Moataz Shehata, Project Engineer (Senior Site Structure Engineer, Assistant Site Manager)

Moataz Shehata

Project Engineer (Senior Site Structure Engineer, Assistant Site Manager)

SAUDI BIN LADIN GROUP Ltd

Location
Saudi Arabia
Education
Bachelor's degree, Civil Engineering
Experience
21 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 6 Months

Project Engineer (Senior Site Structure Engineer, Assistant Site Manager) at SAUDI BIN LADIN GROUP Ltd
  • Saudi Arabia - Mecca
  • My current job since January 2013

SAUDI BIN LADIN GROUP Ltd, (SBG)
(January 2013- Till Present, As a Project Engineer)
Description of duties:-

• Exercising full control over the workforce on site.
• Ensuring that work is executed in accordance with the contract drawings and specifications, agreed procedures and method statements.
• Preparation of designated procedures.
• Ensuring that HSE rules and regulations are communicated to the workforce and are fully enforced.
• Site surveying and setting out, dimensional control.
• Monitoring all Sub-contractors work closely to ensure that the Quality of the work is as per specification and is completed on time.
• Completing all necessary Q.A. documentation related to the work under his direct control and co-ordinate daily site inspections.
• General site management.
• Ensuring that all information on drawings is conveyed to the workforce in a proper manner and details produced where required.
• Maintain safe working environment at site.
• Ensure a clean and tidy workplace at all times.
• Conduct daily visual and weekly formal site inspections as per schedule.
• Analyze all work activities under their control to ensure that hazards have been
identified and controlled and that the only safe systems of work are undertaken.
• Ensure that all materials, gears and equipments (including personal protective
equipment) needed to carry out the job safely is provided prior to commencement of work.
• Ensure that work activities do not adversely affect or endanger other contractor's
employees.
• Conduct daily HSE briefing to the workers prior to the commencement of everyday job.
• Immediately investigate any reported HSE hazard by joining with HSE Personnel and implement measures to control or eliminate such hazards.
• Ensure that all work is carried out suitably qualified and trained personnel.
• Report, record and investigate all incidents within their work area.
• Prepare work method statements and risks assessments, where required.
• Ensure that the requirements identified during the development of the work method
statement and risk assessment are adequate in terms of detail and are being
effectively communicated to all personnel involved with the task.
• Any other duties and responsibilities as designated by the
Site Agent / Project Manager.

Project:-
PROJECT OF THE CUSTODIAN OF THE TWO HOLY MOSQUES
KING ABDULLAH BIN ABDUL-AZIZ FOR THE EXPANSION OF THE HOLY MOSQUE
AND ASSOCIATED ELEMENTS-SHAMIYA, MAKKAH.

Section Head at Saudi Binladin Group - Public Buildings And Airports Division
  • Saudi Arabia - Mecca
  • My current job since January 2018
Site Structure Engineer at ENGINEERING CONSULTANTS GROUP (ECG), Cairo, Egypt
  • Egypt - Cairo
  • November 2007 to January 2013

ENGINEERING CONSULTANTS GROUP (ECG), Cairo, Egypt.
(November 2007~January 2013, as a Site Structure Engineer)
Description of duties:-
• Maintains daily diaries of events associated with the work on site by using ECG
related form.
• Supervises my subordinate staff members in the execution of their
responsibilities.
• Monitors, reviews, comments and reports on progress payments, quality control and safety.
• Logs and monitors all Contractors submittals (correspondence and shop
drawings) to assure timely response, and process change and field orders for review by Construction Manager/Resident Engineer.
• Prepares necessary draft correspondence for final approval by the Construction
Manager/Resident Engineer.
• Assists as applicable, with pre-tender and pre-construction activities for contracts relative to my site (s) and provides input for all change orders and
claims analysis.
• Holds daily meeting with the contractor's representative.
• Prepares the Weekly Progress Reports by using ECG related form.
• Assists the Construction Manager/Resident Engineer in preparing the Monthly
Progress Reports.
• Reviews and approves the As Built Drawings for final approval by Construction
Manager/Resident Engineer.
• Assists in preparing the Final Acceptance and Completion Report.
• Reviews and presents the Contractors Valuations Payments for final approval by
Construction Manager/Resident Engineer.
• Witnesses and supervises commissioning and start-up activities.
• Studies and gives comments on the Contractors Claims.

