Mina Khalil, Senior Electrical Engineer

Mina Khalil

Senior Electrical Engineer

Al Ryum Cont. & Gen. Transp.

Location
United Arab Emirates
Education
Bachelor's degree, Power Electrical Engineering
Experience
20 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 3 Months

Senior Electrical Engineer at Al Ryum Cont. & Gen. Transp.
  • United Arab Emirates - Abu Dhabi
  • My current job since September 2018

Senior Electrical Engineer / Senior MEP Coordinator
Abu Dhabi, Abu Dhabi
September 2018 - Present
Worked with the Abu Dhabi National Oil Company (ADNOC)
as approved Sr. Electrical Engineer for the following projects
-Central Park at Al Ruwais City.
-ADNOC Golf Clubhouse AL Ruwais City
-Irrigation Pumping station for AL Ain City Municipality
- Saadiyat Infrastructure Public Realm and Landscape Construction Works Package 2 - Beach and Marina

Senior Electrical Engineer / MEP Project Coordinator at Fourth Dimension General Contracting
  • United Arab Emirates - Abu Dhabi
  • May 2014 to August 2018

Worked with the Command of Military Works as the approved MEP Engineer for:

- Khawla BInt Al Azwar Military Camp at Mahawi Military Area, to construct new tow building for National Service, Abu Dhabi, Responsible for all electrical installation (Lighting, Power, Earthing and Lightening Protection) and Low Current System Installation (Fire Alarm System, Public Address System, Master Clock System, Satellite System, Lighting Control System and Structure Cabling).

- Hangar Project for Fighter Aircrafts at Dhafra Airbase- Abu Dhabi, Responsible for all electrical installation (Lighting, Power, Aircraft power supply panels, Earthing and Lightening Protection) and Low Current System Installation (Fire Alarm System, Satellite System for rest areas, and Structure Cabling).

Involved in Construction projects:

- Hotel Apartments 2B + G + 7 story building at Al Furjan - Dubai, working as Main Contracting Company, Responsible for all MEP work coordination and Material submittals and technical specifications reviewing.

Project engineer at Al Husam General Contracting
  • United Arab Emirates - Abu Dhabi
  • February 2008 to April 2014

Involved in Construction projects:

- District Cooling Plant as technical office engineer, Responsible for prepare all technical submittals for electrical equipments, Panels and materials, Low Voltage Circuit Design, High Voltage/Low Voltage Load Calculation, High /Low Voltage Drop Calculation, Short Circuit Calculation, Cable Tray Design, Cable Tray Load Calculation and all Reviewing Electrical Drawing .

Served as project lead for:

- Installation of 11 KV Cables and Equipments at Al Ain Rural and Urban areas, Responsible for following HSE roles as Authorized Person From AADC (Al Ain Distribution Company) to install and commission 11KV cables and Equipments.

- Installation of 11 KV Overhead Lines Autorecloser at Al Ain Rural and Urban areas, Responsible for following HSE roles as Authorized Person From AADC (Al Ain Distribution Company) to install and commission 11KV cables and Equipments.

- One to One Hotel and Resort Ain Al Fayda Renovation and Maintenance in Al Ain City - Abu Dhabi, Responsible for all electrical installations (Lighting, Power, Kitchen Power/Lighting distribution, cold rooms equipments Installations, Restaurants power/lighting, Conference Halls and Ball Rooms power/ lighting) and all Low Current System Installation (Fire Alarm system for Hotel Building and Chalet Area, Public Address System and General Alarm Systems, Lighting Control Systems).

Commissioning Engineer at New Melt Shop
  • India
  • March 2004 to December 2008

Mar. 2004 -2008 Erection and Commissioning Eng.
Erection and commissioning of (New Melt Shop) in Sadat City
. Responsible for: All Electrical Construction in "CCM "Continuous Casting Machine
-Install Transformers 11KV/ 380V & MCC panels.
- Install computerized units for air conditions.
- Install 11KV station panels and its feeders.
- Pulling & connecting cables "Power & Control "
- Pulling & connecting lighting network.
- Generators and UPS units
- Step 7 PLC.
- Testing Analog and Digital Input / Output Modules in PLC Siemens S7.
- Make Commissioning for PLC "Siemens S7"
- AC Motors & AC Drive "ABB, Siemens ",
-AC Drives "Micro Master 440 ".
- AC Drives "Danaher Motion"
- Working with HMI SCADA system.

Education

Bachelor's degree, Power Electrical Engineering
  • at Monufia Universty
  • May 2003

Certificate: BSc.of Power Electrical Engineering Graduation year: May 2003 University: El-Monofia-Shbine El-Kom Grade: Good Project Subject : one research project was conducted in order to match the academic studies with the inherent practices in (Power System Protection) : Adaptive Non Communication Distance Protection. Project Grade: Excellent

Diploma, Electrical Power Network
  • at Technical Industrial Institute
  • May 1998

Certificate from: Ministry of Higher Education Technical Industrial Institute - Alexandria - Egypt Grade: Very Good Subject Electrical Power Network Analysis.

Specialties & Skills

Languages

Arabic
Expert
English
Expert

Memberships

Ttechnical office stuff in Abu Dhabi working on the new Cooling Plant project
  • Project Engineer
  • July 2010

Training and Certifications

to Project Management Body of Knowledge – Fifth Edition (Training)
Training Institute:
Cambridge
Date Attended:
January 2016
Duration:
35 hours
Electricity Wiring Regulations Course E1 (Training)
Training Institute:
RSB
Date Attended:
May 2014
Duration:
36 hours
General Training (Training)
Training Institute:
Steem Power Stasion
Date Attended:
July 2001

Hobbies

  • Reading the Politics and Listening to music