airport Terminal Building-2
Project & taxi ways
Responsible for two building for power &light current installation.
Scope:
1-Controlling Site installation power, LV and LC Referring to international codes &
standards.
2-Controlling & Supervising the subcontractors & our team at site.
3-Technical support for site.
4-Corrdinat between all treads at site.
5-Preparing and doing the inspection for all systems.
6-Hand over the work for main contractor and the consultant if needed.
7-Reviwing & controlling the plan of project
8-Cheking & controlling the takeoff for the materials and Procurement too.
9- Preparing project charter.
10- Preparing Risk register.
11- Preparing stakeholder register.
12- Preparing Scope management plan.
13- Preparing Time, Cost & quality plan.
14- Preparing WPS (Work Breakdown Structure).
15-Preparing Daily, weekly & monthly reports
16-Supervising the air side work as(High masts installation with duct bank, lighting
fixtures & signage installation
. is a Construction company working at Afghanistan (
BNJV İnşaat A.Ş.-Egypt Branch
Expansion and Rehabilitation of Cairo International Airport Terminal Building-2
Project & taxi ways.
Scope:
1-Controlling Site installation power, LV and LC Referring to international codes &
standards.
2-Controlling & Supervising the subcontractors & our team at site.
3-Technical support for site.
4-Corrdinat between all treads at site.
5-Preparing and doing the inspection for all systems.
6-Hand over the work for main contractor and the consultant if needed.
7-Reviwing & controlling the plan of project
8-Cheking & controlling the takeoff for the materials and Procurement too.
9- Preparing project charter.
10- Preparing Risk register.
11- Preparing stakeholder register.
12- Preparing Scope management plan.
13- Preparing Time, Cost & quality plan.
14- Preparing WPS (Work Breakdown Structure).
15-Preparing Daily, weekly & monthly reports
16-Supervising the air side work as(High masts installation with duct bank, lighting
fixtures & signage installation
Scope:
1- Maintenance in Q-Land system Equipments as (LCU, AMR, SPA, DGS and Fiber Cables)
2- Maintenance Hardware & software for computer machine.
3-Installing the Network interfacing connection.
4-welding & testing coaxial & fiber optical cables.
5- Maintenance the Radio Device& installation.
6- Maintenance electronic components on the PCB boards.
7- Collect the information needed.
8- Maintenance AC.
9-Cable molding
10-Land Mobilization and Demobilization.
11-trouble shooter for Q-Land system Equipments at the operation line
As