Work Experience

Total years of experience :12 years, 4 Months

Civil / Structural Engineering / Project Engineer Lead at SNC Lavalin
  • Canada
  • March 2012 to January 2015

• Involved in major EPC engineering activities; Requesting and approving procurement items, Coordinating (with Electrical, P&C, Major Equipment, Vendors and Fabricator), supporting site, preparing Scope of Work for bidding, assessing bids, managing schedules as well as supervising and educating junior engineers.

Accomplishments:
Successfully designed & coordinated all engineering works to the following projects:
• East Calgary Transmission Project (ECTP) - Substation “5S” a 240kV substation.
• Winefred Project - Substation “818S” located a 240kV substation.
• Kirby Project - Substation “651S” a 240kV substation.
• Langden to Janet (LTJ) Project - Several substations & an 18 Km Transmission line.
• Heartland Project - Substation “12S” a 500kV substation.

Project Engineer Lead at WS ATKINS
  • United Arab Emirates - Dubai
  • November 2011 to June 2012

I worked as a civil Senior Lead for various prestigious projects. My project managerial tasks include scheduling, resource planning, cost controlling, coordination and review drawings. My technical tasks included preparing designing and preparing drawings, site support and Lead client discussions.

My project was Padideh Shandiz Recreation complex in Iran, a huge mall almost 300, 000 m2. I was the Project Lead and I had a team more than 24 engineers and drafters assisting me. Responsible for all coordination between Architect, Mechanical and Electrical

Civil / Structural Engineering at Kassian Dyck Associates
  • Canada
  • June 2011 to January 2012

• Designed structural systems for industrial & residential buildings “Reinforced Concrete & Steel” as well as coordination of all the works between architectural, electrical & mechanical disciplines.
• Reviewed all project’s drawings at different stages of the project lifecycle.

Major projects:

• Saipum Maintenance & Loading warehouse (Industrial Steel Building)
• Champagne Project - A 5 complex concrete buildings (each 5 stories) with common parkade.
• Purolator Warehouse (Industrial Building).

Senior Civil / Structural Engineering at WS ATKINS
  • Qatar - Doha
  • November 2008 to November 2011

I worked as a civil Senior Lead for various prestigious projects. My project managerial tasks include scheduling, resource planning, cost controlling, coordination and review drawings. My technical tasks included preparing designing and preparing drawings, site support and Lead client discussions. Also, I managed civil department for Doha Branch for a period of time. Benchmark Projects include:

• QAFCO Melamine Plant and Urea, designing a supporting foundation and steel structure for the facility pipelines and platforms and site support.
• Pearl GTL project, Ras Laffan in Qatar, designing some steel structures for an existing Gas to Liquid facility.
• Lusail Transit System, Buildings for Rail Maintenance in Qatar, Project Lead
• National Convention Centre Carpark, Doha
• Qatar Education City-Waste Transfer Facility
• Dahlak Island Resort, Eretria
• Al-Areen Retail Building, Bahrain
• Kazma Military Camp, Kuwait
• King Abdul Aziz International Airport (KAIA) extension, Jeddah, KSA

Strucrure Engineer (Designer) at Stantec Consulting
  • Canada
  • October 2006 to November 2008

My responsibilities involved structural designing, 3D modeling, reviewing shop drawing, drawings coordination, cost estimation, site survey, and construction support and updating As-built drawings.
Benchmark Projects:
• Suncor Firebag Village in Fort McMurray, Core Building and Prefabricated Dormitories units
• Shell Albian Sands Fire Water Tank (Vertical Vessel).
• Rossdale Water Treatment plant repair, Owned by EPCOR
• Southgate Light Rail Transit (LRT) Pedway.
• Victoria School extension in Edmonton.
• Alberta Heart Institute (AHI) (minor designing duties).

Strucrure Engineer (Designer) at econstruct
  • United Arab Emirates - Dubai
  • March 2004 to July 2006

My responsibilities involved the Completion of Structural Design, Modeling, Consultant Drawings, Workshop Drawings, Detailing, Quantities, Cost Estimation, as well as Value Engineering projects. MAJOR projects I worked on:-
• Kuwait Oil Company KOC Offices Complex Project (Total Budget $ 120, 000, 000), this. The project consists of 12 building 3 floors each. Value engineering the project, the building system has been changed from cast-in-situ building to precast prestressed band beams supporting double tee and hollow core slabs. I was leading a team of 10.
• Sharjah residential tower (45 stories) in Sharjah, Owned by Sheikha Fatma Bint Mubarak. The building total height is 210.00 m above ground.
• Amiry guard buildings in Kuwait. This Project is owned by Kuwait ministry of defense and the building system was cast in-situ beams supporting hollow core slabs (Proposal).
• Pearl Dubai Hotel (A1 Tower) and (A4&A5 Towers) in Dubai, 60 floors tower on the Arabian Gulf, This Project is owned by OMNIX. The building total height is 245.00 m above ground.
• Delhi Private School in Dubai, full precast school (precast walls, precast hollow core slabs and precast foundation) (Design and Precast Detailing for fabrication).
• Marriot Accommodation (4-Buildings) in Sharjah, full precast school (precast walls, precast hollow core slabs and precast foundation).
• Sharjah cement labor accommodation, full precast school (precast walls, precast hollow core slabs and precast foundation).

Quality Control Engineer at Misr Raymond Foundation
  • Egypt
  • August 2003 to March 2004

In charge for quality control for concrete and soil works in Liquefied Natural Gas (IDKU) LNG project, working with Bechtel overseas as a 3rd party consultant for clients (British Gas and Gas D' France).
Main tasks:
• Quality control (QC/QA) for concrete work.
• Reviewing drawings
• Calibration of concrete patch plant on site
• Soil testing
• Material Control

Construction Field Engineer at Contract Construction Company
  • Other
  • August 2002 to August 2003

Worked as a construction engineer for the 2 projects: Extension of Moon Beach Resort "50 Chalets" in Ras Sedr Egypt and El-Karma School Project, Cairo Egypt
Main tasks:
• Construction Scheduling and update
• Surveying Work
• Invoicing and preparing claims
• Preparing EWRs and replying for RFIs
• Preparing Contracts for subcontractors and supervising
• Work shop drawings, bending Lists and quantity survey

Education

Doctorate, Civil Structural Engineering
  • at Cairo University
  • February 2006
Bachelor's degree, Civil Structure Engineeing
  • at Ain-Shams University
  • August 2002

Specialties & Skills

Contracts
Disputes
Project Engineering
Project Management
Engineeing, procurement and Construction (EPC)
Construction Management
Dispute resolution
Project Controls (Scheduling, Cost, performance)
Structural Engineering

Languages

English
Expert
Arabic
Expert

Memberships

Project Management Professional (PMP)
  • PMP certified
  • June 2013
Professional Engineer (P.Eng.) in APPEGA, Canada
  • Professional Engineer
  • June 2013

Training and Certifications

Project Management Course (Training)
Training Institute:
Mount Royal University in Calgary, Canada.
Date Attended:
January 2013

Hobbies

  • Enjoy swimming, playing soccer and tennis, traveling.
  • Knowing more about history, geography and different cultures.