Projects:-
• EFG HERMES Head Office Building at Pyramids Smart Village, Cairo, Egypt.
(Post -Tensioning system for RC Slabs)
• Contractor: ORASCOM CONSTRUCTION INDUSTRIES (OCI)
• Cost: 217 Million Egyptian Pound.
• Office Building (B2401), Owner Smart Village Company at Pyramids Smart Village,
Cairo, Egypt. (Post -Tensioning system for RC Slabs)
• Contractor: HASSAN ALLAM CONSTRUCTION.
• Cost: 200 Million Egyptian Pound.
• HC Securities & Investments Head Office Building at Pyramids Smart Village,
Cairo, Egypt.
• Contractor: ORASCOM CONSTRUCTION INDUSTRIES (OCI)
• Cost: 72 Million Egyptian Pound.
• CI Capital (CIB) Head Office Building at Pyramids Smart Village, Cairo, Egypt.
• Contractor: ORASCOM CONSTRUCTION INDUSTRIES (OCI)
• Cost: 120 Million Egyptian Pound.
• Arab Bank Head Office Building at Pyramids Smart Village, Cairo, Egypt.
• Contractor: GINZA for Engineering and Trading.
• Cost: 100 Million Egyptian Pound.
• Engineering Consultants Group (ECG) Head Office Building at Pyramids Smart
Village, Cairo, Egypt. (Post -Tensioning system for RC Slabs)
• Contractor: SHUTTERING For Engineering and Trading.
• Cost: 68 Million Egyptian Pound.
• REDICO Office Building at Pyramids Smart Village, Cairo, Egypt.
• Contractor: SQUARE Engineering Firm.
• Cost: 67 Million Egyptian Pound.
• Concordia Office Building at Pyramids Smart Village, Cairo, Egypt.
• Contractor: SQUARE Engineering Firm.
• Cost: 61 Million Egyptian Pound.
• ELMEHWAR Office Building at Pyramids Smart Village, Cairo, Egypt.
• Contractor: SQUARE Engineering Firm.
• Cost: 58 Million Egyptian Pound.
• The Egyptian Financial Supervisory Authority Head Office Building at (Pyramids
Smart Village) (Cairo - Egypt)
• Contractor: HASSAN ALLAM CONSTRUCTION.
• Cost: 320 Million Egyptian Pound.
• EGYPTIAN KUWAITI REAL ESTATE DEVELOPMENT CO. Head Office Building at (Pyramids Smart Village) (Cairo - Egypt)
• Contractor: Technical Office For Construction.
• Cost: 100 Million Egyptian Pound.

Site Construction Engineer at AL AHLY REAL ESTATE DEVELOPMENT Co
  • Egypt - Cairo
  • December 2004 to November 2007

AL AHLY REAL ESTATE DEVELOPMENT Co. (Hussein SABBOUR), Cairo, Egypt.
(December 2004~November 2007, as a Site Construction Engineer)
Description of duties:-
-Supervision over various stages of construction.
-Reviewing and approving shop drawing details.
-Performing and reviewing bill of quantities.
-Supervision over various stages of Electrical, Telephone, Lighting, water& sewage
networks.
-Participated in supervision of compound landscape.
Projects:-
• Darah Gardens: Is a compound of 220 residences in October City, Giza.

Design Structural Engineer at EGYPTIAN ENGINEERING GROUP, Cairo, Egypt.
  • Egypt - Cairo
  • February 2003 to December 2004

Description of duties:-
-Design, Full analysis and detailing of reinforced concrete structures.
-Performing and reviewing bill of quantities.
-Reviewing and approving shop drawing details.

Site Construction Engineer at CAIRO ENGINEERING GROUP, Cairo, Egypt
  • Egypt - Cairo
  • November 2002 to February 2003

CAIRO ENGINEERING GROUP, Cairo, Egypt.
( November 2002~ February 2003, as a Site Construction Engineer)
Description of duties:-
-Supervision over various stages of construction.
-Performing and reviewing bill of quantities.
-Reviewing and approving shop drawing details.
Projects:-
-Supervision over various construction stages of six private residences in New Cairo, Cairo.


(NOTE): Certificates and references will be furnished upon request.


BEST REGARDS

Education

Bachelor's degree, Civil Engineering
  • at Cairo University
  • June 2002

- University Graduation:- - B.Sc., Civil Engineering, Cairo University, Egypt, 2002. - Accumulative Grade: “Good” - Graduation Project: Sanitary Engineering Design. - Project Grade: “Distinction” - Secondary Graduation:- - MAADI Canal School (Language School), Cairo, Egypt, 1997. - Courses:- - Management of Project Resource, American University in Cairo, Egypt, 2007. - Project Planning and Control Techniques, American University in Cairo, Egypt, 2007. - Specific contracts and International Construction Contracts (FIDIC), American University in Cairo, Egypt, 2008. - Project Budgeting and Financial Control, American University in Cairo, Egypt, 2009. - Project Bids and Contracts, American University in Cairo, Egypt, 2009. - Value Analysis for Engineering Projects, American University in Cairo, Egypt, 2009. - Professional Program in Project Management, American University in Cairo, Egypt, 2009. - Project Management Professional (PMP) Preparation Course, RITI, Egypt, 2010.

High school or equivalent, Thanawya Amma
  • at MAADI Canal School
  • January 1997

- MAADI Canal School (Language School), Cairo, Egypt, 1997.

Specialties & Skills

Team Building
Job Scheduling
Technical Issues
Demand Forecasting
Lead Management
CHANGE ORDERS
CONTRACTS
CORRESPONDENCE
Autocad
MILLION
PAYMENTS
PRE-CONSTRUCTION
PROGRESS
Microsoft Office Word, Excel, Powerpoint, Outlook
Primavera

Languages

Arabic
Expert
English
Expert
French
Beginner

Memberships

Egyptian Syndicate of Engineers, Cairo, Egypt
  • Member
  • January 2003
SAUDI COUNCIL OF ENGINEERS
  • Civil Engineer
  • January 2013

Hobbies

  • Playing Football, Running